Joke Collection Website - News headlines - Summary of land reclamation supervision work
Summary of land reclamation supervision work
Time flies, and a period of work has ended. Looking back on the work during this period, we have gained a lot. We need to review and sort out, and write a summary of the work. How should we write a work summary? The following is a summary of the land reclamation supervision work that I have carefully compiled. Everyone is welcome to learn from it and refer to it. I hope it will be helpful to everyone. Summary of land reclamation supervision work 1
In a blink of an eye, it has been a month since I came to the company. As a new employee, I am very grateful to the company for providing me with a platform that allows me to continue to learn at work and constantly improve myself. Make progress and slowly improve your own quality and talents. Here I would like to express my most sincere gratitude to the company's leaders and colleagues for their help in my work.
In this month, as a new non-professional, I mainly studied the relevant land reclamation regulations and further understood some relevant knowledge of land reclamation, including why reclamation is necessary, What needs to be reclaimed, the purpose and significance of reclamation, and the reasons and purpose of preparing a reclamation plan, as well as the content of the reclamation plan. The second step is to practice the mapping software. In the process of drawing, I learned about geology and hydrology, but I have not yet mastered it. In the next time, I should strengthen the study of this knowledge. The third step is to study on-site in the field and initially master it. Understand the process of land reclamation field investigation and some matters needing attention, and understand the general operation method.
There were also some problems during this period, mainly in the following aspects:
First, due to lack of experience and less relevant professional knowledge at work, some problems were not treated properly. The solutions are too simplistic, the working methods are too simple, and the problems are sometimes viewed in a one-sided way, covering the whole situation with just a few points.
Second, the comprehensive ability of inductive analysis is poor. It is necessary to further strengthen the planning, systematicness and scientific nature of the study of reclamation-related knowledge, and improve the ability of comprehensive analysis and problem-solving.
Third, because I am not a professional, I have no idea about the meaning of some professional terms and symbols when I look at the relevant drawings, and I can’t figure out what they mean; I should strengthen my understanding in this regard. ability.
Although I have studied hard since joining the company, there are still many things that need to be continuously improved and perfected, such as the theoretical level and work ability that need to be further improved, and I am not familiar enough with the new job position, etc. I am determined to work hard to improve and solve the problems in my future work, so that I can do my job better and serve the company.
In view of the above deficiencies and problems, I plan to do the following points to make up for the deficiencies in my work in the future:
1. Make a good work plan and continue to strengthen the management of all aspects of the company. Study various work contents to achieve a comprehensive and in-depth understanding of relevant knowledge.
2. Use practice and learning to improve your work ability in all aspects. While focusing on learning, pay close attention to practice, use the knowledge you have learned in practice, and use knowledge to guide practice to improve your work ability and work level in an all-round way.
3. Do your job well in a down-to-earth manner.
Do your job well with a more positive work attitude and more enthusiastic work style.
In short, mentality determines state, and state determines success or failure! You must have a sense of responsibility for the company, love for the society, perseverance in your work, enthusiasm for your colleagues, and confidence in yourself! Be the best version of yourself! The above is a summary of my work this month. Please criticize and correct me. Summary of land reclamation supervision work 2
First of all, on behalf of all the employees of Rongguan Mining, I would like to thank all the leaders for coming to our mine to inspect and guide the work, and I would like to express my warmest welcome to you! Next, I will report to the leaders on the environmental protection restoration and land reclamation situation of Rongguan Mining in recent years. If there is any inappropriateness, I would like to ask the leaders to criticize and correct it.
Since the establishment of the mine, Rongguan Mining has always regarded environmental protection and restoration as its core tasks, and has strictly followed the "three simultaneous" standards for environmental protection in mine production and construction. No major environmental pollution incidents have occurred. Geological disaster events.
Our mine actively raises special funds and is committed to the restoration and management of the mining area environment. It strictly follows the "Environmental Protection and Restoration and Governance Plan" and the "Land Reclamation Plan" to carry out comprehensive management and protection of the mining area environment. The specific work is as follows:
1. In XX, the damaged grassland on the west side of the tailings pond was reclaimed, with a reclamation area of ??12,400 square meters, covering soil of 6,200 cubic meters, and a total investment of more than 300,000 yuan.
2. In XX, 2.4 million yuan was invested in hardening kilometers of roads in the mine (steel-concrete pavement).
3. In XX, a 1,260-meter slag retaining wall was built on the waste rock and slag heads, with an investment of 10,000 yuan.
4. In XX, the damaged grassland on the south side of the oil depot was sloped. , and cover it with soil, restore 1,200 square meters of vegetation, cover 600 cubic meters of soil, and invest more than 50,000 yuan.
5. In XX-XX, the transportation road maintenance from the mining area to Erengaobi requires an annual investment of more than 600,000 yuan, with a total investment of more than 1.8 million yuan.
6. The high-level pool in XX The waste gravel head on the lower side is slope protected with hollow cement bricks, covering an area of ??2,200 square meters and covering 1,100 cubic meters of soil, with a total investment of 230,000 yuan.
7. In XX, hollow cement bricks were used for slope protection at Laohukou of the 1500 dressing plant, covering an area of ??800 square meters, covering 400 cubic meters of soil, and an investment of 90,000 yuan; the road slope on the east side of the oil depot was protected with hollow cement bricks. , covering an area of ??1,500 square meters, covering 750 cubic meters of soil, and an investment of 180,000 yuan.
8. In XX, an 800-meter slag retaining wall was built on the slope of the ore transport road in the mine, with an investment of 80,000 yuan. 9. In XX, the subsidence area was fenced for 2,800 meters and 20 warning signs were installed, with a total investment of 120,000 yuan.
10. In XX, the tailings reservoir was fenced for 1,200 meters and warning signs were installed. 15 pieces, with a total investment of 10,000 yuan
11. In XX-XX, the dry beach of the tailings pond was treated by using grass bedding and spraying water to escape dust, which reduced the pollution caused by the dust from the tailings sand. The annual cost of using pasture is 200,000 yuan. Total investment in 2 years is 400,000 yuan.
12. In XX, 50 speed bumps were installed on the road from the mining area to Erengaobi, with a total investment of 120,000 yuan, reducing road dust pollution on the grassland.
13. Greening of the mining area, 200,000 seabuckthorn plants were planted from XX to XX***, with an investment of 300,000 yuan. Plant 800 poplar trees with an investment of 80,000 yuan; plant 800 lilac plants with an investment of 40,000 yuan; plant 200 golden-leaf elm trees with an investment of 40,000 yuan; plant 500 pine trees with an investment of 200,000 yuan; plant more than 20,000 various flowers with an investment of 40,000 yuan. More than 30,000 yuan. A total of 690,000 yuan.
In XX, the damaged grassland on the south side of the guest house was covered with soil, covering an area of ??150 square meters, covering 75 cubic meters of soil, and investing 10,000 yuan.
15. In XX, the open-pit stopes were sloped, leveled and covered with soil. The slope cutting amount is about 8000 m3, the leveling is about XX m3, and the covering soil is 12210 m3. The total investment is 450,000 yuan.
In 2016, the abandoned prospecting shaft dormitories in the northern part of the mining area were demolished, construction waste was removed to the open pit, and the site was covered with soil after cleaning. About 800 m3 of masonry buildings will be demolished, about 800 m3 of construction waste will be cleared, and about 600 m3 of covering soil will be dismantled. The total investment is 120,000 yuan.
In 17. XX, the damaged grassland on both sides of the road to the west of the gate guard was leveled and covered with soil, with a total investment of 10,000 yuan.
Although our mine has increased efforts in geological environmental protection and management in recent years, there are still problems of one kind or another. I hope that all leaders will correct the shortcomings of our mine’s work. Our mine will strictly follow According to the instructions of superior leaders and the requirements of the geological environment protection and restoration management plan, comprehensive management of the mining area environment will be carried out, and capital investment will be increased to ensure that the phased management work is completed according to schedule.
Summary of Land Reclamation Supervision Work 3
According to the State Bureau's "Notice on Forwarding the Provincial Office of Land and Resources' Notice on Forwarding the Notice of the General Office of the Ministry of Land and Resources on Carrying out Special Inspections on the Implementation of Land Reclamation Regulations" In accordance with the spirit of the document and the main content of the inspection, the self-inspection of the implementation of the "Land Reclamation Regulations" carried out by our bureau is as follows:
1. Implementation of the "Regulations"
The "Land Reclamation Regulations" establish a series of important systems to further regulate land reclamation activities under the new situation, and are the deepening and embodiment of the cultivated land protection system and the system of economical and intensive land use. Our bureau attaches great importance to the implementation of the "Land Reclamation Regulations" and regards land reclamation as an important part and starting point of cultivated land protection work.
(1) Attach great importance, study in depth, publicize widely, and implement the "Land Reclamation Regulations"
First, study by convening staff meetings, requiring all cadres and employees to The spirit of the "Land Reclamation Regulations" must be truly understood. The second is to carry out extensive publicity and implementation of the "Land Reclamation Regulations", and carry out various forms of publicity of land laws and regulations for Chengji in conjunction with daily work such as "Earth Day", "Land Day", annual mine inspections and law enforcement supervision, such as the production of special topics Publicity leaflets, posting slogans, holding work symposiums, etc., to enhance the general public's understanding of the "Land Reclamation Regulations" and further promote the organization and implementation of the regulations; thirdly, strive for the support and coordination of relevant departments , Build a joint responsibility mechanism for land reclamation. The fourth is to implement the "Land Reclamation Regulations" through study and perform their functions and responsibilities well. The "Land Reclamation Regulations" set forth strict requirements for the land reclamation supervision responsibilities of county-level land and resources departments, implement full supervision of all types of land reclamation, urge land reclamation obligors to prepare and submit a "Land Reclamation Plan" as soon as possible, and carry out Strict requirements are put forward for the preliminary review and filing of the project's land reclamation plan, and there are clear provisions on the implementation and supervision of the reclamation plan, and on urging those responsible for land reclamation to consciously perform reclamation obligations and implement reclamation responsibilities. The "Land Reclamation Plan" Since the implementation of the Reclamation Regulations, our bureau has strictly followed various regulations and continuously promoted the in-depth development of land reclamation work in our county. The fifth is to continuously improve the construction of our bureau’s land and mineral development center, continuously improve staffing, training, office facilities, etc., strengthen the responsibilities of land development and reclamation survey, land and mineral development consultation, surveying and mapping, and study and supervise the work process. , effectively strengthen leadership and perform the work responsibilities of land development, reclamation and consolidation.
(2) The results achieved by the implementation of the "Land Reclamation Regulations"
Since the implementation of the "Land Reclamation Regulations", the land reclamation work in our county has received great attention from the county government and society. With strong support, certain results have been achieved;
First, the work responsibilities have been clarified and various work systems have been established and improved.
The second is to find out more than 1,000 acres of damaged land left over from the history of our county (Qingshan, Xindian, Downstairs) and more than 500 acres of natural disaster-damaged land (sweet potatoes have been reclaimed).
Third, the county has completed the preliminary review and filing of the "Land Reclamation Plans" of more than 30 mining enterprises in our county, and urged and guided land reclamation obligors to fulfill their land reclamation obligations and formulate annual reclamation plans.
2. Construction of supporting regulations and internal management systems
In order to better implement the "Land Reclamation Regulations" and integrate with the actual work of our bureau, the "Puan County "Land Reclamation Plan Compilation and Review System", "Pu'an County Land Reclamation Supervision and Inspection System", "Pu'an County Land Reclamation Annual Reporting System", "Pu'an County Land Reclamation Cost Guarantee System", etc. Strengthen land remediation planning in internal management, promptly launch investigations into the current status and reclamation potential of damaged land in the region, find out the situation, establish a land reclamation monitoring system, and timely grasp the damage to land resources and the effects of land reclamation, etc. situation, continue to explore effective systems for land reclamation work, and gradually standardize the management of land reclamation work.
3. Implementation of the system
Taking the "Land Reclamation Regulations" as an important basis, combined with the actual situation of our county, establishing the concept of serving society and serving enterprises, and taking the initiative according to functions, Do a good job in the supervision and management of land reclamation by mining enterprises within the jurisdiction. For mining enterprises that have approved and filed land reclamation plans, supervise the specific implementation of land reclamation work, establish an annual reporting system for land reclamation work, and conscientiously implement land reclamation work. Supervise and manage the collection, deposit, withdrawal, and use of deposits, ensure the connection between all aspects of land reclamation work, ensure that land reclamation tasks and obligations are implemented, and ensure that local economic and social development does not cause damage to land resources.
Strengthen the supervision and management of the implementation of the land reclamation plan, effectively fulfill the supervision responsibilities for the implementation of the land reclamation plan, link the land reclamation obligations with the annual inspection of mining rights, and those who fail to fulfill their obligations will not be subject to annual inspections to ensure that land reclamation Comprehensive implementation of reclamation obligations.
In addition, our bureau also provides land reclamation suggestions to higher-level approval authority departments in the work processes such as mining rights approval and construction land review, and uses land reclamation work as a threshold in the review work to ensure Land reclamation work is developing healthily and steadily.
4. Existing problems and suggestions
1. Because some production and construction units or individuals that caused land damage did not implement land reclamation funds and did not conscientiously perform their land reclamation obligations, resulting in A large amount of newly damaged land cannot be reclaimed in time or the reclaimed land cannot meet the prescribed quality requirements. Therefore, it is necessary to further strengthen and implement regulatory measures and establish an effective regulatory restriction mechanism, fund guarantee mechanism and strict accountability mechanism.
2. A considerable amount of land damaged by history and land damaged by natural disasters has not yet been reclaimed in a timely manner. It is necessary to clarify the entities and funding channels for their reclamation, and standardize their reclamation management. A large part of the existing unreclaimed damaged land belongs to historical damaged land without reclamation obligor and land damaged by natural disasters. Since the existing legislation does not provide for the responsible entities, funding channels, management methods, etc. for the reclamation of this part of the land, a large amount of land has not been reclaimed in a timely manner.
3. Land reclamation requires huge capital investment, and land reclamation incentive measures need to be further improved. It is necessary to further improve corresponding incentive measures to encourage land reclamation obligors to proactively reclaim land, and to attract local governments and all social parties to actively participate in the reclamation of land damaged by history and land damaged by natural disasters.
- Related articles
- Kneel down and beg the great god to translate the slogan, thank you!
- Understanding of China Tea Culture
- Thank you very much for "Workshop 5S Management System".
- Creative pig trotters advertising slogans
- Questions and Answers of the 221 National Party History Knowledge Competition for Primary and Secondary School Students
- Girlfriend's wedding copy, warm literature and art.
- What’s crazy about Valentine’s Day^^?
- Certificate cake certificate can I eat it?
- 3.12 Tree planting activity planning plan
- What is the legal aid telephone number in Nanjing?