Responsibilities of the foreman of the engineering department

Responsibilities of the foreman of the engineering department

Refers to the job requirements and the scope of responsibility. A position is established by an organization to complete a task, and consists of work type, position, professional title and grade content. Responsibility is the unity of duty and responsibility, which consists of two parts: the scope of authorization and the corresponding responsibility. The following are the job responsibilities of the foreman of the Works Section, please refer to them!

Job responsibilities of project foreman 1 1. Each foreman is directly responsible for the organization and coordination of construction machinery, field capacity and labor force in this major.

2. Responsible for the construction organization and management of related disciplines; Supervise the effective implementation of the construction progress plan.

3. Work out the construction plan of this major and the application plan of the materials needed for the project in conjunction with the relevant personnel of the technical department; The quantity of applied materials shall not be roughly estimated and calculated, so as to accurately and reduce unnecessary expenses and losses to the project.

4. Responsible for the formulation of fixed procurement measures, rational use of materials and material saving measures.

5. Conduct technical, quality, planning, civilized construction, occupational health, safety production and environmental protection disclosure for the team, and follow up and check the implementation; Supervise the team to carry out "three inspection activities", keep records of activities, solve problems in time when they are found, and keep construction logs.

6. Be responsible for the implementation, execution and enforcement of quality protection of finished products on site.

7. Assist the budgeter to prepare the professional engineering budget (settlement).

8. Responsible for the acceptance of professional building materials and equipment.

9. Strengthen safety management and have the right to stop illegal operations and refuse orders for illegal operations.

10. Work contents and production tasks must be changed and arranged according to effective construction drawings and designs.

1 1. Responsible for reviewing and signing the quantities completed by the construction team.

12. Be responsible for the on-site technical review, complete the inspection of various sub-projects, and be responsible for the accuracy, completeness and traceability of the handover data after project completion.

13. Strengthen the plane layout and reasonable stacking of professional materials to prevent damage and waste caused by unreasonable stacking and affect the appearance of the field.

14. Strengthen site capacity management, urge shift workers to clean up the site after completion, and do not waste materials. Always check the operating platform, operating frame and other tools used by construction workers to eliminate potential safety hazards.

15. Be responsible for the measurement work of this major and the management of measuring instruments.

16. Responsible for temporary water use and fire fighting on site.

17. Be directly responsible for the safety production, quality, progress and civilized construction of subordinates.

18. Be responsible for the joint review, negotiation and change of professional drawings, and the filling and declaration of professional technical data.

19. Participate in the evaluation of the project integrated management system, correct the existing problems in time, identify, evaluate and update the environmental factors, risk factors and major risk factors of the project construction, and check and record its operation process.

20. Seriously complete other tasks assigned by superior leaders and lead employees to implement various rules and regulations of the project.

Job responsibilities of the foreman in the 2nd construction section 1. Familiar with construction management, safe and civilized construction, quality, technical specifications, project management regulations and various laws and regulations.

2. Be familiar with and strictly implement the drawings negotiation, technical requirements and project management regulations, manage professional construction subcontracting, and conduct process supervision and inspection and acceptance management for the corresponding construction to achieve the planned objectives of the project.

3. Complete daily diaries, disclosures and other information in the industry, and ensure that they are timely, complete and effective and meet the requirements.

4. Be responsible for the safe and civilized construction, quality, technology and schedule management related to the concrete construction area and concrete construction.

5, responsible for the management of professional construction materials.

6. Solve all kinds of problems in the construction of the discipline, and report them in time if they are beyond the scope of authority.

7. Master the sub-suppliers of the managed specialty, organize the sub-supplier management personnel to conduct business management evaluation and evaluate the work quality of the sub-suppliers.

8. Complete the tasks assigned by the leaders temporarily.

9. Report the extra expenses incurred in the construction process to the site manager in time and provide relevant information;

10, responsible for collecting photos of image progress related to his major;

1 1, you can only apply for concrete after receiving the concrete pouring order issued by the site manager.

Job responsibilities of the foreman in the 3rd construction section 1. Preside over regular departmental meetings and attend relevant meetings.

2. Preside over the production line of this workshop before or after work, make decisions on the problems existing in the workshop, formulate improvement measures and implement them.

3. Correctly convey the instructions of superiors.

4. Organize the implementation of production tasks according to the production indicators issued by the workshop.

5. Tasks assigned to subordinates.

6. Conduct on-site command according to production needs.

7. Report the real situation to the superior.

8. Report the production completion to the superior, including daily and monthly balanced production and quality indicators.

9. According to the instructions of the workshop, set the production target of workshop output and quality.

10. Work out the job descriptions of subordinates and define their jobs.

1 1. Coordinate with relevant departments.

12. Work with relevant departments to define work according to procedures.

13. Authorization to subordinates.

14. patrol, supervise and inspect the production line of this department.

15. Receive work reports from subordinates on a regular basis and evaluate their work.

16. Make the work plan of workshop department and approve its implementation.

17. Know the production situation and the figures of product man-hour utilization rate, quality and output.

18. Deploy production line operators according to work needs.

19. Responsible for organizing the "post professional ethics" education for workshop employees.

20. Responsible for completing the output and quality indicators issued by superiors.

;