Joke Collection Website - News headlines - Commitment letter for construction according to drawings

Commitment letter for construction according to drawings

According to the drawings of the construction commitment model.

Letter of Commitment for Drawing Construction Part I: Letter of Commitment for Construction Safety

Commitment letter for construction safety

In order to ensure the safety of the air-conditioning maintenance project of Zhanjiang Tongshi Enterprise Co., Ltd. (hereinafter referred to as Party A), I am willing to abide by the following operational safety regulations of Party A and take full responsibility, and hereby sign this letter of commitment.

I. Powers and responsibilities:

1. The author promises to buy personal accident insurance for the construction workers, and bear all the occupational accident compensation responsibilities for the accidental casualties of the employees he employs.

2. The dealer promises to implement all work safety specifications and observe automatic inspection. If employees are killed or injured or any other disasters are caused by negligence, he is willing to bear all the responsibilities, which has nothing to do with Party A. If Party A suffers various losses, he shall be liable for compensation. In case of safety accident, Party A is willing to accept a fine of 2000-5000 yuan.

3. The gaming company promises that if the construction personnel have an accident, the gaming company will send personnel to the hospital for treatment. If the injured person is not escorted, Party A will assist in handling it, and the relevant expenses will still be borne by the organizer.

4. Founder

Commitment to full-time or designated safety management personnel to cooperate with the following matters:

4. 1 Before entering the factory for construction, conduct safety training and publicity for construction personnel according to the relevant matters of the engineering safety meeting;

4.2 Before construction every day during the project; Hold an early meeting of construction personnel; Publicize the construction safety specifications of the day;

4.3 In daily construction; Always patrol the construction area; Cooperate with Party A to improve the problem in time;

5. The author promises to abide by Party A's outsourcing construction safety management regulations, factory management regulations, construction safety commitments and other related safety matters; In case of non-conformity, Party A has the right to order rectification in place, and impose a fine of more than 65,438+0,000 yuan (inclusive) on the hidden safety defects found by Party A, and the fine shall be borne by the company where the book making machine is located.

6. The publisher promises to set up a reasonable construction safety passage at the construction site, and post safety construction signs and safety construction propaganda slogans. There are obvious warning signs in the construction area, and protective isolation measures are set up. The edges and pits of dangerous parts should be protected and sealed by fences, and safety warning lights should be added when necessary. The protective articles used by construction personnel are effective and complete, and they are worn according to the specifications.

7. The bookmaker promises to remove the garbage caused by the construction in time to ensure the cleanliness of the site.

Second, the safety management personnel qualification and certificate management

1. The project under construction has full-time safety management personnel and holds the safety qualification certificate recognized by the market.

2. For non-construction projects (sporadic maintenance projects, etc. ), specify the safety management personnel.

3. Special operations personnel (such as welding, cutting operations, electrician operations, etc.). ), and the real safety supervision, quality supervision and other departments,

Valid special operation certificate.

Third, the construction personnel management:

1. Construction personnel shall wear certificates according to Party A's factory entry regulations.

2. The construction personnel must be adults (18 years old or older), in good health, able to climb and free from acrophobia.

3. Construction personnel shall abide by the basic specifications of Party A's factory, such as not wearing slippers, not walking on the sidewalk, not smoking in the factory, not working after drinking, not littering, not spitting, etc.

4. Any personnel of the construction factory are forbidden to bring cigarettes and lighters into the construction site. Before entering the factory, distribute cigarettes and lighters according to Party A's regulations.

Lighters are stored in the cigarette storage area of the guard room. Smoking is required in designated places, and smoking is not allowed when entering the factory. If it happens, the company to which the person belongs will be punished immediately, and the amount of punishment will exceed 1000 yuan (inclusive)/once found; If a smoker is found on the site, the company to which the person belongs shall be punished immediately, and the penalty amount shall be more than 1000 yuan/person, and the person shall be prohibited from entering the construction site; If cigarette butts are found on site, the manufacturer shall be punished immediately, and the penalty amount shall be more than 1000 yuan (inclusive)/cigarette butt. If there are multiple manufacturers working in the factory, no one will admit that all manufacturers will be punished.

5. Construction personnel must wear safety helmets correctly when entering the construction area; When entering the production area, you must wear clothes and hats according to regulations.

6. The organizer shall assign the site supervisor or supervisor to be responsible for the management of all project personnel and abide by the factory regulations of Party A.. Party A has the right to drive those who do not comply with the regulations away from the factory or call the police.

7. Construction personnel can only engage in relevant construction work in the construction area, and shall not stay or wander in the non-construction area of Party A, and shall not take any products of Party A's company without permission. Once found, it should be driven away from the factory and not allowed to enter the factory again for construction.

1. The newly-built factory buildings and workshops are surrounded by 2-meter-high colored steel plates or brick walls, and the external scaffolding is fully enclosed.

The whole network, the temporary construction fence is more than 5 meters away from the factory building; And set up warning signs.

2. The renovation and maintenance of workshops/warehouses and other buildings should be separated from the non-construction area by fireproof materials, and the enclosure height should be determined according to the requirements of the construction environment. Fireproof materials such as color steel plate, canvas, brick wall, etc. ; And set up warning signs.

3. Hoisting operation: Hoisting personnel should wear safety helmets and enclose warning railings or warning belts. Set a warning belt at the rotating radius of the boom, and it is forbidden to stand or pass; When hoisting, there should be a special person responsible for unified command, and the commander should be located where the operator can see the whole hoisting process clearly; And set up warning signs.

4. Edge protection must be carried out in foundation pit construction: 1.2M high railing protection is used for edge protection with a depth less than 2M, which is ultra-deep.

The foundation pit construction in 2M area must also adopt dense mesh safety net for closed protection. The distance between the limb protective railing and the edge of the foundation pit shall not be less than 50 cm.

5. Four-port security protection:

(1) Stairs are provided with protective railings, with a height of1.2m;

(2) Safety protective railings and horizontal safety protective nets with a height of 1.2 meters are set around the entrance of the elevator shaft;

(3) The reserved hole shall be provided with protective railings with a height of 1.2m, and a cover plate or a horizontal safety net shall be provided;

The side adopts the first layer of bamboo fence, the second layer adopts multi-layer wooden boards, and warning signs are set, and safety warning signs are hung above the protective shed, as shown in the following figure. ? (4) The opening is provided with a safe passage, the ceiling is provided with two protective layers, the bottom is covered with bamboo pieces, and the top is covered with 50mm thick pine boards;

Five, fire and explosion:

1. Before hot work in the construction area, the application for hot work shall be obtained as required. After approval, the hot work personnel shall sign the hot work application form for confirmation. If the project is started without applying for hot work or approval of hot work application, the penalty amount is more than 65,438 yuan+0,000 yuan/time. During hot work, the safety management personnel of the construction party shall supervise the use of fire at the hot work site until the end of hot work.

2. Hot work in designated area; The construction site is equipped with fire extinguishers and other related fire-fighting equipment, and the fire extinguishers must be in a complete and effective state; Take measures to prevent solvents, dust and raw materials in the workplace from burning and exploding.

3. The gas welding equipment, hoses, gas valves, pressure gauges and cutters shall be kept in good working condition without air leakage.

You need to wear relevant protective equipment (such as protective glasses, etc.). ) during the operation. If you don't wear protective equipment, the construction is unsafe. Once found,

Immediately punish the company to which this person belongs, with a penalty amount of 1000 yuan (inclusive) or more.

Six, to prevent falling:

1. If objects may fall and scatter during operation, appropriate safety helmets and other protective devices shall be provided. When the working height exceeds 2m, protective railings or shields should be set, and safety helmets and safety belts should be worn. If Party A finds that the construction worker is not wearing a safety helmet or a safety belt, it is willing to accept Party A's fine: the first fine is more than 65,438 yuan+0,000 yuan/person, and the second construction permit is confiscated, and this person is not allowed to enter the factory for construction.

2. Set fences or ropes in the dangerous areas around the civil construction site, prohibit irrelevant personnel from entering and leaving, and set warning signs. If it is not set in place according to the specifications, it will be fined more than 1 1,000 (inclusive)/time, and construction can only be started after rectification is in place.

3. Put an end to throwing tools or sporadic materials at heights.

4 construction scaffolding and civil construction scaffolding shall be implemented in accordance with the standards for building safety and health facilities.

5. The protective work for aerial work should be fully prepared, and the construction personnel should wear protective articles (such as safety belts and helmets) correctly; Climbers need to use complete climbing tools (such as ramps, etc.) ), at the same time, there are people watching below. Put an end to walking freely on climbing objects without handrails in the air; Don't walk directly in the lighting zone. Those who do not conform to the specifications will be fined 1000 yuan (inclusive) or more/time.

Seven, to prevent falling handling measures:

1. When working in corrosive or prickly environment, prepare gloves, safety shoes, safety helmet or mask for operators.

2. Appropriate tools should be used when handling, and the wire rope should not be overloaded. Except those who need to wear safety helmets, personnel are prohibited from entering under the hanging objects and cranes.

3. When handling huge objects, appoint an experienced person as the commander.

Eight, the construction site needs safe electricity.

1. When using temporary power supply for operation, Party A's consent must be obtained before construction, and the power supply shall not be connected without consent.

2. Professional electricians (with certificates) are responsible for all temporary electricity consumption on site, and other personnel are forbidden to connect to the power supply.

3. The construction site is equipped with qualified and safe special power distribution cabinets.

4. Temporary electricity utilization, protected by air switch, shall be inspected and maintained by professional electricians, and shall not be connected with plucked flowers and copper core wires in disorder.

5. All plugs should be kept in good condition, and electrical switches should be used for various purposes. It is not allowed to connect electricity directly with unplugged power cord.

6. Construction machinery and electrical equipment and construction metal platform have reliable grounding.

7. When the electrical circuit is overhauled, hang a warning sign "No power transmission" on the power switch.

8. When handling or using iron parts, be careful not to touch electrical equipment.

9. During spot welding, the grounding wire of electric welding machine shall not be hooked on the electric pipeline at will.

10. Do not touch or switch high-voltage switches and equipment without the consent of Party A's power supervisor.

1 1. Once the above items are found, the construction unit will be punished immediately, and the fine amount will be 1000 yuan (inclusive) or more.

Nine, accident disaster treatment:

In case of accidents and disasters during construction, in addition to on-site emergency treatment, immediately report to Party A's engineering supervisor or on-site supervisor to assist in taking effective measures.

Ten, the construction site health

The sanitation of the construction site shall be kept clean, the equipment and materials on the construction site shall be maintained and sheltered, and the sanitation of the construction site shall be cleaned in time. If the on-site sanitation fails to meet the requirements of Party A, it is willing to accept a fine of RMB 1000 (inclusive) or more, and immediately rectify it in place. XI。 Other safety matters:

1. Work in a limited space, wear protective equipment, and have special care.

2. Large and medium-sized construction machinery (lifting, transportation and rolling, etc.). ) should be commanded by full-time personnel. Cranes, scaffolding,

Seat belts and other related supporting tools, according to the needs of the project, prepare complete and safe tools for standby.

3. Fully cooperate with relevant units of Party A to hold "Engineering Safety Meeting".

4. The bookkeeper promises to be responsible for publicizing the relevant safety and health requirements of this commitment to his subordinate construction personnel, and is willing to accept the inspection and supervision of Party A's on-site supervisors and safety and health personnel. In case of violation of relevant regulations, he is willing to accept corresponding punishment.

5. The author promises to assign a qualified supervisor with rich engineering experience to the construction site to supervise and manage the construction and demand quality. Party A is only responsible for the final quality acceptance of this project. However, during the construction period, Party A shall send people to the site to coordinate the progress of the project, and the contractor shall take full responsibility for the safety of the project during the construction period.

Organizer (seal):

Legal representative:

Address:

Date of Contract: Year Month Day

sun

Letter of Commitment for Construction as per Drawings Part II: Letter of Commitment for Quality of Drawing Examiners and Progress

Commitment letter of lifelong responsibility system for quality of construction drawing review institution

This unit and the main person in charge of this project promise to earnestly perform the following corresponding responsibilities during the construction of this project, and undertake lifelong quality responsibility according to law:

(1) Sign a contract (agreement) for entrusted inspection of construction drawings in accordance with the law, carry out inspection of construction drawings in strict accordance with the categories and scope of recognized inspection institutions, and shall not go beyond or beyond the scope of inspection or undertake inspection business in the name of other inspection institutions, and shall not allow other units or individuals to undertake inspection business in the name of their own units, accept entrusted inspection business that has affiliation or other interests with the construction unit, survey and design enterprise of the audited project, and shall not use inspectors who are not recognized or do not meet the relevant conditions or are audited.

(2) Conduct policy review and technical review in strict accordance with relevant regulations to ensure that qualified construction drawings meet the mandatory standards for engineering construction, the foundation and main structure are designed safely, and that survey and design enterprises, registered practitioners and relevant personnel have stamped corresponding seals and signatures on the construction drawings in accordance with regulations, and meet the requirements of relevant laws, regulations and rules.

(3) Truthfully inform the relevant units of the problems found in the review that the construction units, survey and design enterprises and registered practitioners violate laws, regulations and mandatory standards for engineering construction, and if the relevant responsible units fail to rectify after putting forward the problems, report to the construction administrative department.

Doors.

(4) The examination records of professional examiners are complete, and the procedures for signing and sealing the examination report issued by them are perfect. Inspection records, certificates of conformity, complete sets of construction drawings and other relevant materials shall be filed in time and kept for a long time. Complete the entrusted review project within the specified time limit, and provide the required number of construction drawings stamped with the special seal for construction drawing review in a timely manner.

(five) establish and improve the internal technical management and quality management system and related management system, strengthen self-discipline, conscientiously perform the review duties, and shall not issue false review reports, and shall not issue construction drawing review qualified reports for construction projects with super-scale and super-standard design.

(six) timely review the construction drawing design documents proposed by the construction unit and affix the special seal for construction drawing review.

(seven) the quality responsibilities and obligations stipulated by other laws and regulations.

(official seal of the company) Signature of legal representative:

Date, year and month

Letter of Commitment for Drawing Construction Part III: Letter of Commitment for Consistency between Construction Drawing and Design Drawing

Commitment letter of consistency between construction drawing and design drawing

Qingdao Jimo Construction Engineering Construction Drawing Design Review Center:

Entrusted by the construction unit, our unit has completed the construction drawing design of (project name), and can submit the construction drawing design review and go through relevant formalities. In view of this project, our company issued a set of construction drawing design drawings according to the examination and approval opinions of the competent planning department (one of which was submitted to your company and the other to our company for the record). My unit and the construction unit * * * promise the consistency of each set of construction drawing design drawings, and * * * bear the relevant responsibilities caused by the inconsistency of construction drawing design drawings.

Legal representative of design unit (signature or seal):

Year, month and day (with the official seal of the design unit):

Legal representative of the construction unit (signature or seal):

Year, month and day (with official seal of the construction unit)

;