Personal project supervisor Fan Wen's annual work summary.
The year 20xx is coming to an end. Looking back on 20xx's work, I have the joy of fruitful results, the difficulty of tackling key problems with my colleagues, and the disappointment of encountering difficulties. Time flies, unconsciously, the hopeful 20xx year is coming. The important work this year is summarized as follows:
1. Personal annual work contents:
This year, I mainly participated in the first phase of customs clearance project of Yantai Port Bonded Port Area, the general survey of underground pipelines in Yantai City, the restoration project of three jetty yards in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.
2. Job responsibilities:
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit. In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and try to do it. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
3. Engineering data:
Write a supervision diary every day according to the site conditions, and sort out and file the site records and other materials of the day, and urge the construction unit to report the corresponding engineering materials. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
4. Work experience, feelings and shortcomings:
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge.
In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
5. Personal career development opinions and views on the company next year:
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.
2. The project supervision annual work summary personal model essay.
In 20xx, under the correct leadership of the Municipal Maintenance Center, guided by the spirit of the Fourth Plenary Session of the xx CPC Central Committee, and closely centering on the working objectives of the provincial company "13555" and the working ideas of the provincial maintenance center "12446", our branch unswervingly adhered to the guidance of "taking line maintenance as the main line" and "I am responsible for the line maintenance".
1. Adhere to the line maintenance as the main line, and conscientiously implement the eight-character policy of "prevention first, combining robbery prevention", "guarantee one, level two and improve three".
First of all, based on the "civilized assessment method" of the municipal maintenance center, through extensive democratic discussion, a strict assessment method was formulated to stimulate employees' sense of ownership, improve their initiative and consciousness of doing things according to the rules and discipline, effectively activate employees' work enthusiasm and creativity, make employees put themselves in a correct position, further change their concepts, raise their awareness, and fully enter the role according to their post responsibilities. At the same time, in the aspect of performance appraisal distribution, three grades, A, B and C, are set, and comprehensive appraisal is carried out according to various indicators such as employees' work performance, implementation of rules and regulations, attendance and so on. , thus creating an environment of "comparing, learning, catching up, helping and surpassing" for employees, and employees have a broad platform to show their intelligence. People-oriented is an important prerequisite for doing all the work well. Employees' enthusiasm for work has improved, their thoughts have improved, they love their jobs and are dedicated, and they have done nothing bad. As long as their thoughts don't decline, there are always more ways than difficulties.
Secondly, great efforts have been made in the interaction between the whole people and the maintenance of the whole society, and a platform for the whole society to pay attention to long-term work has been actively created. From the county party committee and county government to the ordinary people in rural areas, we all have the obligation to contribute to the long-term cause. This year, * * * paid a return visit to the county-level optical cable protection leading group (1xxxx), actively contacted and communicated with the county-level urban transformation leading group, and discussed the construction scheme and arrangement of 20xx with the local urban construction bureau and water supply company, so as to ensure that the first-class and second-class optical cables are well marked before construction, and make good protection during construction, increase the marking density, and effectively prevent the sudden occurrence of external obstacles. Since the beginning of this year, the first-class and second-class optical cable inspectors in the sub-bureau have spared no effort to make use of the slack time to pay a return visit and track and collect large-scale mechanical information. The collection rate of return visits has reached/10 xxxx, and investigation, tracking, publicity, contact and signing are in one step. According to the method of "netting", the publicity coverage of wire protection is expanding day by day, and at the same time, the voluntary wire protection is rewarded in time.
The third is to attach great importance to prevention and ensure the safety and smoothness of primary and secondary trunk lines. The safety of the first-class trunk line is not only related to the completion of the annual assessment index, but also tests our maintenance level, which is the focus of the whole maintenance work. To this end, we firmly establish the awareness that primary and secondary trunk lines are not trivial, strengthen line maintenance, patrol, follow-up to households and external influence monitoring, attach great importance to key lines of primary and secondary trunk lines, organize personnel to conduct pre-inspection and pre-repair on primary and secondary trunk lines for many times, and overhaul 5,942 primary and secondary trunk lines (weeding and nourishing soil) and 608 billboards throughout the year.
Fourth, strengthen line rectification and improve the quality of local network maintenance. Firmly establish the concept of "maintenance is service", give full play to the advantages and level of professional maintenance, and prevent and eliminate obstacles. Use the patrol system to monitor the network supervisors in various places to overcome their previous apathy and paralysis. Because most of the local networks are located beside the coal transportation road, it has a great influence on the line safety and hidden dangers are everywhere. To this end, we strengthened the maintenance and rectification, the local network reached the standard of 389 kilometers, 75 poles were replaced, and 689 suspension wires were made, which improved the mechanical strength of the local network pole road. In addition, the special rectification work of "ensuring safety and preventing blocking" was carried out, which improved the management of local network technical data, strengthened the technical training of local network line emergency repair and emergency repair personnel, and ensured the timely completion of line obstacle recovery assessment indicators.
Fifth, carry out large-scale on-the-job training to continuously improve the technical quality of employees. Practice has proved that only skilled skills and excellent skills can do all the work well. In order to meet the requirements of enterprise reform and development and gradually improve the technical quality of line operators, the first thing to do is "training", with the aim of cultivating a team with high technical maintenance skills. So that they can be familiar with the situation of optical cable lines within their jurisdiction, skillfully use optical cable connection testing instruments and machines, and successfully complete the task of repairing and cutting optical cables. For this reason, our branch conducted two professional skills training and acceptance work during the year, and the employees worked hard and studied hard. During the training, they constantly sum up and learn lessons, improve their working methods, give full play to team spirit, help and promote each other, and further improve their technical quality.
The sixth is to implement the emergency dispatch plan and improve the speed of emergency repair. The timely recovery rate of line fault service circuit is a main evaluation index of line maintenance quality. Whether the line fault service circuit can be restored within the specified time limit is also a major indicator reflecting our maintenance level. To this end, on the one hand, we should strengthen our familiarity with and mastery of the emergency dispatching scheme, strengthen cooperation with the maintenance department, and establish the circuit dispatching scheme and operation steps of each optical system. On the other hand, to improve the rapid response ability of line interruption, three large-scale practical drills were organized during the year to organize emergency repair of obstacles. The key training teams were ordered to attack, machine-line coordination, circuit emergency dispatching, obstacle-crossing test, optical cable emergency rushing and on-site cutting, and the use of instruments and tools, so as to improve the level of rapid repair of obstacles, improve their quality and cultivate their abilities.
2. Strengthen external force marking to ensure smooth lines.
Smooth lines are the top priority of all our work. With the county reconstruction and the increase of road widening projects, the workload of external forces is increasing, and the patrol frequency of line inspectors is also increasing. Since the beginning of this year, projects such as road construction, capital construction of farmland water conservancy, laying of natural gas pipelines and replacement of heating pipelines in Yingxian County have started construction one after another. Our guards timely contact and coordinate with the local government and the construction unit. Wang He, deputy head of Huairen County Government, and the manager of natural gas visited the place where the optical cable crossed the construction site with us, and personally reminded the construction workers to ensure the safety of the original large optical cable in Beijing Taixi. And ask them to obey the arrangement of the Ministry in all matters related to the bank. In the subsequent construction, the two sides cooperated with each other, and the construction and line protection were carried out smoothly at the same time. The planning and transformation of Shanyin County has a large scale and a wide range. For our cable protection, it is a long front with many hidden dangers. To this end, we have focused on strengthening the protection of the county, carefully organizing patrol forces, actively contacting various construction sites, and publicizing the importance of optical cables, so as to * * maintain the * * knowledge of optical cables and ensure that the "three stare, three stare" is implemented to the letter. Especially in June and July, two comrades, Feng Zongxi and Zhang Yuxi, were under the scorching sun. In the hot weather above 35 degrees, they frequently shuttle between two kilometers of the county, planting flags, drawing white lines, adding signs, keeping detailed diaries, contacting the sub-bureau in time, reporting the flow of on-site personnel and machinery on that day, keeping close contact with the construction unit, grasping the new situation in time, and achieving early detection and early stop.
3. Carry out various forms of thread protection publicity activities.
Since the beginning of this year, we have carried out wire protection publicity activities in various forms, such as grouping, collective and joint. First, the publicity for the masses has been intensified. In the process of publicity, publicity materials have been distributed, banners have been made, and various questions raised by the masses have been answered in time. Second, during the "5. 17" Telecommunications Day, large-scale publicity and legal education activities on line protection were carried out along the area under its jurisdiction in cooperation with the Municipal Maintenance Center and the troops stationed in the same unit. Huairen and Yingxian Netcom actively participated in this activity. In Huairen County, I paid a special visit to Director Zhang of the Urban Construction Bureau. Manager Bai of Yingxian Netcom Company specially invited TV reporters to interview and record the video, and played the video in prime time that night, with good results. Yinshan South Ring Road unplugged the nail house that harmed the optical cable, which effectively deterred the illegal activities and ensured the safe and smooth communication lines. Third, strengthen the monitoring of large-scale machinery, capture information in time, formulate reasonable measures, and actively make large-scale machinery along the optical cable not out of control and not leak the net, and conduct dynamic monitoring in an all-round and whole process. Fourth, the work of accompanying the line to the home runs through the daily maintenance patrol, and the registration of accompanying the line to the home, the signing of the line protection agreement and the publicity of line protection are integrated, which is carried out anytime and anywhere and has received good results. Fifth, the government has further strengthened cable protection. On June 2 1, the heads of relevant units such as Zuo Zhongwei, Chen Yusheng, and Wang Yuebang, deputy director of the National People's Congress, held a site coordination meeting on optical cable protection. At the meeting, county magistrate Zuo particularly emphasized that in the process of urban transformation, the heads of county committees, county governments and relevant units must attach great importance to protecting the safety of long-distance optical cables. Through this meeting, it shows that the local government has put the understanding of the importance of long-distance optical cables on the agenda, which has played an escort role for us to ensure the smooth flow of long-distance optical cables. On June 22nd, Director Huang of Urban Construction Bureau personally organized the person in charge of the urban construction team to come to our branch office to hold a maintenance line meeting. The sub-bureau introduced in detail the routing direction and accurate location of Beijing-Taiwan West, as well as the original large optical cable. And focus on explaining the importance of protecting the long-distance optical cable to the person in charge of construction, asking them to explain the importance and harm of protecting the optical cable and the serious consequences of destroying the optical cable to the front-line construction personnel in time, actively cooperate with the line sub-bureau to protect the optical cable, and make due contributions to urban reconstruction and smooth long-distance optical cable.
4. Pay close attention to management to ensure safety in production.
Safety in production is related to the overall situation and has great responsibilities. Our branch always adheres to the policy of "prevention first, safety first", earnestly implements various safety production measures and strengthens safety production management. First of all, the Law on Work Safety and the policy of "prevention first, safety first" were strictly implemented, and all the staff of the Branch signed the "Responsibility Letter for Work Safety", and the implementation of rules and regulations and the operation of operating procedures were included in the assessment scope, so as to resolutely put an end to mistakes and accidents. 10, according to the arrangement of Datong Maintenance Center, our sub-bureau actively carried out safety production and public security fire warning education while doing a good job in line maintenance, and vigorously strengthened safety education for employees, and conducted a question-and-answer activity on safety production and public security fire knowledge throughout the sub-bureau, which improved employees' awareness of safety production and public security fire control, and ensured the safety of people, vehicles and lines in line maintenance without accidents. Second, adhere to the regular supervision and inspection system, find problems, immediately rectify, criticize or impose financial penalties on the parties to ensure safety in production. The third is to educate employees to consciously abide by various rules and regulations and adhere to the daily safety production meeting. It is especially emphasized that in the "three-line crossing", the line patrol personnel must wear insulating shoes and safety helmets, and test with a pencil before putting out the pole to ensure personal safety. At the same time, the motorcycle of the line inspector is inspected irregularly to eliminate hidden dangers and prevent accidents.
3. The project supervision annual work summary personal model essay.
With the passage of time, 20xx years passed quickly. At the end of this year, it is very helpful for me to review my work in the past year, calm down and sum up my achievements and gains, and find out my shortcomings, so as to facilitate my future work and sum up my work in the past year. I sincerely hope that you can give me a hint about my improper summary. In the past year, with the strong support and care of the leaders of the company and the project department, I earnestly adhered to "the guiding ideology of pre-control, standardization, science and high quality is firmly established" to ensure the satisfaction of every owner and work hard wholeheartedly. Let me talk about my work in 20xx.
1. After receiving the engineering design and construction drawings, be familiar with the drawings, understand the design intent, understand the main technological process and engineering characteristics of the construction process, record the suggestions on the construction drawing paper in writing, take corresponding measures to apply them to the construction site, and do a good job in sampling data of related projects.
2. Record and inspect all materials, personnel and mechanical equipment on site, and prevent unqualified materials from being used in the project. For the construction of key parts of the project, arrive at the station in advance, check whether the construction preparation work is in place, and make a written record of the whole construction process.
3. Inform the project management department of the construction unit in oral or written form in time of the problems found in the inspection tour, and report to the resident supervision engineer, supervise the construction unit to carry out rectification and recheck, and do a good job of on-site supervision.
4. With regard to the control of safe and civilized construction, I have accumulated some experience by studying the safety production law and establishing the viewpoint that safety prevention is the priority, that is, work should be done first, because accidents can be prevented but unpredictable, and corresponding inspection systems should be established, such as checking whether the full-time safety officer on site is in place, and checking whether the safety protection net, workers' safety belts and helmets on the construction site are complete. Check whether the key parts of the site project are provided with safety warning signs, and rectify them in time when potential safety hazards are found. Supervisors have an unshirkable responsibility for the safety of the construction site, do a good job in daily safety inspection, supervision and management, make corresponding data records, strengthen patrol work, strengthen process control, and do their work better and more seriously.
20xx's work is very busy and full. In order to perform supervision duties, work actively, obey the arrangement of leaders, never shirk, and think of the project wholeheartedly, I will study professional business knowledge more attentively in the coming new year of 20xx, and strive to provide effective benefits for the company.
- Previous article:Is it male or female to eat crabs on National Day?
- Next article:What diseases should we pay attention to when raising pigs?
- Related articles
- How to strengthen enterprise secrecy under the new situation
- How to build a corporate brand image?
- Which of the eight accounting firms is better?
- Chinese medicine assistant physician qualification examination: open the door for you who love Chinese medicine.
- What are the three aspects and six qualities of core literacy?
- Production work plan
- Can I drive if there are no cars or pedestrians on the opposite side of the country road?
- How do college students protect wild animals?
- A collection of seventy-five short slogans that are domineering and powerful for the class
- Why can't the dragonfly be caught?