The reason why I changed careers.
In my last year at school, I'm going to practice. Because I am a junior college student, a central enterprise like China Construction definitely doesn't want me, so my family helped me find a local private enterprise, and the construction site is also local, so I can go home every day, more or less relaxed.
The first construction site is a kindergarten, which is small but close to my home, only 20 minutes' walk. This is my first time to the construction site. I can finally leave school and participate in the construction of a building. It's exciting to think about it. I just arrived at the construction site and saw that the maintenance pile was still being driven. This is all the work of subcontractors, not our general contractor, so I have nothing to do except look at the drawings every day.
So after more than a month (this is the most comfortable period of my whole internship), the maintenance pile was laid, and I began to install the tower crane, which was the beginning of my bad karma. However, the master on this construction site is good to me, and he is willing to teach me everything, first of all, the use of instruments, and then the answers to various construction techniques.
This is the tower crane at that time. Some people may ask, how is the tower crane foundation made into a rectangle? hahaha. This is because my master misread the drawings and deviated the tower crane foundation to the west by a few meters, and then made the correct one. That's it.
The next step is the digging link that everyone hates most, but fortunately the construction site is small. I remember that the building area is more than 5000 square meters, so it can be dug up quickly. Finally, when I went down to the elevation control, I only had three days of sunshine. Although it was already October, the sun was still very hot. I just finished digging and went back to school at that time. The first thing my classmates said when they saw me was that I was black and tired.
After digging, it is to pad waterproof, then pay off and tie the steel bar. After binding, put the steel bar in place. Friends who have walked on the foundation steel bar know that if they don't step on the air, they will be raw.
Newly poured raft foundation
Maybe this photo is not very clear. Generally speaking, the next day after pouring concrete, all the building materials will be hung down, and it will be difficult for us to pay off the line then. If it is better, we can pass under the material. If I can't wear it, I'll find a way to move it myself. Maybe it's because I have developed a lot of muscles in the past ten months.
It's quite a sense of accomplishment to look at it a little.
1 1 At the end of the month, our project manager transferred me to another construction site.
The second construction site is far away, almost ten kilometers from my home, and I can only ride my little donkey. When I arrived at this site, I found that it was many times larger than my original site. Later, I learned that there was100000 square meters. Half of them have entered the main stage, the other half are still digging, and then they are honored to join the earthwork group.
I didn't know how bad the soil here was until later. The soil here in this photo is already good, and the worst soil is like mud, which is particularly easy to fall off. I remember digging for almost a month.1February was already very cold. At this time, the cold air hit. When I went to the scene this morning, I saw that the mud was frozen. I walked just right on it in rubber shoes, and then the sun came out and the ice began to melt. I got stuck in a mixture of ice, water and mud, and my feet were too cold for a long time. Later, I learned to be smart and put something in my rubber shoes to keep warm.
After the earth excavation, let me be the main body. Because the construction period is tight, more than two places are poured every day. The most vivid day I remember is that the four of us completed the laying of four units. At that time, there was no construction elevator, and we had to climb more than ten floors with our equipment on our backs. Then it snowed heavily, and the workers could rest. We could only sweep the snow, alas, a bitter tear.
In this way, almost all the workers left during the Chinese New Year. Everything valuable on the construction site should be put away, and some cables should be pulled. Only we can do these things, especially the cable, the thickest of which is almost as thick as the wrist, which makes my arm ache for several days.
Later, a few days after the New Year, I was transferred again.
The third site is not far from the second site, and it is also a newly started site. On the first day, I just started earthwork excavation, and I am familiar with the instruments.
The first two months were fine, after all, it was early spring, and then one day it was particularly hot. I remember whether it was 37 degrees or May. I followed them several old builders to pay off the line below, and the sweat kept dripping down.
I think I will get off work one day. Hearing the noise outside, I went out to see my darling. One finger was on the ground, and the blood from the wound of the severed finger was dripping down. What I have seen is worrying. Later, I learned that it was because I was in a hurry to hang things, and then the tower crane worker changed his shift to a bricklayer after work. As a result, this tragedy happened. Fortunately, I went to the hospital in time to connect my fingers.
I resigned when I got my diploma in June, and I am currently changing careers.
Finally, summarize the problems I saw and the reasons for changing careers.
1. Maybe it's because the boss of a private enterprise wants to save money. The management system of the project department is not perfect, and many full-time staff are absent. The builders on the site are all numerical engineers, quality engineers, safety officers, surveyors, and even have to do some manual work.
It is very dangerous on the construction site, such as stepping on a nail and being scratched by steel bars. Falling from the sky, getting an electric shock, mechanical crushing, I remember the teacher told us all kinds of ways to die before, only you can't think of it.
The real problem is that you have to run with the construction site, without rest or holiday, and you will find a girlfriend in the future. Say goodbye as soon as I hear that you are at the construction site. Even if you get married, you can go home several times a year in other places.
4. It is the prospect of the whole construction industry. In the long run, I am not optimistic about the whole construction industry, because after decades of crazy construction, the urbanization rate of China is now almost 60%, and the growth rate is slowly declining, so the demand will also decline, which has gradually become something that everyone has been talking about. For example, as long as we look at the current situation of the construction industry in developed countries in Europe and America, this industry will definitely experience a major reshuffle in the foreseeable future.
- Previous article:Mood Phrases for Cruise Ships Talk about taking a cruise
- Next article:Describe holding hands.
- Related articles
- What should I do if I am always sleepy in summer?
- Talk about expressing your heavy feelings.
- Do you know: sheng has no little mother: how difficult is it for a child without a mother?
- Method of hen soup
- Funny copywriting in a circle of friends
- Toast speech at the housewarming banquet
- Good sentences of tweeting in basketball match
- Thank you for receiving a red envelope from your friend on your birthday.
- What is the symbolic significance of the Young Pioneers team emblem?
- Playing with water is a child's nature.