Technical measures for coal mine safety

safety technical measures:

1. Anyone who takes part in this construction must study this measure carefully, so that everyone is familiar with the measures and master them. Only after passing the examination can they work at their posts to ensure that the measures are implemented on site.

2. Disassembly and assembly must be carried out in strict accordance with standards, and support quality and roof dynamic observation should be strengthened.

3, special type of work must hold relevant certificates, otherwise it is forbidden to work.

4. The sound and light signals in all transportation areas are complete and sensitive, and the car blocking facilities and anti-running devices must be solid and reliable.

5, drivers, electricians, road workers, hook workers, monitor, etc. must implement the on-site handover signature system, and the construction can be organized only after all equipment and facilities are safe and reliable.

6. It is forbidden to operate against regulations and command against regulations; It is forbidden to overload the shipment.

7. All construction personnel should study the measures carefully and be familiar with the drawings.

8. There must be a special person to command the construction, and other personnel should obey the command and obey the order.

9, to participate in the construction personnel, strictly abide by the operating rules of each type of work, "coal mine safety regulations" and construction measures, work by the chapter, put an end to illegal phenomenon.

1, staff, mount guard personnel must check before work, eliminate hidden dangers before construction, so that hidden dangers are not excluded and production is not safe.

11. When arranging the work, the personnel on duty in the work area shall explain the safety at the same time. The attendant and the monitor shall be responsible for the safety production on duty, and conduct on-site command and supervision.

12. The shift leader is the first person responsible for the safety production on duty, the inspector is the first person responsible for the engineering quality on duty, and the team leader is the first person responsible for the safety production of the team.

13. In case of an accident at work, follow the principle of "four don't let go", adhere to the analysis of one accident, so as to ensure that minor accidents can't pass the shift and major accidents can't pass the day, distinguish responsibilities, accept lessons and work out measures to prevent similar accidents from happening.

14, all kinds of drivers must be operated by qualified personnel with certificates, and they are not allowed to operate without a license.

15. When walking up and down the mountain, strictly implement the "no one can drive" system, and do not rest and stay in the parking lot, so that the rope is moving.

16. All equipment, tools, and all kinds of lock materials used for underground disassembly and lifting must be accepted on the ground before they can be used in the well. The required spare parts are fully prepared, and small parts and wearing parts should be stored in containers for transportation.

17. The equipment and tools used for lifting, lifting, connecting cars and dragging must be checked in good condition before each use to ensure that they are used in good condition and not overloaded.

18. When lifting and hauling the equipment, the loaded equipment shall not exceed the specified load, and no part of the body is allowed to enter the lower part of the equipment or the chain-inverted triangle area. The lifting point must be firm, otherwise it must be reinforced.

19. When lifting equipment, first confirm the weight of the equipment, and then select a reasonable chain block, with a safety factor of not less than 3. The hoist is single chain and is calculated as 1/2 of the rated bearing capacity of the hoist.

2. When lifting equipment and heavy objects with inverted chain, chain block must be thoroughly inspected. Check whether all parts are complete, flexible and reliable, and ensure that the small shield is complete and intact. If problems are found, handle them in time before use. It is forbidden to hoist equipment and heavy objects with chain-shifting, and it is forbidden to use chain-shifting that cannot be self-locked.

21. The weight of lifting equipment and heavy objects must conform to the nameplate of chain block. Overload lifting is strictly prohibited.

22. When hoisting, it must be carried out by two or more people, one for inspection and one for operation. It is forbidden to hoist

by one person, and it is forbidden to stand under heavy objects. Operators must stand in a safe place to prevent heavy objects from falling and injuring people. Personnel in charge of command and inspection must pay close attention to the safety situation in the hoisting process, and promptly remind the command and operation personnel to stop the operation immediately once they find out the situation, and then carry out hoisting after eliminating the danger.

23. If one of the following problems is found during lifting, it is necessary to stop lifting and put down the lifting equipment for processing.

(1) When lifting, the bracket is deformed, the roof falls off, and the wire rope is broken.

(2) The lifting chain slips and the bracelet is loosened.

(3) The lifting is extremely heavy, and the working sound of lifting chain block is abnormal.

(4) The lifting equipment and heavy objects are unstable, rotating and swinging.

24. In the process of transportation and lifting, the wire rope comes into contact with the equipment, which must be protected to prevent the surface of the equipment from being scratched or the lifting rope from being cut off, resulting in accidents.

25. After lifting heavy objects, it is forbidden to put your hands or body under them, and it is forbidden to stand under them and on the left and right sides. When inclined lane, it is forbidden to stand in the place where heavy objects fall off and slip.

26. Before transporting the equipment, relevant personnel must be organized to inspect the roadway, track, pipelines and cables along the transportation line to ensure the required height and width, and inspect the integrity of the hoist in the inclined lane and the safety facilities in the inclined lane to ensure completeness and reliability.

27. When connecting the car wheel, the pin must be flat with a mouth lock to prevent the pin from escaping.

28. Before driving, the winch driver should check whether the winch is in good condition and fixed, especially the brake, clutch and wire rope. Before the official hoisting, try whether the operation and signal of the winch are normal, check whether there is any rope, and concentrate on the operation during the operation of the winch.

29. For inclined lane transportation, check the safety facilities, track hook head and signal of inclined lane after the hook worker takes up his post, and check the loading and sealing of the lifting vehicle. If the loading and sealing vehicle is not firm, it is not allowed to drive. For the equipment that is not easy to package, take a big block and lift it after sealing the vehicle to ensure the safety of the lifting process.

3. Ensure that the rated traction of the winch is less than the breaking tension of the wire rope. If there is any cutting or squeezing of the wire rope, it must be replaced by a 4T chain or stirrups.

31. When the winch lifts the hook head, each switch and the car stopper must be guarded to prevent the car stopper and the hook head from being damaged.

32. When pushing a cart at the parking lot and lane change, people should avoid the scope of wire rope to prevent skipping rope from hitting people. When loosening the car, there is no excess rope, and the safety facilities of the parking lot should be restored immediately after the car passes the slope change point.

33. When handling faults in inclined lanes, the driver must brake the brake of the winch tightly, lock the car to the track with a chain or rope sleeve from above, and then handle the faults. Personnel are not allowed to work under the car, and anti-skew measures must be taken when working on both sides of the car to prevent injuries.

34. When disposing of the road car, first check the situation and stability of the car, cover up the car, lay the pillar below, and tighten the winch rope. If there is any problem with the car sealing, it must be reloaded. If there is no problem with the car sealing, the road can be started from below. This work must be commanded and supervised by a special person.

35, transportation shall not exceed two cars at a time.

36. During the operation, the winch driver shall not lift the rope by hand or use the pedal rope, listen to the signal accurately, and shall not leave his post without authorization.

37. When loosening the car, there must be no rope between the winch and the loading workshop, and all personnel must get out of the way when the winch starts.

38. The accessories of each piece of equipment must be loaded at the same time, and the sealed car and the wheels must not rub against each other.

equipment trucks with a capacity of over 39 tons and 5 tons, main rope connecting equipment and tail rope connecting wheel, and should have special vehicle sealing tools.

4. The following regulations shall be strictly implemented for the human cart in drift:

(1) Only one cart is allowed to be pushed at a time. It is forbidden to push carts on both sides of harvesters. The spacing between carts in the same direction shall not be less than 3m when the track gradient is less than or equal to 5‰.

(2) Always pay attention to the front when pushing a cart. When starting to cart, stop, turn off the road, find someone or obstacles ahead, push down from a place with a large slope, and approach the exit of the original road, roadway mouth, air door and cavern, the cart pusher must give an alarm in time.

(3) It is forbidden to fly the car

When the slope of the roadway is more than 7‰, it is forbidden to push the cart manually

41. The three gears of the inclined lane are safe and complete, and all personnel in the inclined lane must hide in the safe cavern when pulling the car.

42. The following regulations shall be strictly implemented in the transportation of inclined lanes:

(1) A sports car protection device capable of stopping vehicles with broken ropes and unhooking shall be installed in the inclined lanes (one lane shall be installed according to the slope of 6m—2m).

(2) Install car stoppers in each parking lot to prevent vehicles with ropes from entering the non-running parking lot or section by mistake.

(3) Install a car stopper at the entrance of the upper flat yard, which can control the vehicle to enter the place where the hook is disengaged.

(4) At the upper flat car yard near the slope change point, a car stopper is installed to prevent the unconnected vehicles from sliding into the inclined lane.

(5) At the location where the general plan is greater than 1 train length under the slope change point, a barrier is set to prevent the unconnected vehicles from getting off the sports car.

(6) Signal devices that can give out warning signals when cars are dumped are installed in each parking lot.

43. The hoist, chain and rope sleeve used for lifting heavy objects should be carefully checked before use. Unqualified ones are not allowed to be used, and they are not allowed to be overloaded.

44. When lifting, experienced workers should choose the lifting point and check the roof. When lifting, personnel should avoid under the lifting point, under the lifting beam, under the heavy object and the direction of force rebound. The lifting should be commanded by special personnel, and the changes of the roof should be observed at all times. If any abnormal situation is found, the operation should be stopped immediately and handled. When lifting the equipment, the center of gravity of the object should be found and the lifting should be carried out smoothly.

45. The lifting operation shall not be stopped in the middle, and the personnel shall not leave their posts or act without authorization. When it is necessary to stop, the objects must be dropped and stabilized.

46. Check whether the lifting is firm and reliable, otherwise it is not allowed to lift, understand and master the weight center of gravity of the lifted object and the reliability of the lifting point, and select lifting tools and devices that meet the requirements.

47. Before lifting, check the surrounding conditions. No one can stay within 5 meters except the operator.

48. The dismounting part of the sling should be padded with soft materials to prevent sliding and rigging damage.

49. When transporting equipment, pay attention to the liquid inlet and outlet and the joint surface to prevent damage to the equipment.

5. When two or more people (including two people) carry materials, they should be called properly, and they should be picked up and placed in a consistent way to prevent people from being hurt by poor coordination.

51. When connecting the chain and its materials with the connecting ring, special pins must be used, and it is forbidden to replace them with iron wires or others.

52. When transporting in each parking lot, it is necessary to check whether the car is firmly sealed, and it is forbidden to pull it if the car is not firmly sealed.

53. When using electrical equipment, it is necessary to ensure that all protections are complete, reliable, and free from explosion, reaching the intact standard. The shell of electrical equipment above 36V must have protective grounding, and the grounding resistance is not large, so it is 2Ω.

54. When the winch is contacted with an electric bell, it will stop once, start twice and reverse three times. The long bell is an emergency stop. After the driver hears the bell clearly, he must go back to the point before driving.

55. When pulling the cable, there should be a special person to command, and the actions of picking up, releasing and pulling should be consistent. It is forbidden for anyone to be inside the cable at the corner to prevent injury.

56. It is forbidden to move, dismantle and repair electrical equipment with electricity. When repairing electrical equipment with power failure, the inspection and discharge system shall be strictly implemented.

57, stop sending must have a full-time electrician operation, strictly implement the system of stop sending, switch atresia after power failure, hang a power outage card, specially assigned personnel to guard the power outage switch, and one person must operate and monitor the operation of the high-voltage switch.

58, strengthen the gas monitoring, by full-time tile inspector in the head on a regular basis for the determination and analysis of air temperature, water temperature, air composition, timely grasp the changes, and take corresponding measures.