What are the compilation requirements for bidding construction organization design?

The following are the compilation requirements of bidding construction organization design brought by Zhongda Consulting for your reference.

1. Legitimacy

"Bidding construction organization design" is a legally binding "commitment" issued by the tendering unit to the tendering unit. Therefore, the tendering unit is required to affix its official seal, have the signature of the legal representative and submit it to the tendering unit or agency in a sealed manner.

2. Technical

"Bidding Construction Organization Design" is a technical document that all professional engineers of the bidding enterprise organize everyone to discuss, compile and review, and the chief engineer finally approves it. Therefore, it should be signed by the preparer, auditor and approver. Otherwise, it can only prove that the enterprise is out of control in construction technology.

3. Targeted

Every project has the characteristics of its use function, structural type, geological conditions and environmental and social factors. The construction organization design should grasp its characteristics, focus on description, and be predictable for future construction. Where there are difficulties, it is not easy to guarantee, so it should put forward its own solutions for specific problems, which can reflect the level of the enterprise.

4. Correspondence

The tender documents put forward some specific requirements for the construction unit to bid, so you should read the tender documents carefully and give the other party a satisfactory answer one by one. Never leave the tender documents and ask three questions and answer four questions.

5. Dynamic

The "bid construction organization design" is a process of continuous revision and improvement according to the actual changed situation in the implementation process. Therefore, in the stage of bidding, the construction organization design generally only puts forward a general strategy. It will be further refined after winning the bid. Don't rush to solve all the problems in the future at once, it is also impossible.

6. Relevance

Since "bid construction organization design" is the mutual cooperation of various professions, it is necessary to properly handle the procedures and relationships among the professions. For example, the installation and removal of formwork, in the scheme design, not only the installation but also how to remove it should be considered.

7. Machinability

Construction organization design is a process in which enterprise technicians process all materials through their own mental work, instead of copying them according to textbooks and specifications. Empty slogans and guarantees should be used as little as possible, and the key is to put forward measures to ensure them. What standards and specifications are clear, and what methods are used to approach, reach or even exceed this standard.

8. Don't copy or copy

Some bidders will not draft or save trouble, and then bid by copying several copies of the construction organization design of other projects. The result of copying or plagiarism can only be contradictions and jokes, which the bid evaluation personnel will see through at a glance, so it is better to bid than not to vote.

9. seriousness

words should be concise, charts should be neat, contents should be complete, and binding should be exquisite. Indicates the bidder's respect for the tenderer.

for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd