Joke Collection Website - News headlines - Road safety construction log
Road safety construction log
since 2xx, under the leadership of the construction headquarters and under the guidance of Scientific Outlook on Development, the work of safety in production has conscientiously implemented the spirit of the 18th National Congress of the Communist Party of China, deepened the activities of "Year of Safety in Production" and promoted the implementation of safety development as the main line, focused on "strengthening the safety foundation and promoting safety development" and focused on the implementation of the State Council's "Decision on Further Strengthening Safety in Production". Further combined with the activities of "1-day safety production inspection activities", "preventing collapse, falling and three violations", by focusing on a series of safety production activities, paying attention to practical results, popularizing safety knowledge, promoting safety culture, improving safety awareness and preventive ability, in order to comprehensively improve safety basic work, effectively prevent and resolutely curb serious accidents, we resolutely make our contract section a "safe construction site" as the safety management goal of our contract section, and promote me.
the work of safety production management in xx years is summarized as follows: people are the first factor, so it is necessary to further strengthen safety education, take safety education as a persistent event, cultivate employees' awareness of obeying the law, self-protection and overall situation, and further improve employees' safety technical level and management level. Carry out various, colorful and wide-ranging safety publicity and education activities, so as to achieve practical results, do not go through the motions, make safety work deeply rooted in the hearts of the people, and lay the foundation for the smooth implementation of the project from the quality of personnel. According to the characteristics of the project, geology and geomorphology, local climate, surrounding environment and other specific conditions, as well as the scope and progress of the construction undertaken, the project department listed the risk source identification of blasting engineering, high slope engineering, foundation excavation engineering, bridge engineering (especially bridge engineering in Gao Qiao, long-span, deep water and complex structure), scaffolding engineering, lifting engineering and crossing engineering with railways and highways as major hazards for the construction safety of the project.
the project department shall publicize the major construction safety hazards of the project in a prominent position on the construction site, and the publicity contents shall include the list of major construction safety hazards, possible accident categories, matters needing attention and safeguard measures. Hang warning signs at eye-catching positions at each major hazard source for construction safety. Implement the Law of the People's Republic of China on Work Safety, improve the formulation of the responsibility system for work safety, fully implement the responsibility system for work safety, and sign the responsibility book for work safety objectives at different levels. At the same time, combined with the actual situation, formulate targeted implementation rules to refine and quantify the safety objectives and responsibilities at different levels, and implement them to various functional departments, project departments, teams and groups, important positions and individuals in special positions. Adhere to the principle of "managing production must manage safety", hold regular safety conferences, organize safety inspections, listen to safety production reports, ensure the investment of special funds for safety, and achieve "five simultaneities" between safety work and production tasks.
1. Earnestly implement the new national safety regulations and policies, improve and standardize various safety rules and regulations under the guidance of experts from the "Safe Site" assessment team, make safety work legal and well-founded, adjust the safety management focus according to the construction progress, set up a safety leading group with the project manager as the team leader and the heads of various departments as members, actively meet the safety inspection work of superiors, sum up the shortcomings in various safety work, and make positive improvements.
2. according to the contract documents, improve the staffing of security personnel, strengthen professional study and training, and gradually improve the professional ability and quality of security personnel.
3, resolutely implement the leadership shift system for accident hidden danger rectification. The management shall be carried out step by step, and the leaders in charge shall be responsible for the hidden dangers of accidents in the construction site, and the rectification shall be implemented within a time limit. Hold regular safety production meetings, not less than once a month, safety inspection, not less than once a quarter, comprehensive safety appraisal, clear rewards and punishments, and pay attention to practical results to promote safety work.
managers and constructors who have a weak sense of safety and do not pay attention to safety work should be punished accordingly to ensure the normal operation of the safety management system.
1. Pay attention to safety training and education, organize safety training and education activities, organize managers and constructors to conduct written learning, project safety learning, safety knowledge contest and other activities, enrich safety work, and better achieve the effect of safety publicity.
2. Strengthen the inspection and management of the training, evidence collection and review of the operators of special jobs, and organize the operators of special jobs to be trained with work licenses in batches on a regular basis. It is strictly forbidden to work without a license.
3. Our contract section should make extensive use of various forms of safety education such as billboards and slogans, carry out various publicity and education in depth, organize regular safety knowledge training for all types of workers, and archive publicity and training records in the form of pictures or written materials.
4. Carry out "three-level" safety education for new entrants to the construction site. The forms of education should be varied and practical, and the education records should be made well. Those who pass the examination are allowed to work at their posts.
5. Organize full-time safety management personnel and construction team safety officers to learn the Law of the People's Republic of China on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, so as to enhance the legal concept of safety management and improve safety professional knowledge.
6. Organize full-time safety management personnel and construction team safety officers to visit good safety management experience, and standardize the safety protection on the site based on safety standardization.
strictly implement the "safety inspection" system. Take a combination of regular inspection and inspection and random inspection to implement dynamic management. Strengthen the rectification of hidden dangers and follow-up feedback, and rectify the hidden dangers found according to the principle of "three determinations". Those who fail to pass the re-inspection or two inspections will be punished according to the relevant documents, and the relevant personnel will be held accountable, and forced to stop work and rectify until they are qualified. Anyone who is issued a rectification instruction in the safety inspection of the superior department fails to rectify on schedule or fails to pass the inspection will be fined 3-5 yuan to the relevant construction team and department; Those who are ordered to stop work for rectification will be fined more than 1, yuan to the relevant construction teams and departments, and will be ordered to punish the relevant personnel according to regulations after rectification as scheduled; The penalty will be doubled for the items notified of fines by the superior.
1. Implement the access system for safety protection articles and facilities.
all safety protection articles and facilities entering the construction site of our contract section, including safety nets, safety belts, safety helmets, cables, iron case switch boxes and leakage protectors, must be qualified products in line with relevant national norms and standards.
2. Do a good job in equipment management, acceptance and regular inspection and maintenance.
large and small machinery and equipment entering the construction site shall be subject to the acceptance system, and unqualified machinery shall be prohibited. It is a habit to regularly check the construction equipment, and do a good job in the maintenance and repair of the machinery and equipment to prevent mechanical injuries and casualties.
1. According to the Law of the People's Republic of China on Work Safety, the production and business operation activities of construction units have high risks, and emergency rescue organizations must be established.
The emergency rescue organization is an organization specialized in emergency rescue work within the contract section. Once a production safety accident occurs, the emergency rescue organization can quickly and effectively put into rescue work to prevent the accident from further expanding and minimize casualties and property losses.
2. Establish a leading group for emergency handling of major safety accidents, which is responsible for coordinating and organizing personnel to enter the site in time to handle the accident, control the development of the situation, and minimize the personal injury and property loss.
The contract section will further improve various emergency rescue plans
3. Timely improve emergency plans and emergency rescue plans, organize learning and publicity and emergency drills, and reserve emergency relief materials. The Baotong team of the project department continues to be responsible for the maintenance of the construction access road, leveling the sections with large slope of the construction access road, replacing the weak sections with rubble, and strengthening the landslide sections to ensure unimpeded material supply and traffic safety.
seriously implement the national regulations on safety production management expenses and the regulations and requirements in the documents of the headquarters, strictly review the scope of use of safety production management expenses, rationally use safety production management expenses, and effectively use special funds for special purposes, improve the working environment of operators and avoid safety accidents.
in xx years, as the safety manager of the project, I was fully responsible for the safety management of the project department. Looking back on my work in xx years, although there were some achievements, there were also some shortcomings. Now I will make a brief summary of my work in xx years: in the daily work process, I always insist on taking the spirit of safety documents issued by the company and superior departments as my action guide.
always put safety work first in thought, strictly follow relevant safety production regulations and norms in action, fulfill the duties and obligations of a safety manager, and organize regular safety production meetings.
resolutely obey the arrangement of the project manager at work and do all the work consciously.
on major issues, we adhered to principles, distinguished right from wrong, and performed the duties of a safety manager well. With the full implementation of the spirit and requirements of the documents of the company and the superior departments, the safety and civilized construction work has been significantly improved. Looking back on the work in the past year, we mainly made the following contents: At the beginning of the year, we started with perfecting the responsibility system for safe production and implementing the responsibility for safe production and civilized construction, with clear objectives and strong measures. On the other hand, all the management personnel of the project department and the construction team have formed a management system that communicates with each other from top to bottom. In addition, the project manager and the company attach great importance to the work of safety in production, so as to really grasp early, really grasp, pay close attention to and really grasp.
in order to effectively enhance the awareness of all employees on safe production and civilized construction, according to the actual situation of our construction site, we regularly hold special meetings on traffic safety and safe and civilized construction, and actively publicize safety production slogans and rewards and punishments of civilized construction by means of slogans, banners and blackboard newspapers, and train migrant workers on safe production. Every worker who enters the construction site must pass the three-level education on safe production. Ensure that special operations personnel must hold relevant certificates, strive to improve workers' ability of self-defense and self-rescue, and constantly increase safety production education, so as to further improve the safety awareness of personnel in our project department.
Since the beginning of this year, while strengthening the daily supervision and management, we have carried out a monthly inspection of safety production and civilized construction led by the project manager, and strengthened the follow-up inspection of the implementation of rectification by various construction teams, striving to eliminate hidden dangers of accidents in the bud. Although we have done some work in the management of safety production and civilized construction this year, we have made some achievements and accumulated some experience, but there are still many problems, mainly:
1. The stacking of materials on the construction site is chaotic; The electricity consumption at the construction site is chaotic; The supervision requirements for the construction site are not strict, and the standards are not high. They only want to get by, but not too hard, thus laying a safety hazard;
2. In normal work, I don't have enough enthusiasm for learning professional knowledge, and I don't fully grasp and understand related drawings, documents, construction measures, etc. The new management mode, summing up experience to find shortcomings, focusing on implementation, and striving for better work results.
since October, our project department has entered a comprehensive construction stage, with mechanical mobilization, road surface safety enclosure, xxx semi-closed section road surface milling, patching, xxx fully closed section road surface milling, patching, water-stable paving construction, and special plan reporting. At the same time, according to the relevant documents of the company, the project office and the director's office, and the spirit of the meeting, our project department has strengthened the management of production safety, sorted out and improved the safety information in the construction site while doing the safety work well according to the specification requirements, and constantly improved the standardization construction of safety work. Now the safety work of this month is reported as follows:
1. According to the requirements of the "Measures for the Arrangement and Filing of Safety Production Information in Safe Construction Sites (Trial)", it is supplemented and supplemented. And according to the requirements of the measures, the rules and regulations of the project department and related schemes (Compilation of Safety Management System, Operating Rules for Safety in Production, Resident Construction Scheme of the project department, Traffic Organization Scheme, Safety Organization Scheme, Hazard Identification Registration Account, Temporary Power Utilization Scheme, etc.) shall be reported to the Director's Office for review and filing.
2. This month, the project department planed and repaired the xxx diseased road surface, the xxx pavement disease planed and repaired the road surface in the fully enclosed section, and the water-stabilized paving construction started at the same time, and the safety management work increased accordingly. While increasing the investment in safety materials, personnel and equipment, the project department increased the safety education and training and safety inspection and rectification efforts of the project department personnel and various construction teams, timely rectified the potential safety hazards when found, and kept the image data.
3. according to the needs of construction progress, coordinate and dispatch machinery and equipment in time, and do a good job in the safe enclosure and care of the construction site and parked machinery.
4. Strengthen the 24-hour care and inspection of xxx semi-closed section and xxx fully closed section, and rationally allocate personnel and materials to ensure the safety of construction, mechanical parking and care in the construction area.
5. For the safety enclosure of the construction area, while meeting the requirements of the Traffic Organization Plan, safety signs and full-time security personnel are added to ensure the construction safety, smooth traffic and the safety of passers-by to the maximum extent.
6. While carefully publicizing all kinds of safety documents issued by the company and its superiors, formulate and report corresponding plans (Implementation Plan for 1-day Attacks on Safety in Production, Emergency Plan for Flood Control, Implementation Plan for "Two Guarantees and Two Trees" and Work Plan for Prevention and Control of Dust Pollution) according to the requirements of the documents. Three regular safety meetings (dates), three safety trainings (dates), and safety trainings for mechanical operators; Date: Water-stabilized, asphalt construction team safety technical training)
7. Conduct regular safety inspections on the project department, the dormitory living area of the mixing station and the key monitoring parts of the construction site, and issue safety rectification books twice this month (cleaning the construction team and paving the asphalt with water-stabilized construction team), and the qualified rate of rectification is 1%.
8. "One post with two responsibilities" not only strengthens relevant education at the safety meeting of the project department, but also regularly checks the implementation of "pre-shift meeting" at the mixing station, laboratory and construction site to ensure that the safety work is deeply rooted in people's hearts and implemented.
according to the requirements of the safety work plan of the project department in October, xxx, the full-time safety officer of our project department, contacted xxx, the on-site safety supervisor of the director's office, to conduct a fire drill for the construction workers (explanation of fire fighting knowledge, use method of fire extinguishers, matters needing attention and on-site fire drill). Fire extinguishers in the office area of the project department and the water-stabilized mixing station have been placed according to the requirements, and they have been inspected regularly, and patrol records have been made.
1. It is difficult to take care of the intersections at both ends of the xxx fully enclosed section
2. Now the construction operation faces are being carried out one after another, and the safety inspection of safety nurses and the self-protection awareness of construction workers need to be further strengthened.
3. Communicate the spirit of the safety meeting of the company and the superior in time, formulate relevant safety measures and schemes according to the requirements of the meeting, and make a detailed analysis of the contents of the meeting.
- Previous article:Saint Laurent advertising language 2023
- Next article:Three working law slogans
- Related articles
- A short story that happened during the epidemic
- Learn the excellent model essay delivered by the host of the theme class meeting.
- Slogan of waste classification in Taizhou community
- How to write the development history of the industry
- What are the recreational activities with local ethnic characteristics when traveling to Yunnan?
- Who is in charge of the wind power generation project in Lixian ancient city?
- What about Linyi Standard Textile Trading Co., Ltd.?
- Publicity slogan of dormitory safety and hygiene
- Cooling temperatures + precipitation + strong winds, the cold wave is taking off. Which groups of people need special attention?
- Four major steel mills in China in 1980s.