Joke Collection Website - Public benefit messages - The four major points have been solved, and we will strive to return to work during the Spring Festival.
The four major points have been solved, and we will strive to return to work during the Spring Festival.
The War of Returning to Work during the Spring Festival 1. Busy but not chaotic, do a good job of returning to work after the holiday step by step.
The advantages of price and other aspects have made many people choose the New Year decoration, and at the same time, they have to face a series of things including stopping work before the year and returning to work after the year. Now it has entered the post-holiday resumption period. Faced with a lot of things, decoration owners need to sort out the order before and after and do a good job of returning to work step by step. If you think you are a big boss, you can refer to the steps Bian Xiao gave you to return to work after the holiday.
1. Re-examine the decoration budget and carefully change the design scheme.
Review the decoration budget: before returning to work after the holiday, the owner is advised to review the decoration budget first. Almost all home improvement will eventually lead to budget overruns. In order to reduce the cost overruns, the owners need to carefully review the current family financial situation after the holiday and rationally allocate the funds for later decoration. Some families may be short of money just because of Spring Festival expenses or new family circumstances, and they need to adjust the decoration budget in time to reduce some dispensable construction projects or control the grade of materials.
Shenzhen University's reform design scheme: Many owners of New Year's Eve decoration have new ideas about the decoration during the Spring Festival holiday and want to make some changes in the decoration after the holiday. It should be noted that minor renovation changes may add icing on the cake to the overall effect, but substantial changes in the overall plan will inevitably lead to additions and deletions to the original contract, and renovation costs will also change. However, hastily changing the original mature design may also destroy the overall effect, and may also lead to decoration disputes and unnecessary troubles. Therefore, it is recommended not to make major changes.
The war of returning to work during the Spring Festival II. Fix the problems found after the festival.
To do a good job in preparing for the New Year decoration, the next top priority is to investigate and repair the quality problems of the house decoration project years ago. Some construction problems may be exposed during the new year's renovation shutdown. When you return to work, you should carefully check and accept, record and save the problems in time, and inform the construction party to make improvements. Specifically, which projects should we focus on?
1, look at the water, electricity, heating, doors and windows.
Many years ago, families that had not been installed stopped work before the twentieth day of the twelfth lunar month and resumed work after the fifteenth day of the first lunar month. It took nearly a month. The first thing to do after the Spring Festival is to check whether the water pipes and warm pipes are leaking in advance. If it is a family with central heating, it is necessary to carefully check whether the radiator or floor heating is normal, because there have been cases in which the indoor heating pipes are frozen and cracked during the Spring Festival (especially in new residential areas). Check whether the water supply and drainage is normal; Whether the power supply is normal and whether it is necessary to purchase electricity; Whether the doors and windows are damaged, and whether the window glass is damaged; If there is any problem, contact the property or call the police in time;
2. Look at the structural interface
The so-called construction interface is a part of the decoration work completed years ago, which mainly depends on three points: 1, whether the wall near the north side and the wall outside the room are frozen due to the high indoor humidity, if so, this part of the putty or the newly applied ash layer should be shoveled and redone, otherwise it will be pulverized when it is dry; 2. Look for cracks in the wall. If there is, don't be afraid. As long as measures are taken to repair these cracks, then the construction will continue. Repairing cracks requires more efforts, and we should start from the bottom, and we should not rush for success. Because in addition to the cracks caused by structural deformation, most of the local cracks are caused by the fact that the bottom was not dry or there were few processes during the construction period years ago.
3. Look at the rest of the materials
Materials that have entered the market years ago, especially cement, gypsum powder, quick-adhesion powder and other materials, are easy to agglomerate and solidify when stored in an environment with high air humidity. Families who have done floor heating backfill or ground leveling maintenance before the Spring Festival shutdown should pay special attention to this problem; In addition, cement materials have a shelf life, and the structural strength of expired materials is difficult to guarantee. It is recommended to replace such materials; It's cold this Spring Festival. If the temperature in the storage space or during transportation is below zero, the latex and paint should be disassembled for inspection, and frozen water-soluble rubber and paint should not be used. Starting families should also pay attention to whether there are signs of freezing when collecting such materials.
5. Check the distribution of main materials
Some companies or suppliers will have personnel and post adjustments during the Spring Festival. The materials ordered before must be carefully checked in the process of sending and receiving to see whether the color, color, style, model, specification, size and grade meet the standards set by you before (once a family failed to check carefully for a moment, and pasted the tiles sent by the material supplier with the wrong model and color, even if they were returned later, it would be uncomfortable). If they don't meet the requirements, do their best.
2, agreed to return to work time
Generally speaking, when the Spring Festival is suspended, regular home improvement companies will put a seal on the construction site, which can restrain both the owner and the decoration company from entering the construction site during the suspension period, distinguish responsibilities and avoid disputes. Therefore, after reviewing the financial situation, it is time to ask the project manager to return to work. When returning to work, the owner had better agree the unsealing time with the project manager three or four days in advance. When returning to work, it is best for the project manager, workers and the owner to jointly unseal.
3. Respond to the changes of designers and decoration workers.
1) coping with designer job-hopping: After the Spring Festival, it is a high incidence of designer job-hopping. If you change designers at this time, it will definitely have a great impact on the decoration of the house. How can owners deal with this situation and reduce or avoid its adverse effects? You can refer to the following two schemes.
1. If the designer is replaced by another designer, the new designer will communicate the design scheme with the owner again and confirm the scheme again; Or the new design helps the original designer to do the handover work for a period of time.
Second, continue to let the original designer service bind the designer with the contract, and continue to let the original designer serve. After the designer resigns, the owners who have not completed the service are still obliged to continue the service.
2) Dealing with the replacement of decoration workers: Due to the individual differences of workers, it is best not to change the construction workers casually in the decoration process to keep the connection of decoration projects correct. But inevitably, decoration workers are highly mobile. When returning to work after the holiday, if there are changes in the decoration workers, the owners can actively communicate with the decoration company and resolve them through consultation.
1. For various reasons, some enterprises or construction teams have changed their workers before and after the Spring Festival, or not a group of people were sent after the inspection determined years ago; If this happens, try to ask the construction party to use the original (or scheduled) personnel;
Second, the construction requirements described before and the agreed construction details (such as the sticking method of ceramic tiles, the position of flower pieces and waist lines, lamp positions, specific space, thickness, height, details and effects, etc.). Furniture to be reserved) should be re-explained and confirmed. In order to avoid omissions, it is best to write down the arrangement in a notebook, and reiterate the specific requirements in front of the person in charge of the company or the person in charge of construction, who will explain it to the newcomers.
Three, the new construction personnel, may need to have a familiar process, if it is found through observation that the new workers master the technology is not ideal, they should contact the person in charge as soon as possible for replacement.
4. Make inventory, inspection and filling of decorative materials.
Inventory of decoration materials: before the holiday, the construction party and the owner will generally check and accept the site and register the items and decoration materials on the site. Therefore, the first thing to do after the festival is to do a good job in the inventory of decoration materials. Generally, the items stored in the construction site include materials provided by the decoration company, materials purchased by the owner, and workers' working tools. Decoration companies usually stack these three materials separately, and owners can check them according to the remarks column of the "Cross-year Project Closing Record Form" filled in years ago.
Usability inspection of decoration materials: The materials in front of the factory, especially cement, gypsum powder, quick-adhesion powder and other materials, are easy to agglomerate and solidify when stored in an environment with high air humidity; In addition, cement materials have a shelf life, and the structural strength of expired materials is difficult to guarantee. It is recommended to replace such materials; In addition, latex and paint should be disassembled for inspection, and frozen water-soluble rubber and paint should not be used.
Buy the missing decoration materials in advance: when returning to work after the Spring Festival, the owner should check whether there are any missing materials and damp conditions on the site to avoid delaying the construction period due to insufficient materials. When the renovation is resumed, all kinds of materials and building materials should enter the site in time, and some materials that need to be installed by material suppliers should be booked in time and delivered at a reasonable time.
The war of returning to work during the Spring Festival III. Distinguish between different work progress recovery processes.
Under normal circumstances, the process of New Year's Eve decoration can be divided into design without starting, carpentry ending, bricklayer ending and finishing. Different working procedures have different points of attention when returning to work. Let's take a look at the progress of home improvement projects in different processes and how to return to work.
Determine the progress of the project according to the records.
Before returning to work after the holiday, we must first determine the progress of the project, which projects have been completed and which projects have not been done. This mainly needs to be determined according to the project schedule. In the progress column of the master record table, the words "start", "foundation", "finish" and "completion" are marked behind each type of work, indicating the progress of the project. The owner should confirm the progress of the project according to the information provided years ago and the introduction of the project manager, and familiarize himself with some unfinished projects again.
1, design projects that have not started to resume work.
In fact, the optional way of New Year decoration is still very flexible. In order to attract customers, many decoration companies have launched projects that sign contracts before the year, design after the year and start construction after the year, which have been welcomed by many owners. In this way, the decoration time will transition from winter to spring, so at this time, it is necessary to pay attention to how to carry out spring decoration.
Key points of returning to work: reasonably allocate working procedures to avoid the influence of spring humidity.
The weather is wet in spring, especially in the south. In home improvement projects, carpentry and painting parts are most vulnerable to wet weather. But wet weather has little effect on other processes, such as water and electricity, masons and so on. Therefore, owners who haven't started designing can arrange bricklaying and water and electricity arrangements in March, and then blow putty, paint walls and do carpentry in April when the weather gets warmer. The painting process is basically in the final stage of decoration, as long as you avoid rainy days.
2. Stop work and resume work in woodworking projects
If the carpentry work was finished years ago, the key point of returning to work after the holiday is to check whether the carpentry work has changed. If the deformation and cracking problems are found, they need to be repaired in time. If there is no problem, it can be re-polished and then painted with topcoat; If the woodworking project is not finished, it is necessary to ensure the connection of woodworking technology before and after the Spring Festival and ensure the quality of decoration.
3, bricklayer's project shutdown to return to work.
Masonry is generally carried out at the same time. Before the Spring Festival, it is generally recommended to end bricklayers. If the bricklayer can't finish it, make sure that all the walls or floors of a single room are pasted. Otherwise, the work will be stopped after the Spring Festival, the temperature and humidity will change, and the tiles may be empty.
Prevent bricks from bulging and loosening: For rooms that are not bricked, the wall humidity changes after a period of work stoppage, so sprinkle some water on the wall of the blank room before returning to work, otherwise there will be too little water on the wall, and the cement water will evaporate after bricklaying, and the bricks will easily bulge and loosen, and the paste will not be firm enough.
4. Resume work in the final stage of shutdown project
If carpenters, oilers and bricklayers are all finished, basically all that remains is to lay the floor, install sanitary ware and hardware. At this time, the importance of the project is not low, and in the end, it cannot be taken lightly.
Note: Key points of construction in finishing stage of decoration.
1) Install floor expansion joints, and the decoration works will change with the weather in the future. When laying the wooden floor in spring, be sure to leave enough expansion joints to prevent bulging due to humidity.
2) Hardware installation For the installation of lamps and switch socket panels, paint or wallpaper should be painted on the wall before the completion of the project to prevent the construction personnel from accidentally breaking lamps or scratching the panels.
3) Sanitary ware should be installed before the acceptance of the project and before most of the construction personnel leave, so as to ensure the hygiene of sanitary ware.
4) New houses need "detoxification": When the house decoration has basically come to an end, we should pay attention to the accumulation of a large number of harmful substances in the house decoration. In order to stay healthy, you can ask a special air testing department. After the decoration, we should put more green plants and pay attention to ventilation, once a day in the morning and afternoon, so as to deodorize quickly.
"Returning to work during the Spring Festival" Fourth, remember the precautions for spring decoration in seasonal decoration.
The climate in spring is moderate in temperature and humidity, the performance structure of various decoration materials is relatively stable, and the designers and decoration workers who have just returned from vacation are also full of energy, so they are considered as a good opportunity for home decoration. After the Spring Festival holiday, the breath of spring is getting stronger and stronger, and the climate of this season needs to be taken into account when returning to work after the holiday.
1, spring construction should be moistureproof.
In spring construction, the most important thing is moistureproof. If the moisture-proof work is not handled well, the problems such as wood deformation, floor warping and wall cracking will easily occur when the autumn wind blows. This requires special selection of materials.
2. Repair hidden dangers in wood.
The hidden dangers of decoration in wet weather in spring are mainly the bulging of plates and the deformation of wooden furniture. These are directly related to the expansion of wood. Therefore, the moisture-proof work of decoration materials is particularly important. Don't enter the decoration materials in rainy days.
Once the wet materials are transported to the construction environment and not fully air-dried, they will be severely cracked and deformed within 3 months after decoration. All kinds of materials should enter the market in an orderly manner, and don't rush to move all the decoration materials into the new house.
3, should pay attention to prevent the rain when decorating.
In the decoration, many families have to knock off the original bathroom walls and tiles and put on new tiles. In this way, the bathroom walls and floors need to be waterproof again. For example, the bathroom floor should be leveled before waterproof treatment, which can avoid the leakage of waterproof paint due to uneven thickness; Joints should be painted in place; Wall treatment is also very important. General waterproof treatment, the wall should be waterproof coating with a height of about 30 cm. According to the requirements of national standards, the thickness of waterproof coating on the ground should be ≥ 1.5mm to prevent water from infiltrating into the wall. Waterproof experiments must be done. If there is a quality problem in the waterproof project, the water stain will dry up to the next room, but leak downstairs, causing serious losses to your home and neighbors.
The climate between north and south is different.
Matters needing attention in spring decoration are very different between the north and the south, so the weather must be taken into account when the decoration is resumed after the holiday. Among them, the south is relatively humid in spring, and the north is windy and dusty. Therefore, when restoring decoration or spring decoration, we should pay attention to the differences between the north and the south. Generally speaking, there are many wet days in the south in spring, so the floor and other pavements should pay attention to moisture prevention; In the north, painting should pay attention to the influence of sandstorm.
5. Don't ignore the details in spring decoration.
1 except), when choosing materials, you must choose elastic latex paint and adhesive, and add a belt to avoid autumn wind, which will lose some water on the wall. At this time, the advantages of the coating with good elasticity and strong deformation resistance can be fully reflected, while the coating wall with relatively weak elasticity will crack more or less.
2) During coating construction, the base moistureproof primer can't be saved. Pay attention to ventilation after painting, and strive for maximum drying.
3) Pay attention to electricity safety, don't pull the wires randomly, and there should be a protective tube on the power cord; Smoking and open flames are not allowed on site; Flammable materials such as paint and thinner should be stored in a cool, ventilated and safe place far away from the fire source; Equipped with fire fighting equipment when necessary.
- Related articles
- How rubbish is Shanghai Airlines?
- How to change the mobile phone number of personal SMS notification in China Bank Mobile Banking?
- Where can I download cell phone chord ringtones?
- The money of rural credit cooperatives was inexplicably deducted 20 yuan, saying it was a short message fee. What happened?
- Congratulations on your colleague's promotion.
- Is it okay to come to Xiangcheng from Dongshan now?
- What's the message of clear powder?
- Can I use zelle for the Agricultural Bank of China card?
- Teacher’s Day greetings to Taofa teacher
- Poems and famous sentences about the Spring Festival