Joke Collection Website - News headlines - Decoration commencement ceremony process

Decoration commencement ceremony process

It is very important to lay a good foundation for decorating the house, so that everyone can have a good start before decorating. Today, Bian Xiao will introduce the process of the decoration ceremony and some plans before the decoration, hoping to help everyone.

Planning before the transformation begins

Decoration planning 1: decoration procedure

The first job before decoration is to go to the property where the decoration company is located with the project manager to go through the decoration formalities.

Decoration procedures include:

1 decoration company qualification certificate; 2 decoration plan review. Mainly depends on whether there is a moving load-bearing wall or something. Pay some related expenses. Including decoration deposit, garbage removal fee and decoration worker pass. The above fees depend on the situation of each community. 4 sign a decoration agreement. After completing the formalities, remember to electrify the property and take the keys for decoration.

Decoration planning 2: disclosure by designers and project managers

According to the decoration and design style of your home, let the project manager communicate with the designer and let them know how to design and construct better. For example, designers and project managers mainly do disclosure on wall engineering, and it is necessary to tear down a small part of the kitchen wall and extrapolate to build a refrigerator; The main guard's door has to change direction, so it is necessary to cut a doorway, fill up the original door and so on. This also depends on the style needs of each family, focusing on communication.

Decoration scheme 3: HVAC positioning.

If you want to install these things at home, you'd better communicate with your designer and decorator face to face to determine the installation location, which is related to the overall effect and beauty of the room.

Decoration planning 4: Measuring the cabinet size and heating installation design.

Here, I want to remind you of some details encountered in the decoration process:

1. Whether the workers in the decoration company embed the casing before wrapping the water pipe, and fix the natural gas hose against the wall;

2. The valve handle of the gas meter is too long, which may get in the way when wrapping the water pipe. Can you cut off a piece or put the handle upside down?

3, 4, the location of the radiator in the restaurant should be coordinated with the switch panel. In fact, it is best for designers and installers to communicate on the spot.

Decoration commencement ceremony process

1. Sacrificial materials, such as home cooking, wine, candles and paper money. In some places, there are fruits, tea, Mi Dou and other items.

2. The altar is set at the back of the house to worship, light incense sticks and burn paper money after worship.

3. After the worship ceremony, people will shout auspicious words such as auspiciousness, peace and smoothness.

Cleaning the room means sweeping the dirty things out of the door.

Stick a red note in the room and other places, and put some coins in the corner of the house.