Joke Collection Website - News headlines - Selected examples of emergency plans to prevent typhoons and rainstorms

Selected examples of emergency plans to prevent typhoons and rainstorms

In study, work and even life, Baobuqi will encounter some unexpected events or accidents. In order to minimize the harm, it is usually necessary to prepare a complete emergency plan in advance, which I will share with you below. Selected examples of emergency plans to prevent typhoons and rains, welcome to read!

Emergency plans to prevent typhoons and rains Part 1

With the arrival of the rainy season, according to Liuyang Municipal Work Safety Supervision and Administration Bureau has issued a notice on the current safety work of non-coal mining enterprises. Flood prevention work is imminent. In order to survive the floods safely, our mine has formulated an emergency plan for flood prevention and flood prevention, established a flood prevention and flood prevention leading group, and equipped it with sufficient materials, equipment and other flood and flood prevention supplies to ensure that the mine can safely and smoothly pass through the flood season. The emergency plan is as follows:

1. Emergency principles:

Our mine adheres to the principle of focusing on prevention, combining prevention with robbery, unified command, unified dispatch, obeying the overall situation, and carrying forward the principle of unity to fight floods spirit, under the unified guidance of the Mine Flood Control Leading Group, actively cooperate and unite to ensure that the mines survive the floods safely.

2. Work plan:

Develop a flood prevention safety management system, ensure that all members have flood prevention awareness, and implement the system to all teams and personnel. Timely conduct education on safe flood preparedness and safety responsibility education on flood prevention. Regularly check the readiness of flood control materials and the operation of flood control equipment to ensure emergency response when floods come. Strengthen logistics support and service work to ensure the safety of personnel, materials, equipment and on-site work.

3. Establish a flood control frontline headquarters and clarify responsibilities:

Commander-in-Chief:

Deputy Commander-in-Chief:

Members: < /p>

Commander-in-Chief: Responsible for overall mine-wide flood control and unified command of flood control work.

Deputy Commander-in-Chief: Responsible for implementing preemptive plans and mobilizing flood-fighting personnel and necessary supplies. Prepare emergency equipment in a timely manner, quickly travel to the designated location according to the commander-in-chief's orders, and be responsible for the food, accommodation and other matters of the disaster relief personnel.

Members: Carry out the instructions of the commander-in-chief and be responsible for the supply and storage of flood control materials, the deployment and transportation of equipment and all related matters of rescue work. Medical team: composed of staff from Nanyue Village Health Center, responsible for treating those injured during the rescue process.

4. Emergency plan:

(1) Establish a frontline flood control headquarters under the command of the mine director, divide responsibilities, clarify responsibilities, ensure that responsibilities are assigned to people, and strengthen dispatching, Ensure that all actions are directed and all actions are subject to command. When the flood season comes, assign dedicated personnel to be on-site and set up a flood prevention and rescue team.

(2) Make a material supply plan and arrange the preparation of flood control materials. Before the flood season comes, prepare enough woven bags, sand, water pumps, shovels, raincoats and other flood control materials.

(3) The loaders and generators deployed at the rescue site should be maintained and repaired to ensure that the equipment can operate normally when the flood season comes and that the equipment can fully play its emergency role during special periods.

(4) Materials and equipment on the ground that are threatened by floods will be arranged by the mine commander and moved to a higher safety area as much as possible.

(5) The commander-in-chief should organize flood control teams to clear flood drainage channels as much as possible according to changes in water levels to minimize property losses in the mine.

(6) The custody team is headed by Xie Xiyuan, who must distribute the tools, materials and supplies needed for flood fighting and rescue work in accordance with the requirements and instructions of the headquarters to ensure that the flood fighting and rescue work can proceed smoothly.

(7) The medical team is composed of medical staff from Nanyue Village Health Center. During the rescue period, medical staff must go to the scene to provide timely treatment to those injured during the rescue process. Those who are seriously injured must be sent to the hospital for treatment in a timely manner.

(8) Xie Haibo is in charge of the car team. During the rescue period, enough cars must be prepared to transport the injured and medical staff.

(9) The communication team is headed by Xiong Shanbao. After the accident, he is responsible for convening flood rescue personnel and contacting relevant superior units, and reporting the relevant spirit and instructions of superiors to the commander-in-chief in a timely manner.

(10) If the accident is too big for the unit to handle, the mine rescue team should be notified immediately to request rescue. Note: This emergency plan can only be implemented after a flood accident occurs.

5. Preparation quantities and storage locations of emergency equipment and materials:

Factory storage room

Emergency plan for typhoon and rainstorm Part 2

In order to fully implement the flood prevention work policy of "safety first, always be prepared, put prevention first, and make every effort to rescue", we urgently respond to local heavy rain disasters and ensure the safety of people's lives and property. This plan is formulated in accordance with the spirit of documents such as the "Responsibilities of Administrative Heads of Local People's Governments at All Levels for Flood Prevention and Drought Relief" issued by the General Administration of Defense of the People's Republic of China.

When a sudden local heavy rain disaster occurs, the main leaders of the county party committee and county government will take the lead and organize relevant departments to study the situation and make decisions quickly based on the danger and disaster situation. The county flood control headquarters issues an order to activate the plan. The township and town governments where they are located will implement the specific implementation.

1. Responsibilities of the Flood Control Headquarters Office

Under the leadership of the city and county flood control headquarters and the county party committee and county government, keep abreast of important weather information and conduct timely rain and flood warnings , convey superior rescue and disaster relief instructions, orders, etc., actively organize and coordinate rescue and disaster relief operations of various departments and units, collect, organize and report rain conditions, flood conditions, dangers, disasters, and rescue and disaster relief situations.

2. Rescue and disaster relief responsibilities of the township people’s government and the member units of the county flood control headquarters

Heavy rainfall occurs in the local area, causing damage to farmland, roads, highways, drinking water, power facilities, and communication facilities After a house is washed away, a house collapses, or a flash flood, mudslide, or landslide occurs in the southern mountainous area, all township governments and member units of the county flood control headquarters must take active actions, vigorously cooperate, and work together to provide rescue and disaster relief in accordance with their respective responsibilities.

1. The township and town government where it is located

The township (town) head and village director who are the first persons responsible for flood control must rush to the scene as soon as possible to direct emergency rescue and disaster relief, and handle emergencies. Investigate and understand the disaster situation, quickly organize township (town) and village cadres, flood drainage machinery and equipment to eliminate floods, urgently relocate the masses, properly resettle homeless people, organize the masses to rescue themselves and each other, and restore the production and life of the disaster-stricken people as soon as possible , and quickly reported the disaster situation to the county government, the county flood control headquarters office, and the Civil Affairs Bureau.

2. The County Planning, Construction and Housing Security Bureau

Quickly dispatch personnel to the disaster site to deal with the danger, help the people evacuate from the dangerous area, use municipal engineering equipment, and clear drainage pipes and flood discharge channels , ensure that the drainage and drainage pipe network is smooth. The disaster situation will be reported to the county government and the county flood control headquarters office as soon as possible.

3. The Bureau of Land and Resources

Quickly dispatched an emergency investigation team to the disaster area to conduct geological disaster investigation, organized towns and villages to urgently transfer the threatened people to safe areas, and reported to the county government and the county government within the specified time limit. The county flood control headquarters office reported the disaster.

4. Relevant departments

The agricultural department should deploy personnel to conduct detailed investigations and verifications of the area, type and extent of damage to crops, and assist in emergency rescue and disaster relief.

The civil affairs department should conduct village-by-household inspections of collapsed and dilapidated houses, assist towns and villages in relocating them, arrange for disaster victims and prepare sufficient relief tents and necessary daily necessities to ensure that the victims have food and food. We have clothes to wear, clean water to drink, and a place to live.

The transportation department must promptly deploy machinery to repair emergency roads and restore smooth traffic as soon as possible.

The water affairs department should actively provide technical guidance for the entire rescue process.

The food department must actively provide food and oil supplies to the victims.

The financial department should actively raise and allocate funds needed for disaster relief.

The power department must promptly dispatch personnel to repair water-damaged power lines.

The Ministry of Human Resources and Armed Forces must mobilize militia reserves to support local township governments in emergency rescue and disaster relief.

The public security department must do a good job in maintaining social security during emergency rescue and disaster relief, and prevent bad guys from sabotaging.

Supply and marketing, commerce, and material departments must prepare emergency and disaster relief materials and tools and wait for orders.

The health department should actively provide health and epidemic prevention and medical rescue in disaster-stricken areas.

Meteorological departments should conduct intensive observations and forecasts of heavy rainfall and release rain information in a timely manner.

The radio and television departments must promptly announce important weather information and emergency and disaster relief instructions to the public through television.

The development and reform department should assist the water conservancy department in arranging and reporting water damage restoration plans and securing projects.

The county telecommunications bureau, county mobile company, and county China Unicom must ensure smooth telephone communication and smooth network.

The education department must quickly evacuate teachers and students from dangerous school buildings.

The tourism department must quickly evacuate or evacuate tourists from dangerous areas.

The economic and trade departments must quickly evacuate workers and property from factories, mines, enterprises and units threatened by floods.

The forestry department should make statistics on forest damage due to water damage and actively assist township governments in emergency rescue and disaster relief.

3. Organizational disciplines for local heavy rain emergency and disaster relief

When sudden heavy rainfall occurs, local government (township, town) and village leaders must rush to the scene as soon as possible. Take command from the front and decisively organize emergency rescue and disaster relief. The person responsible for the flood control administration shall not leave the flood control work station without authorization, and must strictly implement the 24-hour flood control on-duty system, promptly transmit and release rain, flood, danger, and disaster information, and late, concealed, omitted, and false reports of disasters will cause flood control and emergency disasters. Serious mistakes in work; those who fail to implement this plan, fail to perform their respective responsibilities and flood prevention and rescue instructions, resulting in casualties or major economic losses, will be seriously investigated and punished in accordance with the provisions of the "Provincial Administrative Liability Investigation Measures for Major Flood Prevention Safety Accidents".

Emergency Plan to Prevent Typhoon and Rainstorm Part 3

Due to the low-lying terrain of the school and the poor drainage system of Shenhe Road, whenever there is a heavy rainstorm, the campus will accumulate water seriously (the water depth reaches 30cm-50cm ). In order to promptly and properly handle the campus water accumulation incident during heavy rain, ensure the safety of teachers and students' lives and property, and maintain the normal teaching, work and life order of the school, this plan is specially formulated.

1. Scope of application

Heavy rains and water accumulation on campus affect normal education, teaching and living order.

2. Organizational structure

The school has established an emergency management leading group for campus water accumulation events in heavy rain weather, which is organized by the principal to provide unified command and coordination to complete emergency tasks together. .

Team leader:

Deputy team leader:

Members:

Each class teacher is on duty that day

The leading group has an office, and __ also serves as the office director.

3. Emergency measures

(1) General conditions (heavy rainy weather can still maintain the order of education, teaching work and life)

1. Teachers on duty that day insist on Posts, strengthen management, maintain the order of student activities, and on-duty leaders strengthen inspections to handle accidental incidents in a timely manner.

2. During the school dismissal period, all members of the leadership team are in place to effectively organize students to dismiss from school, maintain order for students to dismiss from school, and ensure that students are dismissed from school safely.

3. Lunch is delivered to students from the cafeteria to each floor for distribution. After lunch, students go to their respective classrooms to eat. The head teacher of each class assists the teachers on duty on the floor to organize students to prepare meals; assists the canteen staff to deliver meals to each floor.

(2) Special circumstances (heavy rainy weather cannot maintain the order of educational work and life)

1. Report to the superior authority as soon as possible and ask for instructions for students to take a holiday.

2. After receiving approval for the vacation, notify the head teacher of each class to contact the parents of the students by phone and hand each student over to the parents for pickup.

3. All members of the leadership team will be on site to maintain order after school, organize students’ holidays in an orderly manner, and do a good job in related work. The floor leaders are in place: __ on the first floor; __ on the second floor; __ on the third floor.

4. After the rain clears, organize personnel to clean up the campus and carry out sterilization and disinfection on the campus.

4. Liability Investigation

During the emergency process, if one of the following situations occurs, the relevant personnel will be held accountable depending on the circumstances. If a safety accident is caused, the judicial authorities will be held criminally responsible. .

1. Disobey the command of the leadership group and delay in executing as required.

2. Failure to perform duties on site.

3. Neglect of duty, dereliction of duty, dereliction of duty, or making mistakes at work.

Emergency plan for preventing typhoon storm Part 4

In order to ensure that when a destructive rainstorm occurs in the mineral processing plant, all emergency work can be carried out efficiently and orderly, minimizing the number of personnel Casualties and property losses, according to the State Council's "Regulations on Heavy Rainstorms in Damaged Areas" and combined with the actual work of our plant selection, this specially prepared plan

1. Composition of emergency agencies

1. Leading group

The work of preventing heavy rain disasters in the selection plant is organized and implemented under the leadership of the superior leadership group for heavy rain disaster prevention and reduction. The leading group for rainstorm prevention and disaster reduction in the processing plant is headed by the factory director, with the deputy factory director and the heads of each section as team members, and the dispatching department in the processing plant as the headquarters.

2. Main responsibilities

(1) Strengthen leadership, improve organization, strengthen work responsibilities, strengthen familiarity and understanding of destructive rainstorms and rainstorm disaster prevention and reduction work, and improve various emergency response measures Formulation of plans and implementation of various measures.

(2) Make full use of various channels to carry out publicity and education on earthquake disaster knowledge, organize and guide the popularization and education of full-length earthquake prevention and earthquake resistance knowledge, extensively carry out self-rescue and mutual rescue training in earthquake disasters, and continuously improve The majority of employees have awareness and basic skills in earthquake prevention and resistance.

(3) Earnestly carry out various material guarantees, actively prepare in strict accordance with the requirements of the plan, implement food and drinking water, anti-freeze and rain protection, emergency equipment and other materials, and strengthen management to maintain good combat readiness.

(4) After the occurrence of destructive heavy rains, all necessary means shall be adopted to organize all forces to carry out comprehensive disaster reduction work to minimize the losses caused by disasters.

(5) Allocate all positive factors to quickly restore production order and fully ensure the stability of production and employees' lives.

2. Earthquake emergency response

1. After receiving the heavy rain or impending rain warning (warning) report from superiors, the leading group immediately enters a war-prepared state and releases relevant information and warnings in accordance with the law. Fully responsible for all earthquake resistance work. All relevant organizations are ready to carry out rain prevention and disaster reduction tasks at any time.

2. Organize relevant personnel to conduct a comprehensive inspection of the affiliated buildings, block and close dangerous places, and stop various large-scale activities.

3. Strengthen the management of flammable and explosive items, toxic and hazardous chemicals, and strengthen the protection of important equipment and places in large boilers, power transmission rooms, and hangars to ensure the smooth progress of earthquake resistance and disaster reduction.

4. Increase publicity and education among employees and ensure their ideological stability.

5. Strengthen various types of duty duties, maintain smooth communication, timely grasp the situation at the grassroots level, and make every effort to maintain the order of plant production and life.

6. Implement various material preparations according to the plan.

3. Post-earthquake emergency operations

1. Regardless of whether there is a forecast or warning, after a destructive heavy rain occurs in the area or adjacent areas, the leadership team will immediately go to the local area to command Therefore, all emergency and disaster relief teams must assemble in their units and be on standby within one hour after the earthquake

2. The leadership group, under the unified organization and command of the superior, quickly organizes factory selection and rescue and disaster relief

(1 ) quickly issued an emergency alarm (continuous rapid bells and shouts) and organized the evacuation of all personnel still stranded in various buildings: employees in each section were organized by the section chief and deputy section chief to enter shelter from the rain.

(2) Quickly close and cut off the bookstore (except for the emergency lighting system) to prevent other disasters after heavy rain.

(3) Quickly carry out on-site rescue work with rescue personnel as the main content, and promptly transfer the injured to the nearby rescue station for rescue.

(4) Strengthen the protection of important facilities and important items.

3. Actively carry out ideological propaganda and education work among employees, eliminate panic, stabilize people's hearts, quickly restore normal order, and make every effort to maintain social security and stability.

4. Quickly understand and grasp the disaster situation of the processing plant, and promptly summarize and report to the company office.

4. Others

1. After entering the emergency state of heavy rain, the plant selection headquarters will issue various orders and instructions through various methods. The earthquake prevention and disaster reduction leading group will give instructions by phone and dictation. convey various orders and instructions in other forms.

2. In emergency operations for earthquake relief and disaster reduction, we must cooperate closely, obey orders, and ensure the smooth flow of government orders and the implementation of various tasks.

Chapter 5 of the emergency plan to prevent typhoon storms

In order to further improve the emergency response to natural disasters such as high temperature season, heavy rainfall, rain and snow weather, and prevent the need for the elderly and staff in nursing homes. causing heavy losses to lives and property, this emergency plan has been specially formulated.

1. Emergency organization structure

1. Extreme weather emergency working group

Team leader: __

Deputy team leader: __ < /p>

Team members: Team leaders and team members Responsibilities:

(1) Do a good job in daily inspections, implement the safety production responsibility system, and guard against extreme weather (high temperature, heavy rainfall, rain snow).

(2) Once extreme weather (high temperature, heavy rainfall, rain and snow) causes large-scale power outages and other accidents, relevant emergency work should be done in a timely manner and power supply should be restored as soon as possible.

(3) Decide whether to activate the emergency plan based on the impact of extreme weather (high temperature, heavy rainfall, rain and snow).

(4) Report the disaster situation to superiors in a timely manner and take effective measures to actively respond.

(5) Request external support when necessary.

(6) All members should perform their duties and responsibilities under the unified command of the team leader, and work together to prevent extreme weather.

2. Extreme weather emergency rescue team

Captain: __

Team members: __

(1) Normally strengthen the power distribution room, Safety inspection of fire protection systems, electrical circuit systems, and water and electricity rooms.

(2) When extreme weather (high temperature, heavy rainfall, rain and snow) simultaneously triggers a disaster, organize personnel to carry out rescue operations.

(3) Report the consequences of extreme weather (high temperature, heavy rainfall, rain and snow) to the natural disaster emergency team in a timely manner.

(4) Summarize the emergency response work experience afterwards.

(5) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), promptly organize the transfer of the elderly in the hospital to a safe area to ensure the safety of the elderly in the hospital.

2. Emergency procedures

1. Emergency procedures for nursing homes

(1) In the event of extreme weather (high temperature, heavy rainfall, rain and snow), emergency response procedures should be carried out quickly Take appropriate emergency measures.

(2) Timely report to the leader of the natural disaster emergency working group (notify the general shift leader at night) and report specific disasters caused by natural disasters (high temperature, heavy rainfall, rain and snow) (such as lightning strikes and fires, lightning strikes and power outages) , equipment failure caused by lightning strikes, floods, etc.).

(3) If during normal working hours, if time permits, the office should notify various departments by phone and other forms to actively organize responses and try to avoid unsafe incidents.

(4) If time is urgent, you should immediately report to the leader of the natural disaster emergency working group (notify the general leader at night), explain the details, issue a notice to all departments, and promptly arrange for the nursing team to properly arrange for the elderly to do Do a good job in avoiding risks. In the event of a strong thunderstorm, all teams should be reminded to cut off the power supply of electrical equipment to prevent lightning strikes from damaging the equipment.

(5) If extreme weather causes floods, personnel should be organized immediately to fight the floods.

2. Emergency procedures for each team

(1) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), each team should turn off all electricity usage as permitted. The power supply to the equipment must be cut off first and then put into use after the weather returns to normal.

(2) After receiving notification of natural disasters (high temperature, heavy rainfall, rain and snow), immediately prepare for fire prevention, flood prevention, and power outage prevention.

(3) In the event of a power outage caused by a sudden natural disaster (high temperature, heavy rainfall, rain or snow), each team should be notified immediately to turn on emergency lighting, activate backup power in a timely manner, and promptly notify the electrician or person on duty Actively cooperate with disposal.

(4) Strengthen inspections of the elderly’s rooms to comfort the residents, and pay attention to fire prevention, flood prevention, and electric shock prevention.

3. Safeguard Measures

1. The office strengthens self-examination and self-correction of potential safety hazards in the hospital, and solves problems immediately if found.

2. Safety officers implement a 24-hour duty system to ensure that they are on call 24 hours a day.

3. The service room is regularly equipped with emergency lights, flashlights and other lighting supplies, which should be inspected regularly and kept in good condition.

4. The clinic should strengthen daily management, keep emergency calls open, and be equipped with sufficient treatment drugs.

5. The office should organize emergency response drills for extreme weather (high temperature, heavy rainfall, rain and snow). Through the drill, everyone will be familiar with the emergency response procedures for extreme weather (high temperature, heavy rainfall, rain and snow). , to ensure the safety of life and property of all personnel in the nursing home.

Relevant articles on selected examples of emergency plans to prevent typhoons and rainstorms:

★ Summary of 5 examples of 2020 flood prevention and disaster relief learning experience

★ Review of flood prevention and disaster relief work 5 selected articles of reflections

★ 5 articles of reflections on learning advanced deeds of flood fighting and disaster relief in 2020

★ School emergency plan for typhoon prevention

★ May Day The latest version of 7 Labor Day activity planning plans

★ Selected sample essays on safety production month activity summary

★ Ten important instructions for coordinating flood prevention and relief work in 2020

< p> ★ 2022 selected typhoon and rain emergency response plans

★ 10 selected 2021 flood prevention and rescue work summary examples

★ 3 power safety activity summaries