Model essay on librarian's year-end personal work summary

Summary is a written material to review and analyze the performance of study, work and life in a certain period. Do you know how to write a summary? The following is a summary of the librarian's personal work at the end of the year, which I compiled for you. I hope it will help you!

Documentary year-end personal work summary 1

Time flies. It's my second year as a documenter in the project department.

On the project, my main job is to collect, sort out and manage the project data and communicate with the company, the supervision unit, the old city reconstruction office and the subcontractors in time, seriously deal with the change negotiation in the construction process, the supervision notice reply and other related information inspection, send and receive the contact list of the supervision and its subcontractors, and manage the project atlas and standard issuance. Cooperate with project department, supervisor and subcontractor as much as possible, and provide them with the information needed to do a good job. Now I will make the following report on my personal year-end summary, and hope that all leaders and colleagues will put forward valuable opinions and suggestions.

Summary of work situation

1, work

(1) Organize the complete on-site information in time, collect and save the documents and meeting documents issued by the company and relevant departments, and put the documents that have not been specifically organized into folders according to the categories, so as to facilitate everyone to consult the documents; Do a good job in the distribution, circulation and transmission of all kinds of documents and drawings, do a good job in filing original documents, and do a good job in reviewing and filing data in time; Documents are distributed, circulated and transmitted by relevant departments, and the receiving department signs the original documents for confirmation, files the original documents, and makes a registration form for borrowing materials to urge borrowers to return the materials.

(2) Under the guidance of _ manager, verify the integrity of the engineering data, supplement, cut and fold the files with folds, damages and unevenness to keep them as unified as possible, classify the files according to the content characteristics of the data, bind the data belonging to the same volume in a file box and put them in the cabinet for safekeeping, and check the files regularly to trace the missing files to find out the reasons.

(3) Responsible for timely handling the relationship and coordination between the project department and the old city reconstruction office, and submitting materials for approval.

(4) Responsible for meeting minutes of the project department, writing meeting minutes, inputting documents, filing drawings and contracts, and answering the phone in the office.

2. Ideological aspect

Because the work of the librarian itself is more complicated, I have been dealing with things encountered in my work with a positive attitude since I joined the company. Although I occasionally have emotional problems, I can quickly handle my own problems, actively engage in my work, and treat every job correctly and seriously. Seriously study the company's rules and regulations, seriously abide by labor discipline, ensure attendance on time, and ensure that the work can be completed on time.

3. Existing shortcomings and future work direction.

Although I used to work as an information officer in a real estate company, I didn't graduate from civil engineering, so I didn't know everything systematically, and some things were still being explored gradually, so there were some details, such as writing meeting minutes and filing documents, which needed further study and improvement, especially the understanding of drawings.

In the future, I will make up for the shortcomings in my work, improve my working methods, improve my working efficiency, learn more and ask more questions, and really improve my working ability. And in the process of work, strengthen theoretical study, strive to make ideological awareness and work efficiency enter a new level in an all-round way, and contribute to the future of _ _.

Since I joined the company, I have been responsible for the data collation, collection and management of Qiao Lin community affordable housing project. The project data truly reflects the construction achievements of the project. In line with the principle of "all working materials come first", in strict accordance with national standards and regulations, actively cooperate with relevant departments and responsible persons, and timely sort out and improve various materials with the construction progress. My main work and summary are as follows:

1. Cooperate with professional engineers to strictly control the engineering data of the construction unit. Data are various forms of information records formed in the process of engineering construction. Only by fully cooperating with professional engineers, construction unit librarians and supervision units can this work be completed and done well. The arrangement and collection of data is a process of gradual accumulation. Ensure the truthfulness and completeness of the data, and provide timely, effective and applicable data for project acceptance.

2. Accumulate, group papers and file the documents formed in the previous geological survey and construction drawing design.

3, responsible for the construction site meeting records, do real and effective records, sort out the meeting minutes, signed by the participating units.

4. Responsible for sending and receiving documents, letters and construction drawings between the engineering department and all contractors, and keeping records and filing.

5. Be responsible for shooting, sorting and archiving the image data of important construction parts of the project. For future reference and project settlement.

The above is my main work in the engineering department for nearly half a year, but there are also some shortcomings:

There is a certain slack in the supervision of the construction unit's application for inspection of engineering data. At the initial stage of construction, the construction unit does not pay attention to the compilation of engineering data, and often reports the engineering data after the completion of a sub-project construction, which leads to delay and lag. Engineering data should be collected, sorted and handed over according to regulations with the construction progress. In the future work, I will strictly require the construction unit to do a good job in compiling and submitting the engineering data to ensure the truthfulness, effectiveness and completeness of the engineering data, and lay the foundation for the smooth acceptance of the project.

Work plan for 20__ years:

1. The project will enter the stage of foundation and main body construction. There are many construction teams and projects, and the technical data involved are complex, which is also a test for my working ability. I will, as always, earnestly perform my duties. Strengthen the supervision of civil engineering, installation and safety data of all construction units, and consult them regularly to ensure that the technical data are timely and complete and meet the acceptance requirements of quality inspection stations.

2. Seriously receive, record and archive all important documents and letters in the construction process.

3. Assist various professional engineers in the engineering department to do a good job of sorting and filing all construction materials.

I feel very lucky and proud to be able to participate in the construction of community living security housing in Qiao Lin, a project with large scale, many construction projects and complete supporting facilities. Compared with other colleagues, my strength is insignificant. I hope leaders and colleagues will criticize and correct my shortcomings in future work. I will sum up the shortcomings of the past, continue to work hard and contribute my meager strength to the construction of the company!

Summary of librarian's year-end personal work II

In 20__ _ _, as an engineering documenter, my main job was to follow Pan Moumou to carry out quality inspection and project acceptance supervision at various construction sites, and at the same time, I was responsible for the data collection, distribution, sorting and archiving of two construction sites in Area A and Area B.

The quality of a project is usually measured by the reflection of the engineering entity, but the engineering data is also an extremely important link. Through specific and detailed information, we can reflect the advantages and disadvantages of materials used in the project, the handover situation between processes, the construction situation of the project and so on. Therefore, supervision librarians play an important role in supervision work. As the supervisor of the company, we should be strict with ourselves, take good care of the pass, do a good job in collecting, reviewing and sorting out information, and make due contributions to the development of the company.

According to many years' experience in librarian work, I think and summarize the work of librarians as follows:

First, strengthen information management.

Doing well in data management is a necessary condition for doing well in data management. Because the project construction supervision data is composed of records recorded by the project supervision organization in the process of supervising the project, it is a comprehensive and true reflection of the project construction process and plays an important role in controlling the quality of the project construction. Therefore, if the data can't meet the work requirements, the quality of the engineering entity is virtual.

Therefore, we should attach importance to the management of data ideologically, adhere to the principle of data first, and strive to achieve "data pre-control project quality"

Second, master the scope and data of engineering data collection in each stage.

Third, strengthen the effective connection between information and websites.

Four, strengthen communication and contact with the owner and the construction unit, with the necessary coordination potential.

Fifth, we should strengthen our study.

Summary of librarian's year-end personal work 3

20__ years have come, and a new year has come. To sum up, in the past six months, my own work has been familiar and improved to varying degrees from taking over the management and supervision materials.

In July, 20__, I served as the documenter of _ _ Community, and took over the data management of Building 5#6#7#8# of _ _ Community from the former documenter. In the construction stage, I supervise and inspect the formation, accumulation, volume and filing of the data of the First Bureau, the Eighth Bureau and the subcontracted projects to make the construction data complete and accurate and meet the relevant requirements.

In September, 20, 2000, the subcontracted engineering data and supervision data successfully passed the pre-acceptance and acceptance of files, reached the qualified standard, and also passed the acceptance of quality inspection stations. The smooth acceptance of the data laid the foundation for the smooth completion and acceptance of the project. The smooth passage of data benefited from the full cooperation of all construction units, and achieved certain results, but there are also some shortcomings.

During the six months in the supervision department, I did my duty, whether from the supervision and inspection of the construction materials of various construction units or from the supervision materials of the supervision department. As a supervision documenter, my main work is as follows:

1, cooperate with professional supervision engineers to strictly control the engineering data of each construction unit. Because engineering data is a true reflection of the achievements of engineering construction, data is a record of all kinds of information formed in the process of engineering construction. Only the supervision engineer and the construction unit librarians fully cooperate can this work be completed and done well.

2, responsible for the management of supervision data, and supervision data collection, sorting and archiving. Supervision data is a real record of supervision work in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal supervision work. Supervision data reflects the level of supervision work and is an important basis for measuring and evaluating supervision work.

3, according to the contract, in the survey and design stage, the formation, accumulation, composition and filing of survey and design documents.

4. Writing meeting minutes and monthly supervision report is the summary of the project progress and supervision work by the supervision department within one month, and it is also an important basis for the relevant departments to check and evaluate the work of the supervision department. Therefore, it is very important and crucial to do this work well.

5, according to the data specification will be included in the scope of supervision of urban construction archives data handed over to the urban construction archives. Only when all the previous links are done well can the files be handed over smoothly and the supervision work be completed smoothly.

The completion of the above work also has many shortcomings:

(1) First of all, there is a certain slack in checking the engineering data of the construction unit, and often the construction unit reports the engineering data to the supervision department after the construction is completed. Engineering data should be collected, sorted and handed over as required with the progress of the project.

(2) There are still some shortcomings in supervising and managing the construction unit to make the engineering data true, effective and complete. Among them, the construction unit did not pay attention to the compilation of engineering data and did not use engineering data software to make engineering data, which led to the inability to manage the data in a unified way.

(3) The monthly supervision report is incomplete, and the construction unit can cooperate with the supervision in time at the beginning. When the project draws to a close, it will start to delay, resulting in the inability to collect and prepare monthly supervision reports in time. Compiling a complete monthly supervision report requires the full cooperation of all parties.

The above are the problems I have encountered in the supervision department for half a year, and they are also the shortcomings in my work. As a professional information manager, I have been tempered in long-term work practice, and I can skillfully manage construction materials, supervision materials and construction materials. Although I have been engaged in data management for four years, I still have some experience in different kinds of data management. However, there is still a certain gap in being a professional librarian. Facing the upcoming new construction period, I will make every effort to do a good job in data management.

Here, I also want to give some advice to the regulatory authorities. Since taking over the supervision materials, the company has no leadership of management librarians, lack of formal reference rooms, and a lot of materials have nowhere to pile up, which makes a lot of materials lost. The formation and management of engineering data need a long process, and the personnel who manage the data change frequently, which makes it difficult for the next person to do a good job in management. It hasn't been 20 years since the supervisor spoke, and a new year is coming. To sum up, my own work in the past six months has been familiar with and improved to varying degrees in taking over supervision information.

Summary of librarian's year-end personal work 4

How time flies! It's the end of the year. Looking back on the past, summing up experience, finding out shortcomings, enriching your attitude, always pushing yourself, working hard, being practical, working without regrets, never shirking, being strict with yourself, uniting with colleagues, setting an example, making full use of strengths and avoiding weaknesses, and doing a better job. Since I joined Gansu 21st Metallurgical Construction Co., Ltd. in April, I have experienced the dedication and care from the leaders, the diligence and self-discipline from my colleagues, the responsibility and rigor in my work, and the care and warmth brought by the 21st Metallurgical Family in my life. Busy and full is my deepest experience of this year's work.

Now I will summarize my work in the past year as follows:

Since I joined the company and took over the work as a documenter, under the guidance of Shi Lei, who is in charge of engineering technology, I have been responsible for the data management of buildings 22#, 23#, 24#, 25# and 26# in Zone D of Hengmei Olympic Cannes. I have begun to collect and sort out the engineering data, communicate with Party A and the supervision unit in time, and carefully handle the construction plan, change negotiation, supervision notice reply and other related information for inspection. Cooperate with the work of Party A, the supervisor and all units as much as possible, assist the project management personnel and engineering-related personnel during the construction period, bring them the required information, and do similar work well.

Data work seems simple, but in fact it is trivial and complicated. It is not easy to really do it well. I have been working intensively since I started work in April, because this is the beginning of the main work of buildings 25# and 26#, and both the experimental report and the field construction data have increased greatly. However, I have just entered this new environment and have not fully entered the state. Even in the face of the greatest difficulties, I can't back down. On the basis of grasping all working hours and working hard, I put down my lunch break and then used the evening to race against time. If I don't know this place, I will call a stonemason for advice. After unremitting efforts, I finally fully adapted to this environment and rhythm, and continued to be extremely enthusiastic until the 25#, 26#, 24# and 22# buildings were capped.

My other job is to collect and keep the documents and meeting documents issued by the company and relevant departments, and put the documents that are not specifically classified into folders for easy reference.

Secondly, do a good job in the distribution, circulation and transmission of various documents and drawings, and archive the original documents. According to the regulations of the project department, the documents are distributed, circulated and transmitted by relevant departments, signed and confirmed by the receiving unit or individual, and the original documents are filed.

And be responsible for the custody of engineering data. Verify the integrity of engineering data, and supplement, cut and fold folded, damaged and irregular documents to make them as unified as possible. According to the data regulations, the documents are classified according to the data characteristics, and the data belonging to the same volume are bound in a file box and stored in a cabinet. And regularly check the documents, trace the lost documents and find out the reasons. Engineering data should be carefully filled in, neatly written and neatly bound. At a glance, it is convenient for future investigation and filing.

During this year, I learned a lot of experience and knowledge, and made great progress in communicating with people. At work, I have further improved my work skills by reading more, asking more questions and listening more, which is a big step forward compared with last year.

During this year, through repeated inspection and acceptance by departments at all levels, many problems and low-level mistakes were exposed in my data. This pointed out the direction of improvement for me, and also urged and improved my self-level accordingly. At the same time, it is also necessary to seriously study norms and regulations and related documents, master professional knowledge, improve work potential, strengthen work responsibility, and do all the work in time.

The ancients said, "Only when you save yourself three times a day can you know you have done nothing wrong!" In short, in the future work, I will constantly reflect and study and consolidate on the basis of summing up my own and my predecessors' experience, with a view to making a qualitative leap in my practice level and ensuring my potential for continuous progress to adapt to the development of the times and enterprises.

20__ years is the most brilliant period in my life experience. Thanks to CCTV, MTV, Channel[V] and SMG, and all TV stations and 21st Metallurgical Company for giving me this opportunity to write this year-end report. Thanks to the organizer 21st Metallurgical Company, as well as the promotion companies Pepsi-Cola, Coca-Cola, Ten Coke, Sprite, Fanta, 7-up Company and my agent Gu Weifeng. Thanks to the wily leader who gave me this position, I deeply understood the meaning of "Dapeng has a downwind and flies nine Wan Li in one day". Thanks to the guidance and help of enthusiastic masons, I have made further progress. Thank you, thank you, thank you, thank you for supervising Zhang Xue, so that I won't be lonely on 2 1 Metallurgical Day …

I have supported the 21st Metallurgical Company for quite a long time, so I won't talk about it. It is my greatest wish to be able to stand on the platform of 21st Metallurgical Company and talk about myself on this day. I didn't expect it to come true so soon. I will, as always, try my best to be myself, and I won't do anything illegal, blow up buildings, scold leaders, bully colleagues or call Lao Yang a porter. I will continue to develop morally, intellectually, physically and artistically, and strive to be an excellent project manager.

Of course, studying hard and making progress every day is also my slogan to constantly motivate myself. If I am in a mood, I will come back and publish it. Here, I would also like to express my personal thanks to 21st Metallurgical Group. Thank you for giving me such a good platform. I will continue to support 21st Metallurgical Group and do a good job in publicity. Ok, I will work harder this year and insist on criticism and self-criticism! Your criticism is the source of my motivation!

Summary of librarian's year-end personal work 5

During the 1 year of the hotel supervision department, with the correct guidance of the leaders and the help of my colleagues, I dutifully supervised and inspected the information of the construction unit and the supervision information of the supervision department, and at the same time humbly learned from my colleagues around me in the process of work.

As a _ _ hotel project documenter, my main work is as follows:

1, cooperate with professional supervision engineers to strictly control the engineering data of each construction unit.

Because the engineering data truly reflect the achievements of engineering construction, these data constitute various forms of information records in the process of engineering construction. If the construction unit fails to submit the progress information due to busy work, I will remind it to submit it for approval in time to ensure that the construction information is synchronized with the progress.

2. Be responsible for receiving, counting, registering, distributing, filing and managing all documents of the hotel project.

Classify, register and file the received data in strict accordance with the "Detailed List of Supervision Data Classification of On-site Supervision Institutions of Limited Company". Do a good job of collecting and sorting out information, borrowing from colleagues and checking by leaders, and I can take it out in time. Document distribution is recorded in detail to ensure the traceability of each document. If there is any dispute about the loss of information of the construction unit, the whereabouts can be found in the sending and receiving records. Do a good job in logistics, clean the office early every day, create a good working atmosphere, fill in the barometer, distribute labor insurance supplies in place, and lack timely statistics and supplements for office supplies.

3. Prepare meeting minutes and monthly supervision report.

Meeting minutes and monthly supervision report are the summary of project progress and supervision work, and also the important basis for relevant departments to check and evaluate the work of supervision department. The minutes of the supervision meeting must be true and effective, so I insist on attending the supervision regular meeting and special meeting every week, and prepare the meeting materials in time after the meeting and distribute them to all contractors.

Define the procedures for submitting materials to the construction unit for approval: submit the construction organization design and special construction plan in strict accordance with the principle of scheme first, and organize the construction after approval. During the construction process, the quality inspection lot and hidden acceptance record of each process must be submitted to the supervision department in advance, and submitted to the professional supervision engineer for on-site acceptance on the basis of complete information. The data submission and approval process shall be carried out in strict accordance with the agreement.

According to the contract, the project goal of Hefei Phoenix Hotel is double demonstration sites and amber cups, the apartment building strives for provincial-level quality project "_ _ cups", the hotel project is the key project of Economic Development Zone, and the quality inspection station of Economic Development Zone is the key supervision unit of Hefei. Therefore, various safety and quality inspections of government departments are frequent, so I can bring them in time when I check the information and answer the questions raised by the inspectors. When the information of the construction unit is lost and borrowed from me, I can get it in time. After unremitting efforts, several inspections by government departments have passed smoothly. My personality is 65438+February _ _ inspection at the security checkpoint, which won unanimous praise. I will continue to work hard and make unremitting efforts.

Supervision data is a real record of supervision work in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal supervision work. Supervision data reflects the level of supervision work and is an important basis for measuring and evaluating supervision work. Only when all the links are well done can the supervision work be successfully completed.

There are also many shortcomings in the work process. In the new year, I will sum up myself, consult my colleagues humbly and do a good job in every data management.

Documentary year-end personal work summary model essay related articles:

★ Five Summaries of Librarians' Personal Work

★ Documentary annual work summary model essay

★ Documentary personal work summary (5 selected articles)

★ Documentary personal annual work summary template (5 pieces) 202 1

★ The documentary summarized five essays at the end of the year.

★ Summary of personal work of building librarians

★ Documentary personal annual work summary model essay

★ 5 short articles summarizing the internship work of librarians.

★ Documentary annual work summary 3 articles

★ Summary of Documentary Works 1000 words 5 articles