I. Safety in production

(1) safety information

1, proxy signature phenomenon;

2. "Starting from scratch" or "Starting from scratch" is not strictly implemented in safety management, and there are incomplete and false log records.

(2) Scaffolding

3. Scaffolding is not fully paved;

4, not according to the provisions of the drainage ditch;

5. Scaffolding components are not painted with yellow paint;

6. The internal bent is not isolated from the building as required.

(3) "Three Treasures", "Four Ports" and "Frontier Defense"

7, the construction site is not in accordance with the provisions, wear a helmet;

8. Working at heights without wearing a seat belt;

9. There are too many sundries in the safety net;

10, the openings of stairs, elevator wellheads, reserved openings, inspection openings, etc. are not well protected and are not painted with red and white warning colors;

1 1, foundation pit, roof, floor, balcony, unloading platform, etc. They are not well protected, and the fence is not painted with red and white warning colors.

(4) Construction electricity consumption

12, sundries are piled up in front of the electric box;

13, the electric box is not equipped with rain-proof facilities as required.

(5) Lifting machinery and equipment

14, tower crane driver's license is not stored in the construction site;

15, tower crane command or command contact signal is not clear;

16, external elevators, material hoists, and exit doors of various discharging platforms were not closed as required;

17, tower crane, elevator, derrick, hanging basket, material hoist, etc. failed to fix the registration plate on the equipment as required.

(6) Construction machines and tools

18, mixer, ash mixer, etc. The protective shed of the machine prone to dust is not closed or closed loosely;

19, the transmission part of the machine is not equipped with a protective cover;

20, mixer, ash machine, etc. Failing to set up a sedimentation tank in accordance with the regulations.

Second, the civilized construction

(1) Field enclosure

2 1, the enclosure wall is not beautified or brightened;

22. The fence is tilted, damaged and untidy;

23. Stack materials and garbage by the fence.

(2) Building envelope

24, dense mesh safety net Dang Wei height can not meet the specified requirements;

25. The dense mesh safety net is damaged and untidy;

26, dense mesh safety net binding is not firm, Dang Wei is not tight;

27, dense mesh safety net with wire binding or net buckle leakage phenomenon.

(3) Safety warning

28. Failing to use humanized safety warning signs as required;

29. Failing to set safety warning glasses as required;

30. The number of safety warning signs is insufficient and the hanging position is improper.

(4) overlay facilities

3 1, the damage of wallboard and doors and windows is not corrected in time and untidy;

32. Screen doors and screens are not installed in warm seasons;

33. The dormitory is dirty and messy, and there is no unified closed sideboard;

34, the canteen hygiene is poor, the cooking staff did not wear work clothes;

35. The toilet was not flushed in time;

36. Failing to set up and use the shower room as required.

(5) Site capacity and appearance

37, the construction site gate is not set, the use of washing vehicle facilities;

38, in and out of the vehicle washing is not clean, lax coverage pollution road;

39. The hardened road on the construction site is damaged and seriously polluted;

40, building materials piled up in confusion, not set up signs in accordance with the provisions;

4 1, the division of construction work area and living office area is not clear;

42. The construction waste is not removed in time, and the daily life waste is not generated;

43, the construction site drainage, sewage sludge;

44. Throw garbage out of the building;

45, the original soil, backfill soil did not take effective measures for curing and covering;

46, the construction site is not in accordance with the provisions for greening.

(6) site fire prevention

47. Failing to set fire equipment concentration points as required;

48. Flammable places such as living quarters, timber production areas, warehouses, transformer (distribution) rooms and distribution boxes are not equipped with fire-fighting equipment correctly.

(7) Integrated management

49. Failing to carry out night school activities for site workers as required;

50. The safety officer didn't wear the uniform orange uniform in the whole city.