Summary is a review, inspection, analysis and evaluation after the completion of a certain period, a certain project or certain work, so as to draw lessons and regularities A kind of written material that I know. The following is a summary of construction safety work that I compiled for you. I hope you like it!

Selected Summary of Construction Safety Work 1

In order to ensure the orderly development of construction safety production in our township and effectively prevent the occurrence of various construction safety accidents, according to the Provincial Safety Committee The Office of the Council forwarded the spirit of the document "Emergency Notice of the Office of the State Council Safety Committee on Deeply Learning Lessons from Recent Accidents to Further Strengthen Construction Safety Production" and combined it with the actual situation of our township to organize construction safety work. There was no construction safety incident in the first half of the year. Production accident.

1. Conscientiously implement the responsibility for safety production in construction.

In order to conscientiously implement the work safety spirit of the county safety supervision department, our township immediately held a construction safety work meeting after receiving the document to decompose and implement the construction safety supervision responsibilities layer by layer. The responsibility for safety goals has been implemented in the area.

2. Increase the intensity of construction safety inspections.

In order to strengthen the supervision of building construction safety, our township insists on carrying out building safety construction inspections based on the actual situation, and has comprehensively deployed the inspection work. Through the inspection, we not only grasped the management of safety production in various building constructions in our township, but also immediately rectified the requirements for potential safety hazards.

3. Continue to deepen the construction safety improvement work.

In order to implement the spirit of the document, effectively strengthen the safety production work of construction construction in our township, effectively curb the trend of frequent accidents, ensure the safety of people's lives and property, and enter the construction site together with the safety production month publicity work. Improve awareness of production safety in construction. There are two major construction projects in our township this year: the renovation of dilapidated buildings in Nanchang Village Group and the hardening project of Xiangmao Highway. The specific practices of our township are as follows:

1. The village group's dangerous improvement work is the focus of our township's safety production inspection, combined with the promotion of safety production month. Our township's safety inspection team visited the construction site 6 times within half a year and promoted safe building construction 2 times.

2. The Xiangmao Highway hardening and reconstruction project is a key county project. Our township safety inspection team has always paid attention to the construction safety work of this project. There are 6 culverts built in this section of the road, and dozens of As for retaining walls, the inspection team has repeatedly proposed that cordons and warning signs must be put up at all construction sites.

3. The focus of special accident prevention is: openings, material hoists, construction hoists, hoisting machinery installation and maintenance, scaffolding erection and disassembly operations, curtain walls, and other locations prone to falls from heights. At the same time, we combined special safety rectification with daily safety management work. Through daily supervision and inspection, we deepened special safety rectification, eliminated a number of accident hazards, gradually formed a long-term supervision mechanism for safety production, and promoted the further improvement of safety production situation. Get better.

4. Pay close attention to the weak links in production safety.

Our township has always adhered to the policy of "safety first, prevention first, comprehensive management" to strengthen the supervision of weak links in safety management of resettlement sites, construction sites and other projects; strengthen the construction team's supervision of construction sites Regarding the ability to control hazard sources, the township inspection team regularly conducts safety production situation analysis, promptly discovers safety hazards, identifies weak links, intensifies supervision and inspection of accident-prone areas and weak links, and pays close attention to the prevention of accidents in advance. By taking these targeted preventive measures, the occurrence of construction safety accidents has been curbed. Selected Summary of Construction Safety Work 2

With the rapid development of cities, the contradiction between the people's demand for housing and the tight supply of urban land has become increasingly prominent. High-rise buildings have open sightlines and good lighting and ventilation in the middle and upper floors. , the building facade effect is fashionable, full of contemporary and urban sense, high floor area ratio, saving land resources and other advantages. Therefore, in urban construction, the number of high-rise buildings is increasing year by year. However, while high-rise buildings bring prosperity to the city, they also bring many problems in construction safety management. Construction production is the lifeline of construction. Strengthening construction safety management is the key to preventing construction safety accidents and improving the quality of construction projects.

In recent years, the Party Central Committee and the State Council have attached great importance to production safety and have successively promulgated laws and regulations such as the "Construction Law", "Safety Production Law", "Construction Project Safety Production Management Regulations" and "Safety Production License Regulations". Construction safety management in the construction industry has played a strong role in promoting the safety production in construction. The safety production in construction has basically embarked on a track with laws and regulations to follow. The level of construction safety management has been greatly improved, and the safety management status has been greatly improved. Improvements to a large extent have greatly reduced the occurrence of various safety accidents. However, the construction industry is an industry with a high accident rate, and has construction characteristics such as many high-altitude operations, many open-air operations, many grade-level intersection operations, and many temporary employees. Therefore, these inherent characteristics of construction projects determine that the construction process of construction projects is a production process that is highly dangerous, sudden, and prone to casualties.

1. Current safety shortcomings at high-rise building construction sites

Due to large investments, many participating entities, and complex organizational relationships, high-rise building projects have many uncertain factors during project implementation. , so the probability of safety accidents during the construction process is very high. Currently, safety accidents in high-rise building construction mainly include electric shock accidents, falling accidents from heights, object impact accidents, collapse accidents, and lifting equipment injury accidents. . Based on the mathematical statistical analysis of the characteristics of construction safety accidents in high-rise building projects and the causes of accidents, the main influencing factors of safety accidents are determined, including factors such as safety management, construction technology, worker operations, equipment and facilities, and construction environment.

1. Safety management. The third-level safety training and education for new workers has not been truly implemented. Even if there are written records in this regard, they are mostly just a formality. The workers' safety awareness and safety skills have not been effectively improved. Although the project department has formulated a safety production responsibility system, it has not been implemented. Managers do not pay attention to it ideologically and have a fluke mentality. Although there are full-time safety officers on the construction site, some of them do not have a strong sense of responsibility, fail to perform their duties, and do not play the role of inspection and correction. The contracting unit's safety funds have not been fully invested in safety production, the necessary safety fund investment is insufficient, and the safety protection facilities are greatly reduced, and even do not meet the requirements of safety regulations. Safety inspections emphasize formality and emphasize rectification.

2. Construction technology. When constructing new materials and new processes, there is no construction guidance plan or the guidance plan cannot guide the construction, and reckless and blind work leads to safety accidents. The arrangement of vertical cross construction is unreasonable, there is no isolation and protection measures, and accidents caused by objects hitting from time to time occur. The technology that has been eliminated by the state is still used in practice.

3. Worker operations. The phenomenon of working in special types of work without a certificate is serious. In the face of new processes, there are potential safety hazards when doing things the old way. There was no safety technical briefing before work, and workers acted recklessly.

4. In terms of mechanical equipment, there is no special plan for the installation and disassembly of tower cranes and cargo construction elevators. Even if there is a plan, it is not implemented according to the plan. Tower cranes and cargo elevators are seriously overloaded, leading to safety accidents. Lifting and hoisting are carried out without or blindly directed, and accidents caused by objects being struck often occur. The material loading platform of the tic-tac-toe rack has no protection, and the loading port becomes a "tiger's mouth". Safety management work summary: The maintenance of mechanical equipment is not paid attention to, the management is disordered, and the idea of ????emphasizing use and neglecting maintenance is widespread. Mechanical equipment is obsolete and aging rapidly. Many mechanical equipment has reached or even exceeded the end of life. There are constant risks of accidents in mechanical equipment.

5. On-site working environment.

The job site did not have construction conditions, but the contractor forced the workers to take risks in order to meet the deadline. The natural environment at the site is complex, and construction started before it was discovered, posing safety risks.

2. Safety protection measures for high-rise buildings

1. Electric shock safety precautions. Electricians at construction sites should strictly follow the "Technical Specifications for Safety of Temporary Electricity Use at Construction Sites". The distribution box and electrical facilities and equipment at the construction site should be reliably connected to zero and grounded, and the responsibility management of the distribution box should be strengthened. Implement one machine, one gate, one box, one leakage and one protection, and it is strictly prohibited to have multiple machines in one box. The selection of leakage protection switches in distribution boxes and switch boxes should match the electrical load, and it is strictly prohibited to use copper wire instead. Electricians should carefully record the "Electrician Inspection Record" every day and should not keep a running account. Large electrical equipment should be maintained and inspected no less than once a week, and small construction machinery should be maintained and inspected no less than once a month. Before working at height, an electrician must first determine the safe distance of surrounding external power lines and the safety of isolation and protection facilities.

2. Safety protection measures for falling from heights.

The physical health of personnel working at heights. Those suffering from acrophobia, heart disease, and high blood pressure are not allowed to work at heights. Safety belts must be fastened and used correctly when working at heights. When working at heights or near edges, the construction site should have safe and reliable scaffolding, operating platforms and other safety protection facilities. When working at heights at night, adequate lighting measures must be provided to ensure the safety of walking and working at heights. High-altitude operations should be prohibited when encountering severe weather such as strong winds of level 6 and above or thunderstorms.

3. Safety protection measures against object strikes.

Small tools used during construction should be carried with you or placed in a safe place. They should not be left randomly to prevent them from falling and injuring people. Tools and materials used during the construction process must not be thrown randomly and should be delivered in tool bags. No materials should be piled on the external scaffolding, and debris on the external scaffolding should be cleaned up on time. The construction sequence should be reasonably arranged, construction organization and coordination should be strengthened, and vertical cross-cutting operations should be reduced. When floor formwork is removed, safety protection measures should be taken along the edges to prevent formwork, square timbers, etc. from falling and injuring people.

4. Safety protection measures for external scaffolding.

Prepare a scaffolding erection and dismantling plan based on the characteristics of the project and implement it after approval. It is strictly prohibited to use rods and fasteners that are bent, deformed or severely rusted. The setting of pole foundations and sweeping poles, as well as the location, quantity, and connection methods of the connections between the frame and the building should all comply with the requirements of the construction specifications. Scaffolding boards must be fully paved and no probe boards are allowed. The unloading platform must be designed and calculated, scientifically set up, and the allowable load value must be marked in a conspicuous position. Safety technical briefings must be conducted before the scaffolding is erected. After the erection is completed, a quantitative acceptance must be carried out, and it can only be used after passing the erection.

5. Lifting and hoisting safety protection measures.

Construction shall be carried out strictly in accordance with the approved construction plan. Special operations personnel are required to undergo a physical examination before taking up their posts. Before lifting, you must check whether the mechanical insurance and limit devices are effective, conduct a test hoisting, and strictly abide by the relevant regulations for high-altitude operations. Conduct safety technical briefings for personnel participating in hoisting based on the characteristics of the project.

3. Summary of experience in safety management of high-rise buildings

1. In the bidding process for construction projects, the accident insurance system for construction projects and special funds for production safety shall be implemented. Through administrative means, special funds for safe production and civilized construction of engineering projects are separately listed, and independent fund accounts are established. Through the construction safety supervision agency, the funds will be allocated in stages depending on the compliance of the safety evaluation to ensure the normal use of special funds and avoid illegal misappropriation. Or not engaged. Implement the accidental injury insurance system for construction projects, and make project participation in safety insurance a necessary condition for construction safety supervision and start of construction; fully mobilize the consciousness, initiative and enthusiasm of project managers to ensure safe production and civilized construction.

2. Implement a “one card” management system at construction sites.

All personnel who perform front-line operations and on-site management at the construction site, including construction workers, construction site managers, etc., must apply for a real-name "one card" for construction labor services and enter the construction site with the "one card, one pass". Since the implementation of the “one-card” system, it has greatly enhanced the problem of wage arrears for migrant workers and the safety awareness of construction workers. It has achieved the goal of “not hurting others and not being hurt by others”, which has played a role in reducing the occurrence of safety accidents. Certain effect.

3. Prepare a "Special Remediation Plan for Major Hazardous Sources". Including: construction electricity, formwork engineering, scaffolding engineering, edge and opening engineering, hoisting, and construction wells. Clarify the inspection and supervision departments and responsible persons for each project, and make a "Major Hazard Source Notice Board" that lists potential risk factors, possible accidents, control measures, etc., and target these items item by item during each safety inspection. examine.

4. Organize the compilation of "Safety Manual for Construction Workers"

The quality and safety department of the enterprise compiles some "Safety Manual for Construction Workers" and distributes them to various project departments, organizes some video materials on safety knowledge and arranges them for the teams who do not work overtime in the evening to watch And prepare a sign-in form to ensure that all workers entering the site have seen it. At the same time, safety knowledge CDs are played continuously in the workers' canteen. The project department regularly publishes safety blackboard newspapers to explain some safety laws and regulations, safety common sense, advanced construction site safety deeds, safety fines, etc., to ensure that safety knowledge is not forgotten during work.

In short, construction safety is related to the safety of life and property of construction workers, as well as to the overall situation of reform, development and social stability.

During the construction process of construction projects, strict management must be carried out, responsibilities must be clearly defined, and supervision must be strengthened to ensure project quality, effectively ensure the safety of construction personnel, and safeguard the interests of construction personnel. By focusing on the key points, grasping the key points, taking a point-to-point approach, step by step, and in a planned and step-by-step manner, the safety production and civilized construction level of the entire construction site will be raised to a higher level, and the harmonious development of society will be promoted. Selected Summary of Construction Safety Work 3

In order to further strengthen safety, health and environmental management, improve the awareness of safe production and environmental protection of all employees, and implement the policy of "safety first, prevention first", Establish the idea of ??refined management and regard "people-oriented" as the criterion for safe production work. With the care, support and help of the leaders of the group company and branch companies, and with the assistance of the general project department and relevant departments, the __ project department achieved good safety production conditions in 20__ and eliminated all types of safety production accidents. Major accidents in the year were Zero, zero youth injuries, zero occupational morbidity, and 100% quality pass rate are excellent results. Summarizing the work of the past year, the specific practices of the __ project department at work:

1. Strengthen leadership and establish the idea of ????"safety first".

In order to ensure the realization of the safety production goals set by this project in 20__, the project department established a team with the project manager ____ as the team leader and ____ and others as deputy team leaders from the beginning of the annual construction. The safety production team, which is composed of technical and construction personnel, insists on conducting a monthly safety production inspection, and rewards and punishes accordingly according to relevant company documents.

In order to cooperate with the project's 20__ annual model project application and "AAA" construction site selection, all members of the __ project department took action to conduct on-site construction production, safety technology, and Civilized construction, construction site image identification, construction site office area, operation area, living area settings, etc. have been set up and improved to strengthen construction site safety management, improve the project department's comprehensive management level of safety culture and civilized construction, and standardize construction On-site visual image identification can effectively improve the safety conditions of construction sites and the living conditions of workers.

During construction and production, the __ project department always adheres to the idea of ????"safety first" and takes "people-oriented" as the guideline for safety production work, clarifying the right to life and health of employees and others during construction and production. Above corporate interests, when employees' health and production rights are harmed, the principle of prioritizing personal rights and interests must be reflected. At the project department’s safety production scheduling meeting at the beginning of the year, project manager Zhou Jiansheng emphasized many times that “quality and safety must be ensured. These two tasks must be carried out in strict accordance with the standards and regulations of the country, the company and the project department, and there is no room for negotiation. ". During the construction and production process, safety work has a veto power. If the safety measures at the construction site are not in place and there are potential safety hazards, no construction will be allowed. It fully reflects the authority of the safety production work of the __ project department and the leading ideology of safety first.

2. Implement “prevention first” operational control.

In 20__, the __ project department conscientiously implemented the policy of "safety first, prevention first", paid close attention to process control during operation, and strictly made safety preparations before each construction operation. , such as construction plans, safety technical briefings, safety protection facilities, etc., all strictly meet the standards and must be signed by the project manager. At the same time, safety supervision and inspection work during construction and production has been strengthened to ensure that all safety measures are implemented and all types of safety measures are implemented. Nip hidden dangers in the bud.

The project department insists on a comprehensive inspection once a month, and rectifies all problems found in a timely manner. At the same time, the project department strengthens daily patrol inspections, promptly discovers problems, and promptly requires each team to carry out inspections. Through rectification, various safety hazards have been eliminated in a timely manner, meeting the requirements of operational control and meeting the needs of safe production.

In the second half of 20__, the project department sent dedicated personnel to participate in the internal auditor training organized by the company, and established a "quality, safety, and environment comprehensive management system" in accordance with the company's requirements. In accordance with the new management manual Major hazardous factors and important environmental factors have been identified and evaluated, and a series of key control measures have been formulated to further increase the control of major hazardous factors such as falling from heights, strikes by objects, electric shock, mechanical injuries, fires and other factors. Focus on prevention and control, achieving the purpose of "prevention first" and effective operational control.

3. "People-oriented" education, improvement of quality and promotion of management.

In order to improve the safety production awareness and self-protection ability of all employees in this project, the project department requires that construction workers entering the construction site must receive safety education. In June, the project department organized the "Safety Production Month" safety knowledge answering education, special training and education on first aid for emergency personnel on construction sites, and training and education on operation control and monitoring of major hazards and important environmental factors; relevant leaders of the project department also participated Some construction teams held safety education activities on the "Safety Activity Day"; organized all employees of the project department and each construction team to carefully study the "Work Safety Law of the People's Republic of China" and the company's "Quality, Safety, and Environment Comprehensive Management System" "Standards and documents. It has greatly improved the awareness of production safety and environmental protection of all employees, improved the professional quality of the safety management personnel of this project, and further strengthened the basic work of safety management.

In terms of environment, our project department fully implements the environmental management rules and strictly implements various provisions of the National Environmental Law and Inner Mongolia Environmental Management Regulations. Strict supervision and management have been implemented on the emissions of air, noise, water, waste, etc.

4. Ensure safety investment and prevent the occurrence of various accidents.

The investment in safety technical measures is the guarantee for the implementation of various safety measures and the key to preventing various accidents. In March 20__, the project department purchased safety nets, safety signs, and fire extinguishing equipment. equipment, on-site temporary power line transformation, implementation of TN-S system three-phase five-wire system, three-level power distribution and two-level protection, etc., which meet the needs of safe production of this project, thereby ensuring that all safety measures on the construction site are in place and eliminating various safety production accidents.

After summarizing the management work of the project department in 20__, we have achieved excellent results and have explored many excellent working methods. At the same time, we have also discovered many shortcomings and need to make persistent efforts. Making further progress, all the staff of the __ project department are confident that they will continue to innovate on the existing basis and have the courage to forge ahead to create the brilliance of the second construction team in the coming year! Break into the world of Hua Er Jianren! Selected Summary of Construction Safety Work 4

"Responsibility for production safety is heavier than Mount Tai", and construction safety cannot be ignored. Here is a summary of our company's construction safety work in the second half of __ year:

1. Implement the construction safety responsibility system and improve the safety system

The company leaders attach great importance to construction safety production work , this work should be regarded as a major matter that emphasizes politics, ensures stability, and promotes development, and incorporates it into the target management system. On the one hand, we adhere to the policy of "safety first, prevention first, and comprehensive management", with the implementation of the safety production responsibility system as the core; on the other hand, we take the supervision of construction sites as the top priority and fully implement the implementation of various specifications. All-round and multi-angle supervision of construction work in the entire district has been achieved.

2. Increase publicity and strengthen safety education for migrant workers

Most of the front-line operators come from rural areas. They generally have low education levels, weak safety awareness, and poor self-protection awareness. Therefore, it is crucial to strengthen workers' safety awareness, improve safety skills, and strengthen safety production publicity and education. On the one hand, we urge all construction units to implement their responsibilities and put the system on the wall; on the other hand, we effectively incorporate safety production education activities into regular supervision to ensure that every construction worker receives careful and careful fire safety education and comprehensively improve the safety awareness of construction workers. Create a strong atmosphere of "pay attention to safety and care for life".

3. Strengthen on-site management to ensure that disasters are nipped in the bud

1. Supervise construction units to leave temporary fire lanes at the construction site and ensure their smooth flow.

2. The construction site must be equipped with fire-fighting equipment, and the layout and selection must be reasonable.

3. The construction site is required to ensure sufficient water sources to ensure water consumption requirements during the duration of the fire.

4. Strictly manage the qualifications of special operations personnel, requiring personnel who install electrical equipment and perform electric and gas welding operations to have corresponding special operation qualification certificates.

5. Strengthen on-site material management. Safety nets and dense-mesh safety nets used at construction sites must comply with national standards or industry standards, and flammable and combustible materials must not be used.

6. The construction unit is required to establish and improve the temporary power management system, strengthen the temporary power construction management, and strictly implement the temporary power usage specifications at the construction site.

7. The construction unit is required to strengthen the daily management of temporary dormitories and office buildings, the management of doors and windows in work sheds, and the area per person should comply with fire protection requirements.

Through this series of measures, the construction work in our district is generally under control, and no safety accidents have occurred. Selected Summary of Construction Safety Work 5

Further implement various quality laws, regulations, and technical standards, deepen the quality awareness of all employees, strive to improve quality management levels, and conscientiously implement the construction and implementation of Pudong New Area in __ City The spirit of the relevant document notice of the Transportation Committee on carrying out quality month activities. __ Municipal Affordable Housing Sanlin Base Lot 7 Project (D3-2) combines the actual situation of the project department, adapts measures to local conditions, actively cooperates and carries out the "Quality Month" activities, and strives to push the quality level of the project to a higher level A new level.

1. Activity materials

1. Hang banners and slogans during the "Quality Month" to strengthen the quality management of the Quality Month, quality control, and publicity of the importance of quality, so that The theme of the "Quality Month" activity is deeply rooted in the hearts of the people.

2. Organize various departments of the project department to conduct joint inspections of on-site construction quality, propose solutions to quality

problems and common quality problems existing on site, and strengthen the rectification of these problems Strengthen efforts to ensure that project quality defects are nipped in the bud.

3. Organize relevant technical personnel and construction personnel to discuss the common quality problem control plan and preventive measures at the construction site, do a good job in explaining the common quality problem plan and preventive measures, and analyze the existing quality hazards in advance. Control at the source;

4. Strengthen the training of workers, including construction procedures, technology and related technical and quality training for new employees entering the site.

2. Achievements from carrying out the "Quality Month"

1. The quality management system has become more complete

After nearly a month of carrying out the "Quality Month" activities , our project department has further improved the quality management system, established a quality management team headed by the project manager, and implemented the quality policy of all-staff management. The quality management responsibilities are further clarified, the quality management information is refined, and the rewards and penalties for quality management are increased!

2. The goals of quality management are more clear

This time " The theme of the "Quality Month" activity is "Abide by quality integrity and build high-quality projects", so the key to carrying out this activity lies in the implementation of "quality integrity". The current difficulty in construction site management is that the quality of on-site construction personnel is generally low, so Ensuring that construction personnel "abide by quality integrity" is the key to ensuring project quality. After this activity, our project department further clarified: the top priority of project quality management is to strengthen the cultivation of construction personnel's awareness of quality and integrity.

3. The quality awareness of construction personnel has been significantly improved

During the implementation of this quality month, our project department actively responded to the "About the Construction of Pudong New Area in 20__" "Notice of Project Quality Month Activities" document calls for the purpose of improving the quality awareness of construction personnel, carefully training and educating on-site construction personnel, and at the same time striving to create a good atmosphere of "strengthening quality management awareness" at the construction site. Improved the subjective initiative of construction personnel's quality management awareness.

3. Outlook for quality work in the future

The "Quality Month" in 20__ will soon be over, but doing a good job in quality work is the eternal theme of the company, and it is also the key to the quality of the project department. an important point. As the management work of the project department of Lot 7 (D3-2) of the Sanlin Base of affordable housing in __ City, the quality work has a long way to go. After the launch of this "Quality Month" activity, our project department, although in a certain Some improvements have been made in some aspects, but at the same time, deficiencies in quality and safety have been exposed. I believe that the launch of this event is just the beginning. All employees of the project department will continue to work hard to survive and develop with quality, and to defend the project department of Lot 7, Sanlin Base, Sanlin Base, __ city’s affordable housing, and Heilongjiang Construction Engineering Group Co., Ltd. Responsibilities Company image. Strive to adhere to quality integrity and ensure the construction of high-quality projects!