Joke Collection Website - News headlines - A brief weekly work summary report

A brief weekly work summary report

Inadvertently, the work has come to an end. Looking back on this period, our work ability and experience have grown. Let us summarize it and record it in the work summary. Below is a brief weekly work summary report that I compiled for you. If you like it, you can share it with your friends!

Short weekly work summary report 1

p>

Now I will report on the work of the workshop last week as follows:

1. Main faults:

None

2. Activity status

p>

1. Continue to carry out the 100-day safety competition to "strengthen the management of trunk optical cables, ensure smooth flow, and reduce delays". The workshop continues to organize cadres, divide work and guarantee guarantees, go deep into the front line, and comprehensively and carefully investigate the safety hazards of each trunk optical cable and signal semi-automatic cable path.

2. Continue to carry out construction and flood control safety inspection activities. In conjunction with the pre-flood flood control safety inspection activities, the workshop conducted a comprehensive inspection of various construction sites and weak and dangerous places with flood control. No problems were found during last week's inspection.

During last week’s inspection, workshop cadres visited the site for a total of 61 times, inspected 15 teams, monitored 26 key positions, found and solved 1 problem of various types, and issued 1 card, effectively solving the system Hidden dangers and problems in implementation, design quality, cadre performance, safety responsibility awareness, etc.

3. Protection status of key construction locations

The workshop continues to strengthen surveillance and inspection of each construction site. Last week, the workshop inspected a total of 13 construction sites. In conjunction with the construction and flood control safety inspection activities, the workshop strengthened the safety inspection of optical cables at each construction site, focusing on discovering and solving insufficient burial depth, exposure, channel cover damage, and marking of optical cables. We will also strengthen the management of construction cooperation systems and disciplines to solve problems such as missing stone signboards, and make every effort to ensure communication safety at each construction site.

IV. Status of Emergency Drill

Last week, the workshop carried out emergency picture transmission test on time, transmitting 9 still pictures and 1 moving picture. The operators were proficient in the operation and the picture transmission was The effect is good.

5. Engineering Cooperation

Currently, there are 22 construction projects under construction in the workshop. The workshop continues to track, monitor and inspect the construction points of various projects, strengthen the management and organization of construction cooperation, and strengthen cooperation in key locations to ensure the safety and smooth flow of communication channels.

6. Telegram work

Last week, the telegraph offices and telephone offices in the Tianjin workshop continued to do a good job in telegram acceptance, delivery and telephone office window services to provide users with high-quality services. Serve.

7. Wireless and Broadcasting Work

Last week, the workshop continued to strengthen monitoring and inspection of wireless team operations and duty discipline, and continuously strengthened the level of wireless operations.

Last week, Lieguang Work Area continued to carry out the inspection of train broadcasting equipment in and out of the warehouse, as well as the inspection and rectification of spare equipment to ensure the needs of train broadcasting.

8. Beijing-Shanghai High-speed Railway

Last week, the Beijing-Shanghai High-speed Railway work area continued to strengthen inspections of computer room equipment, discover problems and hidden dangers, deal with them in time, and overcome them in a timely manner to ensure the safety of the Beijing-Shanghai High-speed Railway communication equipment. Safe to use.

9. Party and Mass Work

Last week, the workshop continued to promote the activity of "serving passengers first and striving for excellence". The party branch of the workshop led the cadres and workers to conscientiously carry out "strengthening trunk optical cables" During the "100-day safety competition to "rectify, maintain smooth traffic, and reduce delays" and construction flood control safety inspections, the workshop and the team worked together to check for leaks and fill in the gaps, make vigorous rectifications, and go all out to ensure the safety of communication equipment and optical cable lines. Safe to use.

10. Completion status of key tasks

1. Carry out the 100-day safety competition of "strengthening optical cable remediation, ensuring smooth flow, and reducing delays".

2. Carry out construction and flood control safety inspections.

4. Ensure the safety of important passages.

5. Ensure conference equipment.

Brief weekly work summary report 2

In order to sum up experience, continuously improve the business capabilities of the undergraduate department, and overcome shortcomings, the work of the past week is briefly reviewed and summarized as follows:

1. Since the No. 2 process lane reached the roof, the undergraduate department went down to the mine to conduct on-site measurements of the No. 2 process lane and provided relevant data and drawings for changes in the construction plan. Construction errors occurred in the No. 2 process lane. , which is closely related to the undergraduate department. The undergraduate department has punished the relevant responsible persons. In the future tunnel setting-out work, the lessons learned from this compass setting-out must be learned;

2. In order to facilitate and master the construction of the 770 permanent refuge chamber The actual construction situation was measured to ensure the quality of the project, and the mid-waist line was combined and extended; the laser pointer of the 807 return air tunnel was calibrated;

3. In order to ensure the comprehensive The work of laying out top guns was carried out smoothly. Our department compiled relevant safety technical measures, drew warning maps for firing, and carried out measurements and laying out lines on the ground according to the drawings;

4. Warmly welcomed the superiors The administrative departments (Beijiang Branch and Changji Prefecture Branch) conducted a major inspection of our mine, participated in relevant meetings, conscientiously implemented rectification measures, and did a good job in changing the relevant certificates of the mine;

5. Prepared the "807 Main Transport Coal Door Operating Procedures" and made preparations for the start of the 807 Main Transport Coal Door;

6. Underground roof separation layer instrument plate and three diagrams and one table The construction board was scrubbed, and the roof separation layer meter was regularly observed and recorded;

7. Organize and modify the relevant technical measures and drawings of the undergraduate department, and continuously supplement and improve the documents and materials for the standardization of geological survey and water quality control ;

In order to do a good job in the work of the undergraduate department this week, the work plan for this week is now briefly arranged as follows:

1. Notify all relevant departments and responsible persons to jointly review the "807 Main Transportation" "Coal Door Operation Procedures", be ready to measure and set out the main transportation coal door opening at any time;

2. Notify the mining technicians and engineering acceptance personnel of the whole mine to go to the technical department to participate in the "Underground Setting Out, Middle Waist Line Extension" 》Technical training work;

3. Do a good job in measuring the connection between the 770 permanent refuge chamber and the dedicated return air going up the mountain;

4. Prepare the instructions for installing the pedestrian ladder for the dedicated return air going up the mountain. Safety technical measures;

5. Prepare the operating procedures for the "No. 3 Process Lane on the Mechanized Caving Surface" and be ready to measure and set out the opening of the No. 3 Process Lane at any time.

Brief daily report Weekly work summary report 3

Summary of main work this week

1. Handle the transfer of a civil servant from outside the system, salary approval and other related procedures.

2. Do a good job in reviewing and summarizing the continuing education hours for professional and technical personnel in public institutions with senior professional titles, and report to the provincial bureau for confirmation.

3. Handle the file transfer procedures for Huang Guochun and Wei Zhenyi of the Municipal Quality Inspection Institute, and carefully review the file materials of the two comrades.

4. According to the requirements of the provincial bureau, collect the status of personnel who have been commended by the provincial and ministerial levels or above since 20__ and report to the provincial bureau in a timely manner.

5. Organize a cadre inspection team to go to Xianyou County Bureau to inspect and understand the work of Comrade Cai Zhenfeng in the past six months.

6. Make continuing education certificates for new recruits of public institutions and submit them to the provincial bureau for sealing.

7. Formulate a work plan to improve the quality and potential of cadres and submit it to leaders for approval.

8. Prepare the salary fund registration materials for the integration and changes of the city's system units, and submit them to the Provincial Work Reform Office for review and registration.

9. Extensively solicit and collect opinions from all units to formulate and launch the 20__ education and training plan for the city’s quality supervision system.

10. Timely organize relevant personnel to attend the "Golden Forum" held by the Provincial Bureau on time, and do a good job in the organization, sign-in, and seating arrangement of education and training.

Main work plan for next week

1. In accordance with the spirit of the provincial bureau’s notice, we will begin to increase the allowance and subsidy standards for current and retired personnel of the city’s administrative agencies.

2. Handle the recruitment, salary verification and other related procedures for the newly recruited four professional and technical personnel.

3. Report the inspection status of Huang Guochun, Wei Zhenyi and other comrades of the Municipal Quality Inspection Institute to the party group, and start the relevant procedures for direct recruitment through assessment.

4. Handle the transfer of a professional and technical personnel from the Sanming Municipal Bureau and other related procedures for approval.

5. Summarize the status of education and training in the city's system and recommend advanced examples of doctoral and master's students (including current students), and report to the provincial bureau in a timely manner.

6. Prepare a summary of the first quarter’s work and submit it to the office in a timely manner.

7. After formulating a request for instructions on the "Competitive Employment Plan for Some Section-Level Leadership Positions" and submitting it to the Provincial Bureau for approval, all preparatory work for competitive employment will begin.

Brief weekly work summary report 4

Review this week, your work situation, ask yourself, and summarize frankly. There are still deficiencies in many aspects. During this week, my leaders and colleagues gave me a lot of care and guidance, coupled with my unremitting efforts, I made great progress in all aspects.

1. Summary of personal aspects

I am well aware of my responsibilities: the mission of fulfilling my duties for the company and serving my customers attentively!

Although my job The work of other colleagues in the company is much easier and simpler, but you still have to do your best to do everything well, no matter it is a big or small thing. The system formulated by the company can be well observed and implemented, and the company can work proactively. At the same time, it can strengthen its own learning, constantly improve its business knowledge and work ability, and receive every customer who comes to the company with the best company image. , do not do anything detrimental to the interests of the company.

2. Summary of work

After this period of study and related training, I feel that I have done a good job this week. The first is to deal with the customers and other people who came to the company. I no longer feared and worried, and bravely received them with the most beautiful smile and polite language. After the guests sat down, I immediately served them tea and water. The second is the issue of company employees eating every day. I am the statistician of the number of people eating every day. How many people eat, whether anyone fails to eat, and whether the meal time is accurate or not are all regulated and controlled by me. There were not many people without food during this week, which was a breakthrough. There were two times when breakfast was not made on time, about half an hour late. Regarding this problem, I still need to communicate with the restaurant staff more and adjust it.

In short, after summarizing my work this week, I also found that there are many shortcomings. At the same time, I also accumulated experience in future work for myself and clarified the direction. In future work, I will take the company's business philosophy as the coordinate, integrate my work ability with the company's specific environment, use my own advantages, and work hard.

Brief weekly work summary report 5

Under the leadership of the district committee and district government, and under the guidance of the district Science and Technology Association and other relevant departments, the town’s current science popularization week Focusing on the theme of putting people first with science and technology - protecting the ecological environment and building a beautiful home, the party committee and government actively cooperated with the town Science and Technology Association, environmental protection, women's federation, farmers' mouth and other departments to carry out various forms of science popularization activities, and achieved good results. The results have been well received by leaders and the masses. This week’s work is summarized as follows:

1. Strengthening leadership

The main leaders of the town have given strong support to the successful hosting of this science popularization week. According to the notice of the district’s “Two Offices” spirit, it is designated that the secretary in charge and the town mayor are personally responsible, and the town science and technology association, environmental protection and other departments come up with specific plans. After the plan was reviewed by the party committee secretary on May 10, it was designated to be implemented strictly in accordance with the plan. They provided strong support in terms of human and financial resources, making the event a complete success.

2. Do a good job in publicity

In order to conscientiously implement the spirit of the notice of the district’s “Two Offices” on holding the third science popularization week, our town hung a There were three banners and 50 slogans posted. The Agricultural Service Center used the market to carry out scientific and technological activities and provide on-site answers to common diseases and pests that appear in current agricultural production.

3. Some gains

1. The environmental protection competition among the town’s leading cadres has been improved. Through Director Xu’s report, everyone clearly realized that protecting the environment is not just about that The whole society must take care of people, departments, and places. No matter how good the environment of our town is, if the general environment is not good, dust from rivers thousands of miles away can still fly here, and there will still be acid rain. harm.

2. Farmers have a new understanding of environmental protection knowledge. Through expert lectures and knowledge competitions, farmers' knowledge of environmental protection has improved. They know what acid rain is, how to apply fertilizer without poisoning the soil, and the safe use intervals of pesticides.

3. The leadership’s attention, support from superior departments, good work plans, and close cooperation between various departments are the key to the success of Science Popularization Week activities.

Articles related to brief weekly work summary report:

★ 5 short and latest personal weekly work summary reports

★ Short and latest personal weekly work summary report 5 articles

★ The latest 5 short personal work summary examples for the week

★ 5 short personal work summary examples for employees

★ Short personal work summary for the week The latest 5 articles in the general version

★ A brief summary of one week's work summary

★ The latest 5 short examples of personal one-week work summary report

★ The latest one-week work summary 5 short and latest sample essays

★ 5 short and latest essays on one-week work summary

★ 5 short and latest personal one-week work summary