Joke Collection Website - News headlines - Wall chart of construction site safety
Wall chart of construction site safety
Project site
construction unit
Design organization
Supervision unit
construction organization
Quality inspection unit
Safety inspection unit
covered area
structure level number
building height
construction cost
start time
completion date
Project manager
Builder's license
Safety production license. When entering the construction site, you must abide by the safety production rules and regulations. Second, enter the construction area must wear a helmet, fasten the hat belt, mechanical operators must wear protective hats. Three, the "four ports" and "five sides" in the project under construction must have protective facilities. Four, the scene is not allowed to barefoot, are not allowed to wear hard shoes, high heels, bell bottoms and drunken homework. Five, aerial work must fasten your seat belt, seat belt hung high and used low, aerial work is strictly prohibited to wear leather shoes or shoes with nails. Six, non-operating personnel are not allowed to enter the construction danger zone. Seven, without the approval of the construction director, shall not be arbitrarily dismantled shelf facilities and safety protection devices. Eight, it is forbidden to throw materials, tools, bricks, stones, construction waste and other items from the sky. Nine, the erection of wires must comply with the provisions of the "Regulations", electrical equipment must have a protective zero device. Ten, the dangerous area of the construction site should have warning signs, night lighting warning. Civilized construction card 1 piece. Management personnel at all levels in the construction site must abide by various management systems, so that the site is clean, hygienic, safe and the fire-proof roads are unblocked. Second, according to the construction organization design layout layout materials and machinery and equipment, set up the construction dump, shall not throw materials and debris, timely clean up the scattered materials and construction waste. Three, temporary occupation of roads must go through the relevant formalities with the relevant departments. Four, the construction site to achieve smooth roads, drainage channels, according to the construction organization design layout layout circuit, water supply and drainage lines, do not leak water pipes, wires do not leak. Five, the scene should be equipped with men's and women's toilets, sewage and defecation facilities. Six, it is strictly prohibited to take drugs, prostitution, gambling, fighting, theft and other "seven evils" activities in the construction site, offenders to the public security organs. Seven, night construction must be approved by the competent department and publicity, social understanding rear can construction. Eight, the construction site should comply with the relevant national environmental laws and regulations, take measures to control the scene of all kinds of dust, garbage discharge, solid waste treatment and noise and vibration of environmental protection measures. Fire protection card 1. Set up a project security leading group and amateur fire brigade, improve various fire security systems, and arrange on-site fire security work according to the construction organization design. Two, the construction site must be set up the guard, workers in and out of the construction site must wear badges, it is forbidden to non-operating personnel and their families to stay in the construction site. Three, strictly implement the hot work examination and approval system, without approval, no one may use open flame at the scene. Four, strictly implement the provisions of the storage, storage and use of flammable and explosive materials, carpentry room and other flammable places must be cleaned up after work, no smoking, and equipped with a sufficient number of fire equipment. Five, strictly implement the construction site temporary electricity safety technical specifications, non-electrical appliances, wires are strictly prohibited. Six, each dormitory must set up a person in charge of fire prevention, indoor smoking is strictly prohibited in bed, cigarette butts must be placed in an ashtray or container. Seven, must ensure that fire exits, stairs, walkways and roads leading to fire hydrants, water sources, etc. 8. No one is allowed to move or damage the fire-fighting equipment set at the site at will. Call 1 19 immediately when finding a fire. List of management personnel and supervision of telephone cards Project manager: Deputy project manager: technical director: builder: quality inspector: safety officer: documenter: material engineer: cost engineer: carpenter: mason: electrician: steel worker: mason: team leader: deputy head of public security leading group: member: team leader: deputy head of fire leading group: member: supervision telephone number:
The contents of the four systems are as follows: 1. Safety production management system 1. Implement national and local laws and regulations on safety production and various safety management rules and regulations. Two, establish and improve the responsibility system for production safety of production management personnel at all levels and front-line workers. Three, the project safety measures must be complete and in place. Safety technical data must be complete, no construction is allowed without safety measures, and safety facilities without acceptance are not allowed to be used. Four, adhere to the special type of work related certificates, according to the provisions of the special type of work experience, training and assessment, and issued a certificate; Untrained operators are not allowed to work at their posts. Five, regular safety education for employees, new workers should be "level 3" safety education after admission. New workers and workers who change jobs are not allowed to enter the site without safety education inspection. Six, timely report industrial accidents, and seriously deal with those responsible for attempted accidents. Seven, safety net, seat belt, safety helmet must have a material certificate, safety net, seat belt used for more than half a year must be inspected before use. Eight, mechanical equipment safety device is complete and effective, hand-held power tools must all be equipped with safety leakage protectors. Nine, construction electricity conforms to the safety operation procedures. Ten, any mechanical equipment are not allowed to work in spite of illness. Eleven, the use of new technology, special structure of the project, must first carry out the operation method and safety education, to mount guard operation. Twelve, on the basis of safety education, organize all employees to conduct a safety knowledge examination every six months. Thirteen, adhere to the leaders at all levels, production technology director safety duty system, each class must have a safety attendant. 2. Civilized construction management system 1. The name tag system shall be implemented on the construction site, and all on-site personnel must wear name tags. Second, the construction site roads and construction sites should be hardened, and the hardened roads and hills should be smooth and free of water. Three, the construction area, all kinds of items according to the requirements of the construction layout partition neatly stacked, and identified according to the ISO 9002 standard. 4. There is no waste mortar and concrete around the mixer, around the material area and on the transportation road surface. In the process of construction, loose sand and gravel and concrete should be cleaned up and utilized in time, so that the site is clear after work and the responsible person is clear. Five, mechanical maintenance in accordance with the provisions of the mechanical management, unified listing logo. Six, the construction process must resolutely implement the responsibility system for cleaning feet after work. Every day, the garbage is cleaned by operators or arranged by special personnel, transported to the designated garbage station for stacking, and sent to the disposal site on schedule to ensure that the site is clean and civilized. Seven, the construction area and living area should be strictly separated, and the office and dormitory should be clean and hygienic. Eight, the construction site inside and outside the gate and the construction area, living area division of health responsibility area, and a clear responsibility. According to the size of the project, assign special personnel to be responsible for the sanitation and maintenance of the site, and keep the whole site clean and tidy. Nine, transport vehicles are not allowed to appear on the site with mud, and are not allowed to throw transportation along the way. Ten, keep the living area clean, no dirt and sewage, garbage piled up, clean up in time. Eleven, the site canteen strictly implement the food hygiene law and food hygiene regulations, and establish a health duty and management system. Twelve, on-site fire control facilities and related signs in accordance with the provisions, well-equipped, in line with the requirements, smoking is strictly prohibited in the construction site. Thirteen, check the civilized construction once a week, linked to economic rewards and punishments. 3. Environmental protection management system. Resolutely implement national and local laws and regulations on environmental protection, and put an end to environmental pollution and public hazards. Second, the construction organization design must consider environmental protection measures, and organize their implementation in the construction work. Third, regularly carry out environmental publicity and education activities, and constantly improve employees' environmental awareness and legal concept. Four, clean up the construction waste, must set up a closed temporary special garbage lane or use container lifting, it is strictly prohibited to volley throwing at will. Construction waste should be removed in time, properly sprinkled with water to reduce dust. Five, the main road hardening on the construction site, covering, maintenance or greening measures shall be taken for the exposed site and concentrated earthwork. Six, the construction site earthwork measures should be taken to prevent dust. Seven, engaged in earthwork, muck and construction waste transportation should adopt closed transport vehicles or take cover measures; Measures should be taken to ensure the cleanliness of vehicles at the entrance and exit of the construction site. 8. The construction site materials, templates and other storage sites must be flat and solid. Fine-grained building materials such as cement that are easy to fly should be sealed or covered. Nine, the concrete mixing place on the construction site should be closed and dustproof. Ten, the construction site set up a closed garbage station, construction waste and domestic waste classified storage and timely removal. Eleven, the construction site machinery and equipment, vehicle exhaust emissions meet the requirements of national environmental protection emission standards. Twelve, it is forbidden to burn all kinds of waste in the dumping site. Thirteen, the construction site is equipped with drainage ditches and sedimentation tanks, and the construction sewage can be discharged into the municipal sewage pipe network or river after precipitation. Fourteen, the construction site to store oil and chemical solvents and other items should be equipped with a special warehouse, the ground to do anti-leakage treatment. Waste oil and chemical solvents should be treated together and not dumped at will. Fifteen, the canteen is equipped with a grease trap, and the septic tank of the toilet should be cleaned in time. Seventeen, canteen, bathroom, shower sewage pipe set filters, and connected to the municipal sewage pipe, to ensure smooth drainage. Eighteen, the construction site should be in accordance with the current national standard "limits and measurement methods of noise at construction site" (GB 12523 12524) to develop noise reduction measures. 4. Fire management system. Establish a fire leading group and a voluntary fire brigade. Second, the fire road is clear, the sign is obvious, and the equipment meets the requirements. Smoking is strictly prohibited, and fire-fighting equipment is not allowed to be used casually. Offenders will be punished according to the fire regulations. Three, inflammable and explosive articles are stored separately, and the procedures for receiving and returning materials are strictly implemented. Four, special projects related certificates, hot work should be used in the fire certificate, someone guarding the fire source and fire extinguisher. Five, the construction organization design should have fire control, safety measures and facilities layout, and in accordance with the relevant provisions, reported to the public security supervision organs for approval or filing. Public security and fire prevention work plan should be made. Six, the construction site to establish a guard and patrol shield system, shield guards should wear duty signs. Implement the voucher difference system. Seven, dressing room, accounting room and dormitory and other prone parts should be managed by designated personnel, and preventive measures should be formulated to prevent theft. Eight, gambling, drinking, spreading obscene articles and fighting are strictly prohibited. Nine, the key parts of the project and key working procedures, to develop safety measures. Ten, electricians, welders engaged in electrical equipment installation and electric, gas welding cutting operations, must have the operation certificate and license. And equipped with fire watchers and fire fighting equipment. Eleven, the use of electrical equipment and inflammable and explosive goods, must appoint someone who's in charge of fire prevention, equipped with fire fighting equipment. Twelve, due to the construction needs of the erection of temporary buildings, should meet the requirements of anti-theft and fire prevention, flammable materials shall not be used. Thirteen, in the project should adhere to the fire safety disclosure system. 14. The storage and storage of building materials should meet the requirements of fire safety, and the warehouse should be built with non-combustible materials. Flammable and explosive articles should be stored in special warehouses, classified and stored separately, kept ventilated, and electricity consumption should comply with fire prevention regulations. Mixing paint and thinner is not allowed in the project or warehouse.
- Previous article:Pupils make garbage classification slogans
- Next article:Travel from Guangyuan, Sichuan to Tibet
- Related articles
- The real living environment of the detention center, the progress experienced, request the truth!
- Restaurants on the tip of the tongue-recommended food certification
- What should I draw in the message of junior middle school class? It should be posted at the door of the class.
- English festival logo design, how to write the design concept
- After buying Lego but don¡¯t know how to play with it?
- Primary school student survey report sample
- Congratulations on your brother's graduation.
- Meituan Waimai launched the "Same Boat Plan". What kind of plan is this?
- Video game expert, please answer. (Questions about xbox)
- Praise Foshan's Modern Poetry