Detailed rules for safety supervision of pile foundation?

Detailed Rules for Safety Supervision of Pile Foundation is an important document to guide the safe construction of pile foundation. Generally speaking, what are the contents of the Detailed Rules for Pile Foundation Safety Supervision? The following is the main content introduction of the detailed rules for pile foundation safety supervision brought by Zhong Da Consulting Company for your reference.

Detailed rules for safety supervision of pile foundation:

1. The construction site shall be leveled and compacted, and drainage measures shall be taken. Check whether there are high-voltage lines in the operation area. The operation area should be clearly marked or fenced, and non-working personnel are not allowed to enter.

2, pile machinery comes into play, must provide mechanical certificate, annual inspection report and inspection certificate to the supervision; Machinery must be equipped with safety protection devices, and safety facilities can only be used after inspection.

3. Conduct targeted safety technical disclosure and safety operation education for construction personnel.

4. Wear safety helmet when entering the construction site and fasten your seat belt on the tower.

5, security officer, welder, electrician, crane driver, crane command and other special types of work related certificates; Put an end to undocumented posts.

6. Before starting work, the project manager shall organize relevant personnel to carry out safety inspection, and start work only after passing the inspection.

7. The operation area should be clearly fenced, and eye-catching safety propaganda slogans and signs should be hung.

8, cable overhead layout, all kinds of electrical control must have a leakage protection device.

9, piling, carefully check the use of machines and tools, key parts of the inspection, after the trial operation, in line with the requirements of safe construction, can be put into normal use, the formal construction of equipment generally implement a weekly inspection system.

10. After the pile driver is turned on, the operator must monitor the pile hammer 5 meters away from the center of the pile hammer.

1 1. It is forbidden to hang piles, swing or walk with a hammer at the same time. When the pile driver hangs the pile and hammer, the operator shall not leave his post.

12, the distance of hanging piles by pile frame shall not be more than 5m, so as to avoid eccentric hanging piles. In special circumstances, reliable measures must be taken.

13. In case of thunderstorm and gale with magnitude 6 or above, the construction shall be suspended, and effective measures shall be taken to strengthen the windproof capacity of the pile frame.

14. In the two-shift construction, a shift-over system should be established, and the shift-over records should be kept for each post when handing over the two-shift construction, and the situation should be handed over to the next shift in time and accurately.

15, when lifting, there is no obvious eccentricity, and no one is allowed to stand in front of the guide rod.

Safety supervision of deep foundation pit

1, safety preparation stage before construction:

1) Before the survey, the current situation of buildings, structures, roads and underground pipelines near the deep pit and the construction of adjacent construction projects in the same period should be investigated, and the survey data should be provided to the design, construction, monitoring and supervision units.

2) The scope of preliminary investigation starts from the edge of the foundation pit, and the scope standard is 3 times of the excavation depth of the foundation pit.

3) Design, construction, supervision, municipal administration, public power supply, communication, monitoring and other related units. Introduce the design, construction scheme and possible impact of construction, solicit opinions from relevant units, and further inspect, monitor, take photos or video the adjacent buildings, structures, roads and underground pipelines that may be affected. Set up signs and make records.

4) Review the construction scheme, and the construction enterprise shall organize an expert group of not less than 5 people to demonstrate and review the prepared safety special construction scheme.

5) Select the survey, design, construction, supervision and monitoring units of deep foundation pit engineering according to the contract management regulations of this Municipality, and do not split the contracted projects.

2. Safety management in the construction stage:

1) During the construction of deep foundation pit, the construction organization design or construction scheme should be worked out according to the design documents and requirements and in combination with the actual situation of the project. In addition to the conventional provisions, the construction organization design or construction plan should also include environmental protection measures, monitoring measures and emergency rescue measures.

2) The construction organization design or construction scheme shall be examined and approved according to the prescribed procedures. The approved construction organization design and construction scheme shall not be changed at will. If it is really necessary to modify it, it shall be approved by the original approval unit and approved by the original design unit.

3) The construction unit of deep foundation pit engineering should strengthen the quality and safety management and technical management procedures of the construction site, carry out the construction according to the approved construction organization design, and monitor the surrounding environment of the construction site. The construction site should be designed according to the deep foundation pit, and the construction site should be equipped with emergency rescue equipment and personnel.

4) After foundation pit excavation, fences should be set around the foundation pit for safety protection. Earthwork should not be piled up around the foundation pit, and it should be cleared away in time. Construction safety passages and drainage measures should be laid around the foundation pit.

5) During foundation pit operation, the construction unit shall determine the climbing facilities and special passages in the construction scheme, and the workers shall not climb the cave walls.

6) During foundation pit operation, the construction unit shall designate a special person to command and supervise. When displacement, cracking and leakage occur, the work should be stopped immediately and the workers should be evacuated from the job site. The operation can only be started after the danger is eliminated.

7) For deep foundation pits, especially soil slopes and bedding slopes with poor stability, the induced factors such as rainy season construction should be fully considered in the construction scheme, and pre-plan measures should be put forward.

8) After the foundation pit excavation is completed, the construction unit shall carry out underground structure construction in time, and it is forbidden to expose the foundation pit for a long time.