Joke Collection Website - News headlines - On-site construction enclosure plan?

On-site construction enclosure plan?

The on-site construction enclosure plan is very important. Only by in-depth understanding of every detail before formulating can you do your best based on experience and complete the project smoothly. Zhongda Consulting will give you a detailed introduction to the on-site construction enclosure plan.

1. The reserved holes on site must be closed and covered in time. In dangerous places, two protective railings should be set up at the edges, and red sign lights should be set up at night.

2. The construction sections at each intersection are enclosed with steel pipes and fully hung with safety nets for maintenance. At the same time, relevant traffic safety signs are arranged at each entrance and exit along the line according to the situation and in accordance with national standards. , such as "Construction ahead, vehicles move slowly", "Construction ahead, vehicles detour", no-travel signs, etc. Set up reflective signs and hang red lights at intersections with heavy traffic volume at night.

3. Before construction, set up notice boards at major intersections to inform surrounding citizens that the project is about to start. A notice will be issued before the intersection is closed, informing drivers passing through this area in advance when the road will be closed. Please make a detour during the road closure to avoid traffic jams and dilemmas.

4. Based on the fact that this road section is the main entrance and exit in the east-west direction, and the actual distance between the road red line and the central hospital is relatively close, when constructing sewers, first contact the relevant departments for support, and then install the pipeline in this section During the construction period, personnel from all units will be notified to take detours and consider reserving a 3-5m wide temporary passage between the north and south sides for citizens to enter and exit. In order to avoid accidents when citizens enter and leave the hospital, the footpath at the entrance of the guard area is closed with a color steel plate structure to allow vehicles to enter the central hospital on Dahua Road.

5. The closure of major intersections shall adopt color steel plate structures with a height of no less than 2m. That is, the combination of color steel plate and angle steel is used. The angle steel is welded as a support and fixed to the ground. The color steel plate is placed on the angle steel support to form a closed whole, which is beautiful and practical.

6. Adopt the construction organization plan of half construction and opening to traffic. That is, half of the old road will continue to be open to traffic, and the other half of the road will be constructed at the same time. After completion, traffic will be redirected to the new road, and half of the old road will be constructed again.

7. Enclose first and then construct to ensure construction safety, traffic safety and smooth traffic during the construction period.

8. The construction site shall be managed in a closed manner and a 2m fence shall be set up around it.

9. The half-width construction section should not be too long, preferably no more than 300 to 500m.

10. In order to ensure the project quality and construction period requirements, the project department will invest sufficient construction machinery and manpower to carry out construction in 4 to 6 construction areas at the same time. According to the construction drawings, each construction area is basically distributed linearly and can be constructed independently.

11. Implement phased construction in the construction area where necessary road sections must be retained. Through reasonable construction arrangements, only half of the road will be enclosed during each stage of construction, and the other half of the road will be retained for traffic. After completion, The other half of the road will be enclosed for construction. Through the above-mentioned construction arrangements, traffic obstruction caused by road construction can be minimized, the impact caused by cross-working operations can be reduced, and the construction period requirements can be guaranteed, thereby ensuring the smooth progress of the entire project. Each construction section organizes flow operations to maintain the continuity of construction operations, and effectively organizes resource allocation to ensure construction quality.

12. Hang warning signs. Hang a speed limit warning sign 80 meters in front of the passage and place a "Construction Ahead, Slow Down" sign.

13. Hang safety warning lights at eye-catching locations on both sides of the passage entrance and on the closed fence railings to remind passing vehicles to pay attention to driving safety.

14. In order to ensure smooth driving in the passage, hang reflective paper on both sides of the inside of the passage and install lighting equipment to remind drivers to slow down and pay attention to driving safety.

15. In order to prevent unnecessary losses caused by passing vehicles hitting the channel supports and ensure driving safety, an anti-collision base is set up in front of the channel. The anti-collision base is triangular and reliably connected to the ground.

16. During the construction process, at each branch intersection where traffic is reserved, half of the construction will be carried out first, and then the other half will be excavated after completion to maintain the entry and exit needs of vehicles and people.

17. During each construction section, full-time personnel will be assigned to conduct traffic diversion work day and night. Especially during peak traffic periods, they will actively cooperate with the traffic police to ensure smooth traffic.

18. The construction site has complete civilized signs and the signs are clear and tidy.

For road improvement and long-term maintenance projects, polite and polite placards such as "We apologize for the inconvenience caused to you due to the construction" are erected at the construction site.

19. In order to ensure the safety of driving at night, the fence will be equipped with sufficient warning lights so that driving vehicles can clearly see before entering the construction site. Lighting facilities will be equipped in the construction area in the direction of driving. When entering the site, the safety of driving vehicles and other structures can be ensured.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd