Summary of the final work of the year of chief engineer
In the third spring, the golden age began, and ten thousand horses rushed into Xiongguan. AVIC Great Wall Dadi Construction Engineering Group has ushered in a brand-new beginning.
all the staff of the project department of Yuebei Asia-Pacific Fortune Center have completed the construction of the temporary facilities of the project department of 6, square meters through more than three months of hard work since they entered the site on October 8, 2xx. 52 rotary excavation piles in Building AB of Furong Yuyuan 4# plot; The construction pile is 1352.96 meters long and 23 cubic meters of concrete is poured. Concrete test blocks, steel bars, sand and gravel, cement, additives and other building materials have all been submitted for inspection, and the supervision documents for pile construction are all in place. As the chief engineer of Ganzhou Engineering Company of AVIC Great Wall Dadi Construction Group and the chief engineer of the project technology of the Asia-Pacific Fortune Center in northern Guangdong, I have been strict with myself with the support and help of the unit leaders and colleagues, consciously obeyed the project management, and completed my job well.
(I) construction organization and management
before the project started, the company established the goal of "municipal civilized construction site", and organized the construction in strict accordance with the standards of "excellent model project". In the preparation stage before construction, the project department has compiled CI Planning of the Asia-Pacific Fortune Center in North Guangdong, Overland Planning, Overland Construction Drawing, Construction Organization Design and Special Construction Plan for Sub-division and Sub-division Projects, organized the project department personnel to learn the construction drawings and relevant specifications and standards, strengthened the awareness of quality, safety and civilized construction, and implemented a quality and safety team composed of project leaders and members of the project department. Before the relevant teams and groups enter the site, organize them to seriously study the construction technology and safety knowledge of rotary excavators, so that everyone can firmly establish the management thinking of "quality is life and safety is benefit", strictly implement the rules and regulations of the company and its superiors and the quality and safety policies, implement the three-level management system of the company, project department and grass-roots management, rectify problems in time when found, and nip accidents in the bud.
(II) Construction technology and quality management
1. Be familiar with drawings, organize drawing pre-examination, participate in the blue prints.the design, and solve the problems between design and construction in time.
2. Prepare the construction organization design and construction scheme and submit them to the supervisor for approval.
3. According to the coordinates of pile foundation, directly use GPS measuring instrument to determine the pile position, nail it with short steel bars, and arrange four control points around it, so as to check the pile position at any time.
4. Formulate quality management system and guarantee measures.
5. In terms of engineering quality management, we will strictly follow the standards, implement the provisions and regulations of the specifications, and construct according to the requirements of design drawings and supervision. Before starting work, the team members shall be given a comprehensive technical safety disclosure in the form of pre-shift meeting. In the process of construction, the special quality controller of the project department will supervise the operation. After the construction of each sub-project is completed, the project department will organize personnel to conduct self-inspection, and the next working procedure can be carried out only after it meets the requirements. The sequence is: preparation before construction → hole-forming quality inspection → reinforcement cage inspection → concrete pouring quality control → safety inspection → completion data management and acceptance.
6. After the concealed works are completed, the construction of the next working procedure can only be carried out after the supervision unit has passed the acceptance.
7. The project department will strengthen the management of acceptance of raw materials in the site. All raw materials in the site will be witnessed by the supervisor, sampled and re-examined, and the raw materials that have not been re-examined will be isolated and identified, and can only be used after passing the re-examination.
8, in strict accordance with the provisions of the concrete specimens, steel welded specimens and other inspection work, to ensure that the work
process has a reliable and true quality assurance.
9, the actual operation of the project, in strict accordance with the requirements of the special scheme construction, so as to ensure the engineering quality.
1. Cooperate with supervision unit, owner, design unit and other departments to handle the problems in the project through consultation to ensure the smooth construction of the project.
(3) progress target management
according to the construction organization and deployment, combined with the general situation of the project, construction methods and resource allocation, the general progress plan of the project is compiled.
schedule control is an important guarantee to achieve all the goals. By decomposing the total construction period, defining the control points of the construction period and the start time of each division and sub-project, selecting scientific and reasonable construction methods, allocating reasonable and effective resources, strengthening the coordination and management of the general contractor of the subcontracting team, formulating strong time guarantee measures, and monitoring the whole process of the construction progress to ensure the realization of the total schedule.
according to the characteristics, the project department will organize the construction according to the plans in the proposed construction organization design and construction scheme, in order to ensure the high-quality and efficient completion of the project. The demand for labor is large, and the project department will properly arrange and reasonably coordinate the flowing water construction between different labors.
(4) Safety and civilized construction management
In terms of safety management, according to the characteristics of this project, new workers are given safety education in strict accordance with the special safety construction plan during the construction process, safety technical disclosure and construction site inspection are strengthened, and safety supervisors conduct safety supervision and inspection, check and implement various safety facilities, improve the safety awareness of operation teams, and make rectification in strict accordance with the relevant provisions of safety inspection and grading standards. The safety officer shall follow up the construction electricity and construction machines and tools on the site to ensure that all safety facilities on the site meet the requirements.
in terms of civilized construction, the layout shall be carried out in strict accordance with the approved general layout of the site, the material classification rules
shall be neatly stacked, the fire-fighting facilities shall be configured, all kinds of identification signs shall be complete and in place, the safety publicity columns shall be rich and varied, and the contents shall be specific, and the site quality and safety publicity slogans shall be prominently hung. Full-time personnel on duty are set up around the clock, and personnel and materials are strictly registered in and out to ensure smooth and orderly work.
(5), shortcomings in the construction process
1), quality management
This project is a key project in Shaoguan City, Guangdong Province, and our project department has high requirements for quality objectives and must achieve high-quality products. However, there are some shortcomings in the actual construction process, which are reflected in the following aspects:
1. Some employees in the company have poor ideological quality and weak quality awareness, and the dislocation, offside and absence of construction management are serious.
2. The implementation of the "Three Inspections" system is lacking in the construction process.
3. The technical strength of on-site management personnel should be enhanced and the management level should be improved. All non-drilling rig operations must be carried out under the premise of unified command by one person.
4. The internal coordination meeting should be held persistently: summarize the progress, quality and safety of the construction on the day of the project, arrange the time control of production nodes and the detailed requirements of technical quality on the next day, clarify the construction sequence and handover relationship and quality responsibility of various disciplines, strengthen the coordination, cooperation and handover management of various disciplines, and ensure the smooth progress of the construction.
2) Control of progress
1. The internal communication, coordination and cooperation of the operation team are not in place, and there is a slowdown.
2. The project department's management measures for the progress target of the operation team are ineffective and the system is not perfect, which leads to hole drilling every time.
- Previous article:Harbin Software Development Company
- Next article:The expressive effect of different emotions
- Related articles
- What was your first job or part-time experience?
- What is the basic format of copywriting?
- Where are TCL manufacturers?
- What are the hospital signs?
- It took 5 years for a woman to get her driver’s license before she was sent off by all coaches. Do you understand the coach’s behavior?
- Banners and banners prohibiting littering in schools.
- Thank you for the ideas and inspiration of this comic about Fake Illiteracy
- What do you think of OnFire, a basketball APP?
- 60,000 square meters, 18 low-rise building, construction at the same time, need safe and civilized construction supplies.
- 20 15 encyclopedia of international anti-corruption day theme slogan, 20 15 encyclopedia of international anti-corruption day theme slogan.