Joke Collection Website - Public benefit messages - What gas supply charges did Taian cancel? (Tai 'an gas fee)

What gas supply charges did Taian cancel? (Tai 'an gas fee)

A:

1. Cancel the charging items that gas enterprises should recover their costs through gas distribution prices, including pressurization fees, capacity increase fees and other similar items involving municipal pipe network assets outside the red line of building division; Connection fee, opening fee, wiring fee, tangent fee, purging fee, radiation fee and other construction acceptance access link fees related to the connection of municipal pipe network and red line of building division; It involves the expenses from the red line of building division to the maintenance of gas meters and the replacement of expired meters.

2. Cancel the charging items that have nothing to do with the gas engineering installation or have been included in the engineering installation cost within the red line of the building division, including opening fees, account opening fees, interface fees, access fees, network access fees, pigging fees, ventilation fees, ignition fees and other similar items.

other charges

1, it is strictly forbidden for government departments and relevant institutions to charge for compulsory verification of water supply, power supply, gas supply and heating metering devices; The verification fee shall be paid by the entrusting party, but if there is any problem with the verification metering device, the water supply, power supply, gas supply and heating enterprises shall bear the verification fee and replace the qualified metering device for users free of charge.

2. It is forbidden to charge users for water, electricity and heat metering devices.

3, any unit in charge of water supply, power supply, gas supply and heating costs, it is strictly prohibited to charge additional fees to users.

4. If the cost of construction, installation, renovation and maintenance of water supply, power supply and gas supply heating pipe network within the red line of building division has been borne by the government, it shall not be charged to users.

5. The construction and installation costs of water supply, power supply, gas supply, heating pipelines and supporting equipment and facilities within the red line of new commercial housing, affordable housing and other building divisions shall be uniformly included in the housing development and construction costs, and shall not be charged separately to the buyer; After put into use, it can be handed over to water supply, power supply, gas supply and heating enterprises for professional operation and management, and related operation and maintenance costs are included in the operating costs of enterprises.