Joke Collection Website - News headlines - How to write a typhoon prevention report
How to write a typhoon prevention report
Fully deploy typhoon prevention work
According to the work requirements of the provincial and municipal defense headquarters on defending against Typhoon No.9 "Meihua", since August 6, the District Party Working Committee and Management Committee have attached great importance to it and held emergency meetings one after another to arrange the deployment of preventive work. The relevant work is reported as follows:
One is to raise awareness and strengthen leadership.
At the district and office levels, the first-in-command responsibility system is fully implemented, and the main leaders are commanded by the front, making overall arrangements and scientific scheduling, quickly launching relevant plans, and fully entering the typhoon emergency state. From August 6th, Zhang Lingfeng, member of the District Party Working Committee and deputy director of the Management Committee, personally took up his post and took command. All departments and offices also implement a 24-hour duty system for leaders to timely, comprehensively and accurately grasp the information on typhoon dynamics and defense work, and ensure that the information is uploaded and issued in a timely and accurate manner. The office of district defense refers to further enrich its strength, do a good job of supervision and notification, and the typhoon defense work is solid and orderly.
The second is to strengthen measures and highlight key points.
According to the general requirements of provincial and municipal defense, the development zone has done the following work in strict accordance with the working goal of "not killing people and reducing losses".
(A) inland river flood control
The flood control plan was enriched and revised, and the drainage and irrigation systems such as Mabaogou, Waliang main ditch and Zaohuligou in the jurisdiction were dredged, and the bamboo ditch connecting the main ditch was opened. Carry out 24-hour duty patrol, and clear the blockage in time when it is found. There are special persons in charge of dam projects such as Sangan Sluice and Shengli River Rubber Dam, which ensure the timely opening and closing of the river and smooth drainage. At the same time, check all bridges in the area, set up tires for the 18 bridge, block dangerous bridges, and set up no-go signs to prevent vehicles and pedestrians from passing.
(2) Road traffic
Before the arrival of the strong typhoon, all rural roads, bridges and other projects under construction stopped, all tower cranes, supports, billboards, light poles, poles and other aerial work facilities were reinforced or dismantled, all materials and equipment in low-lying areas were protected and transferred, and construction personnel were properly placed to ensure safety; Strengthen the water traffic safety precautions in the jurisdiction, notify China Shipping Tourism and other related transport (tourism) ships, construction ships and personnel on board to take shelter from the wind and go ashore according to the requirements of the port and shipping departments, and pay attention to the anchoring and reinforcement of the facilities on board; Strengthen the safety management of road transport vehicles. Relevant passenger lines and vehicles should be adjusted or suspended in time to avoid typhoon-affected areas. Arrange and prepare 2 buses and 2 trucks (subject to the dispatch of the district flood control headquarters, and increase vehicles when necessary) for transporting emergency materials and emergency rescue and disaster relief; Strengthen highway inspections, effectively implement anti-destruction measures, take emergency measures such as temporary site cleaning, drainage and dredging, covering waterproof canvas and temporary reinforcement, strengthen anti-destruction management of water damage points, and prevent secondary damage.
(3) Urban drainage
1, six drainage and water blocking checkpoints were dredged by laying huanghe road No.4 municipal rainwater pipeline, opening the open drainage ditch on the north side of the west end of huanghe road 1 and cleaning the water blocking obstacles in Ma Bao ditch. Through bidding, three municipal pipeline dredging teams were organized to dredge all municipal rainwater pipelines with serious siltation on the main road in the built-up area of the development zone, and to clean the manhole, rainwater grate and rainwater branch pipes. Up to now, more than 32,000 meters of municipal rainwater pipes have been dredged, more than 365,438 rainwater inspection wells and more than 6,200 rainwater collection wells have been cleared, and the drainage capacity of the pipe network has been significantly enhanced. 2. A mobile rescue team for urban flood control with more than 100 people was set up to ensure smooth communication for 24 hours and ensure that "it can be pulled, topped and won". Specific implementation: there are 1 10 team members, 2 1 pumps, 13 pickaxes, 24 shovels, 900 woven bags, 3 excavators, 10 personnel, and 8 pumps have been deployed in key safety areas to ensure that there is no large-scale water accumulation in the urban area. 3. Implement the duty system: all staff shall maintain a 24-hour duty system in flood season to ensure the smooth flow of information for 24 hours.
(4) Schools and sanatoriums
On August 6th, the education system of the whole region specially issued the Emergency Notice on Seriously Doing a Good Job in the Defense of No.9 Super Typhoon Meihua this year. On August 7, Yin Meiying, deputy secretary of the Party Working Committee and deputy director of the Management Committee, led a team to inspect all schools in the area, requiring all schools to conduct comprehensive overhaul and maintenance of school buildings, courtyard walls and circuits, and to conduct a comprehensive inspection of school publicity windows, slogans, billboards, sculptures and flagpoles. In order to be foolproof, the district education bureau quickly issued a notice to suspend classes in kindergartens and postpone teacher training, putting personal safety first.
The nursing homes in various offices conducted a comprehensive investigation of dangerous old houses. All units should ensure that 3 sets of temporary resettlement houses are prepared, each community prepares 10 sets of temporary resettlement houses, and the office prepares 20 sets of temporary resettlement houses. Ensure timely response to possible dangers at any time.
(5) Construction site
Supervise the construction team to strengthen the inspection and reinforcement of tower cranes, supports, foundation pits, protective nets and other facilities and equipment that endanger personal safety in construction projects within the jurisdiction. Construction is prohibited during typhoons, and construction personnel are prohibited from entering and leaving the construction site during typhoons. Evacuate the construction workers living in dangerous sheds to ensure that the construction site is foolproof. Conduct a comprehensive investigation of large advertising billboards used in the area, and inform the implementation door by door. The reinforcement of the reinforcement and the demolition of the demolition ensure safety.
Three, a clear division of labor, serious and responsible
District defense refers to the special notice, requiring all levels and departments to implement work measures according to the division of responsibilities of the emergency plan for flood control and typhoon prevention to ensure that all work is implemented. Ordered all member units to cooperate closely, and Qi Xin made concerted efforts to ensure the effective, orderly and powerful development of wind and typhoon prevention. Those who are lax in their work and ineffective in their defense work, causing heavy losses to people's lives and property, will be seriously investigated for their responsibilities.
Fourth, strengthen publicity and take precautions.
Development Zone News On August 8th and 9th, 10, 1 1 Use TV news of development zone to broadcast typhoon prevention information; Publish a typhoon prevention notice on the website of the development zone, and journalists are on standby at any time to follow up on matters that need publicity and reporting in time; The frontier of development is the weekly report, which will be reported in time according to the relevant situation of typhoon defense. At the same time, inform the propaganda departments of all offices to do a good job in typhoon prevention information propaganda, so that rural people can understand typhoon prevention knowledge. Qi Xin in the whole region worked together to defend against Typhoon Meihua.
20 1 1 August 8, 2008
- Previous article:How to design the signboard of the scenic spot?
- Next article:Homemade slogan
- Related articles
- Teaching plan for sorting out articles in kindergarten
- Five focus requirements for postal delivery business in Qinghai Province
- Royal Air Force detailed data collection
- Promotional slogan for the construction of public *** cultural service system: Public *** culture is free and open
- Impromptu Comments: Citizen Quality and Social Morality
- Decorative slogans of business premises in the Year of the Tiger
- Find the name of the ancient strange astronomical phenomena, and add 50 points for satisfaction.
- Excuse me, fish, how are you getting along?
- Campus health propaganda slogan
- Decoration commencement ceremony process