What is the content of the security team meeting?
2. Fighting and swearing at the construction site are strictly prohibited.
3. You must wear safety helmet when entering the construction site. It is forbidden to wear slippers and high heels into the construction site.
4, high-risk operations must wear a seat belt.
5. Do a good job in limb protection.
6. Strengthen safety awareness and obey management.
7, security risks reported in time, the project construction in strict accordance with the standards of civilization and courtesy.
8, it is forbidden to pull the wire without authorization.
9, strict mechanical operation procedures using construction machinery, regular maintenance of construction machinery.
Minutes of safety team meeting (II):
Meeting time: noon on xx, xx, xx.
Meeting place: xx
Moderator record
Attendant: xx
Meeting materials:
The meeting was chaired by * * *. According to the spirit of the regular meeting of cadres held by the general manager and some phenomena found in the recent supervision and inspection work, new arrangements have been made for the next step.
1, safety supervision and inspection. From once a month to twice a month, the main participants, safety officers and principals give rectification instructions according to the inspection situation; Hold a regular safety meeting at the end of each month to report the recent safety work.
2. Safety inspection system. On-site inspectors, safety officers, management personnel, etc. All parts shall be inspected and registered according to the system. The frequency of inspection is low, and those who do not follow the system will be punished according to relevant regulations; The rolling mill added a record book to the thin oil station, and the personnel checked and registered properly.
3. Factory vehicle management. At present, our company has many vehicles, such as forklifts, transport vehicles, forklifts, excavators, commercial vehicles and so on. Therefore, it is necessary to strengthen the supervision and management of on-site personnel, especially construction vehicles. If there is any violation of regulations on the construction site, it must be stopped or notified to the security department for handling.
4. Pre-job training for safety leaders and special operators should be set up in different regions. Special steel and high-speed wire rod will be put into production soon, and it is necessary to set up part-time safety leaders in various regions at this moment; The safety operation procedures of each post should be compiled into a book, and employees should be trained in a targeted manner.
5, homework ticket use. At present, there are many aerial work, hot work and confined space work, but the use of individual work tickets is not in place. People at all levels sign the working ticket, which also informs you to check its preventive measures and arrange personnel to check and assist, and also reflects the importance attached to safety. If the next inspection finds that the operation ticket has not been handled, it will be punished according to the regulations, and if the illegal operation is found, the punishment will be doubled.
6. Safety signs on the project wall. At present, the high-speed wire has been partially completed, so it should be used as soon as possible after completion, especially in gas stations, power distribution rooms, operation desks and other parts, and it should be tested immediately to serve as a warning to operators and outsiders; Some special steel safety signs should be made after collection; The marking of new factory buildings must be carried out in accordance with the laws and regulations promulgated by the state.
7. Smoking is strictly prohibited. At this moment, personnel have been arranged to conduct inspections every day, and random surprise inspections will be conducted at night. If anyone is found smoking at the scene, it will be handled according to the regulations. No matter what the site is, everyone should be informed in place, including our employees and foreign construction teams.
8, lightning protection self-inspection. Each factory uses the button table to conduct self-inspection on the grounding of gas station and power distribution room to see whether the grounding meets the requirements; At present, in order to reduce the damage of lightning and static electricity to electrical appliances or lines, some units have installed surge devices in dangerous parts such as gas stations to prevent damage. Let's see if we should install them.
9. Summer is coming, so we should do a good job in heatstroke prevention and gutter cleaning. Measures such as increasing part of cooling water for employees; Some equipment should be checked; The driving temperature is high, so it is necessary to check and maintain the air conditioner and urge the new driving air conditioner on the project. Before the rainy season comes, it is necessary to clean the gutter and the sink on the top of the workshop, repair the damaged downspout, and prevent rainwater from recharging or getting wet. The low-lying temporary lines of the construction team of this project should be cleaned up to prevent accidents.
10, traffic safety. Some new employees have entered the project one after another, emphasizing good traffic safety. At the same time, we should make a good receipt at this moment, so that they can form good habits from the beginning.
Report to * * * General Manager for endorsement.
- Previous article:Wang's main deeds
- Next article:What are the books about the history of Heyang?
- Related articles
- How to inquire about the subsidiaries of listed companies?
- A classic speech on national security
- The final exam (Chinese) of the first volume of the fifth grade.
- Slogans about caring for nature
- Spring Festival group worship speech
- Kindergarten food safety knowledge training content
- The Main Content and Essence of Yan 'an Spirit
- What are the words that begin with the word "Hang"?
- Six abilities and basic test sites of Chinese syllabus
- When will Xiuda Expressway open to traffic?