Joke Collection Website - News headlines - What safety measures should be taken in high-altitude construction of fire fighting engineering?

What safety measures should be taken in high-altitude construction of fire fighting engineering?

The layout of the construction site is based on the principle of health, hygiene and safety, which meets the comprehensive requirements of fire prevention, lightning protection, dust prevention and electric shock prevention and the requirements of safe construction. Roads, enclosures, protection, lighting, warning signals, guards, production, warehouses and material storage yards on the construction site are all arranged in a unified manner according to the general layout.

On-site roads must be hardened, smooth, solid and smooth. Signs conforming to GB2893-82 "Safety Color" and GB4378-84 "Safety Signs" should be hung in dangerous places, and large-scale safety publicity slogans should be set up on the construction site. Guards were set up at the gate of the construction site.

Fire safety distance of all kinds of houses, sheds, material factories, etc. Comply with the regulations of the public security department. Flammables are not allowed to be stacked indoors, and smoking is strictly prohibited in woodworking factories, material warehouses and other places.

All personnel entering the site should wear safety helmets, and wear safety belts when working at heights above 2m. The tools used should be put into the tool bag or put in a safe and secure place, and can't be thrown around at will.

The erection of scaffolding and the installation of climbing frame shall comply with the relevant provisions of the construction specifications and safety protection standards on the construction site.

After windy and rainy days, all safety facilities should be carefully checked, and construction can be continued only after hidden dangers are eliminated.

Oxygen cylinders must not be contaminated with grease, acetylene generator must have safety devices to prevent backfire, and oxygen cylinders and acetylene generator should be stored separately.

Strictly manage the construction electricity consumption, conscientiously implement the regulations of the Ministry of Construction and Dalian Municipality on safe electricity consumption, and strictly follow the relevant provisions of Technical Specification for Temporary Electricity Safety in Construction Sites (JGJ468-88).

The installation, maintenance and removal of temporary power lines should be completed by trained electricians who have obtained the work license. Non-electricians are not allowed to carry out electrician operations.

Cable lines are connected in "tn-s" mode, and electrical equipment and lines must be well insulated. The hanging height and line spacing of power lines erected in the field meet the safety requirements and are installed on special poles.