I. Measures for Safety in Production

1, establish and improve the safety organization, strengthen the leadership of the safety inspection system on duty, equipped with full-time safety inspectors with a strong sense of responsibility, and have safety disclosure for each construction task. Conscientiously implement the responsibility system for production safety and rules and regulations, conduct pre-job safety training for construction personnel and conduct targeted safety education once a week. Strengthen safety protection, prohibit illegal operations, and implement the four major safety systems of full staff, comprehensiveness, whole process and all-weather (that is, everyone, everywhere, advancing with the times and everything).

2, construction machinery leakage protector, mechanical equipment do just one brake, brake box has a door lock, construction electricity according to the three-phase five-wire system settings, each machine is responsible for the use, maintenance, inspection, storage, in case of mechanical casualties. The switch box shall be equipped with rain-proof equipment. Non-electromechanical personnel are prohibited from using mechanical equipment. Gantry should be equipped with grounding and lightning protection devices, and construction machines and tools should be checked regularly.

3. All personnel entering the construction site must wear safety helmet and hat belt. Aerial work personnel should fasten their seat belts. It is forbidden to throw objects from a height when working. Protective shed should be set around the entrance of the building. The erection of feeding platform should meet the safety requirements. The safety net should be hung on the external scaffold. It can only be used after inspection. The stairs are protected by temporary railings. The coordination fence on the construction site prohibits non-construction personnel from entering the construction site at will. Woodworking room and living area are equipped with fire pool and fire equipment.

Second, the safety technical measures

1, basic operation

1) In the process of excavation, in case of underground pipelines and cables and notify the construction unit, it shall be handled in time.

2) The accumulated water should be removed in time. If cracks are found in the wall of the pond, the soil plate should be supported to prevent collapse, and warning signs should be hung.

3) Prepare earthwork construction scheme and foundation construction scheme for foundation operation.

2, high homework:

1) Strengthen the behavior safety education of workers working at heights. Operators should be healthy, wear elastic clothes, wear non-slip shoes with soft soles, do not throw things down, and do not rest on the edge of railings, platforms and holes.

2) It is forbidden to climb external scaffolding and gantry, and it is forbidden to work after drinking.

3) Fasten your seat belt correctly and resolutely obey the command of the ground commander.

3, construction electricity and protection:

1) Lighting equipment and lighting lines must be erected and dismantled by electricians.

2) To implement tn-s, only one brake is needed to install the leakage protector.

3) The distribution box should be locked and rainproof equipment should be used. Generally, it should achieve secondary protection of three-level distribution.

4) Operators must wear insulating gloves and shoes and hold relevant certificates.

4. Hoisting:

1) When it is difficult for the crane in the operation room far from the ground to command normally, two commanders can be set up or walkie-talkies can be used for command.

2) In case of severe weather, such as gale above level 6 or fog, rainstorm and heavy snow, stop the construction operation immediately.

3) The vertical speed of heavy objects should be even, and it is forbidden to brake suddenly or slowly. The rotation should be smooth and safe, and the reverse movement is not allowed before the rotation stops.

4) The horizontal diagonal bar attached to the gantry wall should be kept horizontal and embedded with the wall connector, and the included angle between the diagonal bar railing and the wall is 45 ~ 60.

5) Height limiter, parking device and rope breaking safety device shall be installed. The receiving platform shall be laid firmly. It is forbidden to stand on the hanging basket and overload the goods.

5. Four major protections:

1) The reserved holes shall be provided with solid cover plates, fences, safety nets and other devices to prevent falling off.

2) Stairs, access points and receiving platforms shall be provided with railings and bamboo basketry, which shall be tightly closed. The limb openings larger than 25cm shall be protected by bamboo basketry and bamboo.

Third, the civilized construction organization measures:

In order to further strengthen the management of safe and civilized construction on the construction site and further implement the specific requirements of DocumentNo.. Lujiang county construction management bureau [200 1]64, combined with the company's notice on strengthening the implementation rules of safe production and civilized construction on the construction site, and in view of the characteristics of this project department, this method is specially formulated:

(1) On-site gatehouse and fence

In this site, there is a duty room near the roadside, and the wall is brick.

(two) duty room and office, conference room:

Tables and chairs for registration, visiting registers and helmets of not less than 10 shall be placed indoors, and personnel must wear helmets when entering the site.

The office is a brick house with walls, with an office area of about 20 square meters; Quality signs are hung indoors, and there is a safety and civilized organization of the project department. Office tables and chairs must be prepared in a unified way and in a unified tone. At the same time, the color of office appliances is uniform. At the same time, office appliances and documents (cabinets) should be placed neatly and used as meeting rooms, desks and offices. The office area must be affixed with the words * * * of the person in charge of health.

Due to the site conditions, this office also doubles as a conference room.

(3) canteens, dormitories and toilets.

The canteen adopts tile roof, which is located on the east side of the construction site. The toilet is in the south of the construction site. Now two tile houses have been built.

(4) Material stacking

Site building materials, components, materials, tools, construction waste, etc. Stack them neatly according to the site layout, and hang the signs made by the company and the responsible person in the responsible area. Individuals and teams that fail to do so shall be fined according to regulations and publicized on the blackboard.

(5) site fire prevention

In the safety management data, the fire control measures approved by the company shall be compiled. A fire pool should be set at the entrance or entrance of the duty room on the construction site. Set up a yellow sand storage shed, and hang 3 ~ 4 fire extinguishers and fire buckets in the open air. At the same time, a certain number of fire-fighting equipment shall be equipped at the key fire-fighting parts on site, and eye-catching signs shall be set up. On-site hot work must be applied by hot work personnel and approved by the project manager.

(6) Community service

On the construction site near the outside of the fence, it is indicated that Lujiang Chenguang Construction and Installation Co., Ltd. is under construction, which brings inconvenience to your life. Please give me some slogans like understanding. If it is necessary to construct at night due to the construction technology, you should apply to the environmental protection department for registration one day in advance, and do a good job of appeasing the surrounding residents to achieve the purpose of not disturbing the people.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd