Joke Collection Website - News headlines - Emergency measures for sudden rainstorm

Emergency measures for sudden rainstorm

Emergency measures for sudden rainstorm 1

In order to prevent severe weather such as rainstorm and thunderstorm, prevent possible floods and ensure the personal and campus property safety of teachers and students, this emergency response plan is formulated in combination with the reality of our school.

I. Guiding ideology

Prevent accidents, ensure personnel safety and reduce property losses.

II. Scope of application

Various inclement weather such as rainstorm, thunder and lightning, strong wind, etc.

3. Preparation

1. Before the rainstorm comes, carefully check the condition of the school building to see if the roof leaks and the wall is wet, clean up the drainage facilities such as sewer pipes and ditches, and repair them in time if there are any problems.

2. Educate teachers and students about the safety knowledge of preventing rainstorm, lightning and flood, so as to plan ahead.

3. Check the surrounding environment of the school to prevent accidents in the school due to external reasons.

4. Check the circuit equipment to prevent accidents caused by water spray.

5, division of labor in place, the implementation of personnel and responsibilities.

6. Check the section of the water embankment around our school, make flood control arrangements, and prepare personnel and equipment;

7. Determine the evacuation route and resettlement place in case of emergency, and organize teachers and students to carry out self-rescue, mutual rescue and escape drills.

Fourth, emergency measures

1. Pay attention to the weather forecast. In case of bad weather or flood season, all schools must be on duty 24 hours a day, and all personnel should keep communication open 24 hours a day, so that all kinds of personnel can be deployed in time in case of emergency.

2. During the rainstorm, the school personnel on duty and patrol personnel should frequently patrol all parts of the school. If any danger is found, they should immediately report to the leaders on duty and start the emergency procedures.

3, strong lightning weather, to do a good job of lightning protection for school personnel and distance education equipment.

4. Once the school building is in danger, quickly organize students to evacuate and move to a safe area in an orderly manner. Teachers should first ensure the personal safety of students.

5. Timely transmit information and report the situation to relevant departments and parents through campus radio, telephone, school newsletter and other media and communication tools.

6. Pay attention to the road conditions for students to go to and from school. If the road is damaged or there are potential safety hazards, the school should properly arrange the students and contact their parents in time.

7, according to the requirements of the superior leadership, timely organize personnel, and implement various preparatory measures.

5. Work requirements

1. We should attach great importance to it ideologically, overcome our paralysis and lax thinking in the spirit of being responsible for the cause of the party and the people, and make careful preparations.

2. We should do a good job in our work and have a clear division of responsibilities.

3. The organization should be coordinated and powerful to ensure the smooth implementation of government decrees. Emergency measures for sudden rainstorm 2

In order to strengthen school safety work, ensure the safety work of teachers, students and employees in the school, build a harmonious campus, prevent the occurrence of rainstorm and lightning weather safety accidents, and deal with emergencies quickly, timely and properly, and effectively reduce the occurrence of bad weather safety accidents. In accordance with the relevant requirements of the higher authorities, this plan is formulated from the reality of our school.

1. Head of the school's leading group for severe weather safety

Group leader:

Deputy head:

Members: members of the administrative group, directors of grade departments and class teachers

2. Safety measures

1. School leaders and personnel on duty should arrive at the school gate and the entrance of teaching stairs 1 minutes before school to guide and organize students to leave the teaching building and the school gate safely and orderly.

2. Each class teacher should strengthen the examination of students' attendance, know the situation and reasons of students' lateness and absence from school in time, inform parents and report the situation to the school in time.

3. In case of stormy weather, you should immediately ask the school leaders whether to suspend classes or leave school early, and inform the class teacher to strengthen students' safety education before school to prevent traffic accidents, drowning and falls. The head teacher should patrol the classroom before school, and ask the students on duty to close the doors and windows and cut off all power supplies such as computers and televisions to ensure the safety of school property.

4. When the relevant personnel of the safety leading group arrive at their posts, they should inform students of all grades to leave school in advance in case of rainstorm, and organize and guide students to leave the campus safely at the gate, and guide parents to stand on both sides of the gate to pick up students in the student area.

5. Organize relevant personnel to clean the sundries blown down by the wind and rain on campus in time, strengthen students' safety education in time, ensure the activities and personal safety of teachers and students, and prevent accidents such as falls.

6. before the arrival of extreme weather, the general affairs department should carry out self-inspection on buildings such as school buildings, venues, fences, schools, ditches, wires and trees, so as to find problems as soon as possible and eliminate potential safety hazards in time.

7. When patrolling the campus, school security guards should strengthen inspections on key parts (such as fences, billboards and publicity windows) and report the situation in time.

8. The school should arrange the administrative duty watch, and the main leaders should take the shift, and keep the communication unblocked at all times. If there is a major disaster, report the disaster to the superior in time and immediately start the emergency plan, so that the school property and the life safety of teachers and students can be protected to the maximum extent.

III. Relevant requirements

1. When bad weather stops in physical education class, the class teacher should inform the students not to enter the sports ground before the storm to prevent safety accidents.

2. In stormy weather, students in the classroom should close the doors and windows, and they should not stick their heads out of the window. In case of lightning, they should not move in the corridor to prevent lightning strikes.

3. Every teacher has the obligation to remind and protect students. Guidance and nursing teachers should stick to their posts to ensure the safety of teachers and students.

4. For matters not covered, the emergency notice of the day shall prevail. Emergency measures for sudden rainstorm 3

1. Scope of application

It is applicable to the guidance of emergency rescue work for flood control and rainstorm prevention in the project department.

II. Compilation basis

1. Law of the People's Republic of China on Work Safety (Decree No.7 of the President of the People's Republic of China)

2. Code for Geological Survey of Railway Engineering

3. Regulations on Management of Work Safety in Construction Projects

4. Regulations on Work Safety License <

2. The possible influence scope is the camp and the construction workplace, and the number of people who may be affected is the on-site construction workers.

3. An accident may cause one or several casualties, which constitutes a major safety accident/incident.

IV. Team

1. Project Emergency Leading Group

Leader: Project Manager

Deputy Team Leader: Deputy Project Manager

Team Member: Minister of General Affairs, Minister of Engineering, Minister of Quality, Minister of Materials and Equipment

Minister of Finance, Minister of Planning and Contract

2. Block diagram of project emergency rescue organization

3. Members of project emergency rescue leading group and responsibilities of all departments in the organization.

chief engineer of the project:

provide overall technical support in emergency rescue work, and be responsible for organizing the formulation of emergency rescue plan and guiding and supervising its implementation and operation.

Deputy Project Manager:

Responsible for organizing and directing emergency rescue work on the spot, which is the general dispatch of manpower, material resources and financial resources on the rescue site; Organize the specific implementation of emergency rescue technical scheme.

Minister of Engineering (Engineering Department):

Responsible for organizing the personnel of this department to formulate the emergency rescue technical scheme and for on-site guidance and supervision of the implementation and operation of the scheme.

Minister of Safety and Quality (Safety and Quality Department):

Responsible for organizing personnel of this department to participate in the preparation of emergency rescue technical scheme and guiding its implementation on site; Provide safety technical guidance and guarantee for emergency rescue work. Be responsible for protecting the site after the accident and making site records (photos, videos or sketches, etc.).

Finance Minister (Finance Department):

Responsible for providing financial support for the smooth progress of emergency rescue work.

Minister of Materials and Equipment (Material and Equipment Department):

Responsible for ensuring the supply, equipment, maintenance and use of materials and equipment required by this department during emergency rescue.

General Management Minister (General Management Department):

Responsible for organizing the personnel of this department to make internal and external contact and communication during emergency rescue.

Planning and Contract Department (Planning and Contract Department):

Responsible for helping to protect the site after the accident. If it is really necessary to make changes during the accident rescue, the site records (photos, videos or sketches, etc.) should be actively made.

emergency rescue teams (teams 1, 2, 3, 4, 5, 6, 7, 8, 9, 1):

each work area leader is responsible for directly participating in or cooperating with local professional rescue teams to participate in emergency rescue.

V. Allocation of emergency resources

1. Allocation of funds

The project finance department must guarantee an emergency reserve fund of 1, yuan, so as to have sufficient financial resources to support emergency work in case of emergency.

2. Provision of emergency materials, equipment and facilities (omitted)

3. Mobile phone number of members of the project emergency rescue leading group:

Mobile phone number of the project manager: XXXX73821; Mobile phone of the chief engineer of the project department: XXXX738277;

deputy project manager's mobile phone: XXXX738234; Mobile phone of the Minister of Engineering: XXXX738212;

mobile phone of the minister of safety and quality: XXXX738237; Mobile phone of Finance Minister: XXXX738228;

minister of materials and equipment's mobile phone: XXXX7386; Mobile phone of General Manager: XXXX738261;

planning contract minister's mobile phone: XXXX738255;

cell phone of work area chief: work area 1: XX572997277; Work area 2: XXXX738356;

the third work area: XXXX738257; Four work areas: XX781978197;

work area 5: XXXX738285; Work area 6: XXXX73851;

work area 7: XX99441476; Eight work areas:

1# beam yard: XX47698859; 2# beam yard: XX192691998.

VI. Preventive monitoring measures

(1) Flood control

1. When there is a rainstorm (rainfall 5-1mm) within 24 hours after receiving the release from the Meteorological Observatory:

(1) The leading group for flood control and rainstorm prevention shall immediately notify all relevant departments and work areas of meteorological information and prevention requirements.

(2) all relevant departments and work areas should conscientiously implement and check the preparations for flood control and rainstorm prevention in accordance with the spirit of the notice, and do all the preparatory work well.

(3) All relevant departments and work areas should be on duty 24 hours a day, lead the shift, and keep in touch with the leading groups for flood control and rainstorm prevention at all times.

2. When there is heavy rain or torrential rain (the rainfall is more than 1mm) within 24 hours after receiving the announcement from the Meteorological Observatory:

(1) The leading group for flood control and rainstorm prevention puts forward specific measures and issues a notice to all relevant departments and work areas.

(2) All relevant departments and work areas should act immediately in accordance with the spirit of the notice, check and implement the preparations for flood control and rainstorm prevention in their respective systems, and be in a state of war. Machinery and warehouses in low-lying areas prone to waterlogging and mudslides should be safely transferred by relevant units in time according to the division of responsibilities to ensure the safety of people's lives and property.

(3) All relevant departments of the project department should be on duty 24 hours a day, and the leaders should lead the shift. It is necessary to turn on the machine around the clock to ensure smooth communication and keep in touch with all work areas at all times.

(4) First-line rescue materials and rescue teams in each work area should be fully implemented, and the responsible person should be in place. In case of danger, they should be on call and quickly put into emergency rescue and disaster relief.

(II) On-site protective measures

1. According to the requirements of the emergency plan for flood control and rainstorm prevention, all emergency rescue materials and personnel are provided.

2. Check the drainage system in the camp and the construction site, dredge the river, and deal with the blocked place immediately.

3. Temporary drainage system shall be provided for subgrade works.

4. The oil depot and oil tank on the construction site should be well protected from sun and explosion.

5. The mixing building and bulk cement tank of the mixing station should be buried with ground anchors and equipped with steel ropes.

6. The placards displayed on the site should be removed to prevent damage and collapse.

7. The temporary houses on the construction site (such as staff quarters, power distribution rooms, air compressor rooms, steel shed, etc.) should be reinforced.

8. Strengthen the maintenance of construction access roads to ensure smooth and smooth roads. Emergency measures for sudden rainstorm 4

Due to the low-lying terrain of the school and the poor drainage system of Shenhe Road, there is serious water accumulation on campus (the water depth reaches 3cm-5cm) during heavy rainstorm. This plan is formulated in order to timely and properly handle the campus water accumulation events in rainstorm weather, ensure the safety of teachers and students' lives and property, and maintain the normal teaching, work and life order of the school.

1. Scope of application

In the case of rainstorm weather and water accumulation on campus, normal education, teaching and living order are affected.

II. Organizational structure

The school has set up an emergency management leading group for campus waterlogging incidents in rainstorm weather, which is organized by the principal in a unified way, commanding and coordinating operations in a unified way, and completing emergency tasks together.

Team leader:

Deputy team leader:

Members:

Teachers in charge of each class are on duty that day

There is an office under the leading group, and xx is also the director of the office.

Third, emergency measures

(1) General situation (rainstorm weather can also maintain the order of education, teaching and life)

1. Teachers on duty on that day stick to their posts, strengthen management, maintain the order of students' activities, and leaders on duty strengthen inspections to deal with emergencies in time.

2. During school hours, all members of the leading group are in place, effectively organizing students to leave school, maintaining the order of students to leave school and ensuring students' safety.

3. Students' Chinese food is delivered to all floors from the canteen, and students eat in their classrooms after lunch. The class teacher of each class assists the teacher on duty on the floor to organize students to cook; Assist canteen employees to deliver meals to all floors.

(2) Special circumstances (rainstorm weather can't maintain the work and life order of pedagogy)

1. Report to the higher authorities at the first time and ask the students to have a holiday.

2. After the holiday is approved, notify the class teacher to contact the parents of the students by telephone, and hand over each student to the parents to take it back.

3. All members of the leading group should go to the site to maintain the order after school, organize students' holidays in an orderly manner, and do relevant work well. The leader of the floor casing is in place: XX on the first floor; Second floor xx; Third floor, xx.

4, after the rain clears, organize people.