Construction unit self-inspection report [4]
Article 1 Self-inspection report of the construction unit
The Jingxuan Lake, Coconut Jingxuan and basement project of Insurance City-Century Oasis Garden is 72,306.46 meters, with frame shear wall structure/seventeen floors above ground and two floors underground, precast pile foundation and manual digging pile foundation. It was newly built by Dongguan Houjie Real Estate Company and Dongguan Hien Kim Real Estate Development Co., Ltd., designed by Beijing Zhonghua Architectural Planning and Design Institute, supervised by Guangdong Construction Engineering Supervision Co., Ltd. and undertaken by Dongguan Nanyue Construction Engineering Co., Ltd., which started in June 2007 and was completed in June 2009. From the start to the completion of the project, our construction unit strictly controls the quality of building materials, and they are all qualified after inspection. Only after supervision and verification by Party A can it be put into use. The foundation, main column and floor slab shall be inspected by specially-assigned personnel in cooperation with construction personnel, and quality supervision, design and supervision personnel shall be invited to the site for supervision and inspection, which basically meets the design and specification requirements. In terms of decoration, the flatness of the floor and the verticality and flatness of the wall are carefully controlled, thus avoiding the empty drum phenomenon of this project.
After the project is completed, our company has special personnel to inspect the unit project, namely outdoor wall, horizontal and vertical angle of external wall, aproll slope, steps, open ditch, drip line, deformation joint, downpipe, roof slope direction, roof details, roof protective layer, indoor ceiling, indoor wall, floor slab and floor, stair tread, bathroom bathtub, balcony flooding, joinery, guardrail, etc.
Article 2 Self-inspection report of the construction unit
In order to conscientiously implement the spirit of the video teleconference of the Ministry of Housing and Urban-Rural Development to rectify and standardize the order of the construction market, the municipal government's "Opinions on Comprehensively Standardizing the Construction Market in this Municipality and Further Strengthening the Quality and Safety Management of Construction Projects" and "Implementation Plan for Comprehensive Law Enforcement Inspection of Rectifying and Standardizing the Construction Market in * * District" were implemented. My unit immediately called relevant personnel to publicize the spirit of the meeting and set up a leading group for engineering safety and quality management. 1, set up a leading group for safety and quality management of municipal engineering in the future science and technology city.
Team leader: xx
Deputy leader: xxxx
Team members: xxx, xxx, xxx, project manager of each bid section and chief supervision engineer. Attached is the list of groups and contact information.
Responsibilities: Responsible for implementing self-examination and self-correction of self-management projects, organizing joint inspections to conduct spot checks and comments on self-examination and self-correction, comprehensively rectifying illegal measures, actively cooperating with this special governance work, and establishing a long-term supervision and inspection mechanism.
2, clear the key inspection and rectification content.
1, whether it is implemented according to the requirements of environmental protection, safety and quality in the construction contract.
2, whether the construction site to establish a safety and quality management guarantee system, environmental protection management system and green construction guarantee measures.
3. Does the construction organization design include effective measures to prevent dust, noise, solid waste and wastewater from polluting the environment?
4, environmental protection funds are earmarked.
5, whether the management personnel and workers for environmental protection laws and regulations knowledge and civilized construction training and assessment.
6. Whether the construction site is equipped with "five certificates and one map" and supervision telephone number, and whether there are environmental protection propaganda slogans.
7. Whether the on-site materials are put in classification code and neatly packed, and whether the material identification is clear and accurate.
8, whether to manage the construction site dust. Whether the earth transportation vehicles are tightly covered and cleaned in time.
9. Whether the safety officer holds relevant certificates and meets the number requirements.
10, implement the project chief supervision engineer responsibility system, equip with sufficient and professional supporting supervision personnel, and carry out supervision work in strict accordance with supervision procedures.
1 1. Does the supervision engineer conduct supervision and inspection in a timely manner in various forms such as standing by, patrolling and parallel inspection according to the requirements of engineering supervision specifications?
Article 3 Self-inspection report of the construction unit
In order to further do a good job in flood control, ensure the safety of flood control, protect the lives and property of the people in our town, maintain normal production order and maintain social stability. According to the meeting spirit of Chongqing Flood Control and Drought Relief Headquarters and the requirements of Bi Xun [XX] No.3 document, from March 20th to April 60th, our town, headed by Mayor Zhou Liang, formed a pre-flood safety inspection team, which made a major inspection on the current situation of water conservancy projects, river barrier construction, emergency material management, reservoir dispatching and river-related construction projects within the jurisdiction of Luda Town, and registered hidden dangers and phenomena.
Due to the floods in recent years, it has caused great economic losses to our town. Therefore, we have established the idea of putting people first, building a harmonious society and ensuring the safety of one party, and have done a solid job in flood control this year.
The second is to strengthen leadership and implement responsibilities.
According to the requirements of the document, our town has set up a leading group for flood control and drought relief, with the mayor as the team leader, the deputy mayor and the deputy secretary of agriculture as the deputy team leader, and the relevant personnel of the Agricultural Office and the Agricultural Service Center as members. Responsible for flood control and disaster relief of important reservoirs, Shanpingtang, Shihe weir and dangerous sections of rivers within the jurisdiction, supervise and implement the flood control scheme of water conservancy projects formulated by relevant units, establish flood control duty system, set up flood control teams and make good reserves of flood control materials, and be responsible for emergency rescue and disaster relief within the jurisdiction.
Third, implement the duty system in flood season.
Four. Safety inspection before flood season
After inspection, first, there are pear trees on the water storage in dalu town; Second, due to the repair of Chongqing-Suiyuan Expressway, the culvert of Yanwodang Reservoir is blocked; Thirdly, the Shihe weir of Manaozui in Shidao was blocked by the restoration of Chongqing-Suiyuan Expressway. No other safety hazards were found.
We are actively dealing with pear trees in the reservoir. It is suggested that the higher authorities should solve the problems of culvert blockage and river blockage caused by Yanwei Expressway in Yanwodang Reservoir and Manaozui Shihe River in Shidao.
Article 4 Self-inspection report of the construction unit
I. Implementing the Responsibility System for Safety in Production In order to clarify the responsibilities, a leading group for safety in production was established, with the company manager as the team leader, the deputy manager in charge of safety as the deputy team leader, and the project manager and full-time safety officer as members. Establish the concept of "people-oriented, safety first" in the work, and put forward the requirements of "safety must be managed and understood in production" for the management personnel of each project department. Each project department is equipped with full-time security officers, and has formulated a post responsibility system for safety production suitable for the characteristics of the project department. The responsibility system for production safety is decomposed layer by layer, and the main body of responsibility is strictly implemented, so that the responsibilities are clear, the responsibilities are assigned to people, and the work of production safety is carried out smoothly.
Second, check the situation.
1, the implementation of safety production responsibility system and various safety management systems of each project department;
2, the implementation of safety protection facilities on the construction site;
3. The implementation of safety measures such as fire prevention and heatstroke prevention during construction;
4, the construction site vertical transportation equipment, scaffolding, construction electricity, formwork support and "three treasures and four ports" protection and other safety special rectification;
5. Whether the safety information on the construction site is complete, the implementation of the rectification of potential safety hazards and the cancellation of the case;
6, all kinds of safety management personnel and special operations personnel related certificates.
This time, we mainly inspected xxx project department, xxx project department, xxx project department, etc. The inspection shows that the awareness of safety production of each project department has been greatly improved, and the safety management of the construction site has been strengthened. Can conscientiously implement the responsibility system for production safety and various safety management systems, equipped with full-time security officers, safety management information gradually standardized. The "five certificates and one map" on the construction site can basically be set in place, and the construction is basically closed.
What is worth bearing is that our xxx project department can firmly establish the consciousness of "quality first, safety production is more important than Mount Tai" and actively carry out the activities of "safety and quality standardization demonstration project", and its management level of safety production and civilized construction has been continuously enhanced, which has won unanimous praise from the owner's department.
Third, there are problems.
1, Ideological education: Some employees are lax and paralyzed about safety work, and there is a paralyzed mentality that the accident has nothing to do with me. They violate labor discipline at work and take chances.
2. Safety data: A few project departments failed to collect and sort out according to the provisions of the company's construction site safety management measures, and the special safety construction plan and safety technical disclosure data were incomplete.
3. Civilized construction: some materials on the construction site are piled up in confusion, warning signs are hung improperly, and the configuration of fire fighting equipment is unreasonable.
4. Scaffolding: scaffold materials in a few construction sites are poor, sweepers and scissors are not tied in place, and scaffolding boards are not laid in place as required.
5. "Three treasures and four mouths" protection: very few workers on the construction site did not wear safety helmets.
6. Power consumption for construction: the distribution box of some project departments is damaged and unlocked, and the power cord is not hung properly.
Four. Handle opinions
For the project department that fails to construct safety production according to the company's specifications in this safety inspection, it is required to make rectification and put it in place, and informed criticism will be punished according to the company's management system.
Verb (abbreviation of verb) the next stage of work
1. Require all project departments to firmly establish the policy of "safety first, prevention first, comprehensive management", strengthen leadership, enhance safety responsibility awareness, and truly implement safety production.
2. Seriously study the laws, regulations and relevant provisions, further implement the safety responsibility system at all levels, do a good job in safety disclosure of each project, strictly implement the safety operation procedures, increase the education and training of workers' safety production, and further improve the standardization level of safety management information.
3. Strengthen self-examination and self-correction on the construction site, strictly implement the system of holding certificates for safety management personnel and special operations personnel, and extensively carry out publicity and education on safety production of construction personnel to further improve their safety awareness.
4. Establish and implement the industrial injury insurance system. Each project department should handle work-related injury insurance for employees, organically combine work insurance with construction safety management, and further improve the safety of employees.
5, highlight the key points, continue to deepen the special rectification of production safety accidents, and further promote the safety standardization of on-site management. Organize a monthly and quarterly safety inspection regularly, strengthen on-site inspection, and eliminate hidden dangers of accidents in the bud.
- Previous article:What are the * * * governance projects of Party building?
- Next article:How to write the examination paper for grade one?
- Related articles
- Eight articles on trade union activity plan
- Which city does Chongzuo City in Guangxi belong to?
- Mental health motto
- What does Pringles¡¯ slogan mean?
- Compliance with mine regulations (Landmine Convention? Agreement? What is the specific content of)?
- Activity plan for Community Firefighting Day
- A short story about etiquette
- The more poems and stories about Qinhuai River, the better! Tell me what you know!
- Selected Works on Advanced Personal Deeds of Forest Fire Prevention
- How to write the proposal of drug dealers association against driving up the price of Chinese herbal medicines?