project name: fixed expenses: special expenses are calculated in real terms
safety
construction expenses
1. Labor protection expenses for purchasing safety protection articles and appliances for production workers such as helmets and safety ropes.
2. Configuration cost of fire-fighting facilities and fire-fighting equipment.
3. Safety training, education and publicity expenses.
4. Public order management fees.
5. Safety construction expenses included in other quotas.
1. expenses for compiling special safety construction scheme and safety data.
2. Purchase and installation expenses of safety construction signs and signs.
3. Safety protection expenses for "four openings" (stairway, elevator wellhead, access opening and reserved hole) and "five adjacent edges" (balcony edge, floor edge, roof edge, pit edge and both sides of unloading platform).
4. Fees for three-level distribution box, two-level protection device and external protection measures for safe construction.
5. Costs of safety protection measures for cranes, tower cranes and construction lifts.
6. Special inspection fees for hoisting machinery on construction site.
7. Cost of safety protection facilities in the operating area of on-site construction machines and tools.
8. expenses for other safety protection measures. 1. The cost of vertical closure of buildings.
2. Cost of measures for vertical protective frame, horizontal protective frame and safety protection passage.
3. ensure the safety protection expenses for buildings, structures, cultural relics, landscaping and urban infrastructure such as electric power, communication, water supply and drainage, oil and natural gas pipelines around the construction site.
2. installation and use of remote monitoring facilities and amortization expenses of the facility workers.
5. Other safety construction costs shall be calculated according to actual conditions.
cost of civilized construction
1. cost of temporary facilities. Including temporary offices, dormitories, canteens, toilets, shower rooms, washrooms, medical and health care rooms, study and entertainment rooms, material warehouses, processing plants, construction fences, pedestrian walkways, structures and facilities such as water supply (drainage) pipes (ditches) and power supply pipelines within 5m from the outside of the construction site.
2. Allocation cost of temporary medical care, rescue and health care items on site.
3. Production workers' heatstroke prevention and cooling expenses, cold protection and warmth retention expenses.
4. civilized construction costs included in other quotas.
1. the cost of "six cards and two pictures".
2. Maintenance and cleaning expenses for beautifying the temporary enclosure wall (plastering inside and outside, whitewashing, slogans, painting, etc.).
3. The temporary office and living facilities on site include decoration expenses such as tiling and hardening of walls, such as offices, dormitories, canteens, toilets, shower rooms, washrooms, medical and health care rooms, study and entertainment rooms, and facilities that meet the requirements of safety, hygiene, ventilation, lighting and fire prevention.
4. Hardening expenses for the entrance and exit of the site and the construction operation site.
5. Vehicle washing facilities and washing and cleaning expenses, and on-site sanitation and cleaning expenses.
6. Temporary greening expenses on site.
7. control the cost of dust, noise and waste gas.
8. Cost of thermal insulation measures for temporary facilities.
9. Traffic management expenses for temporary occupation of roads.
1. Other civilized construction costs. 1. Construction cost of enclosure closure.
2. On-site temporary road hardening expenses.
3. Construction waste removal costs.
4. Closed transportation cost of spill-prone substances.
5. High temperature subsidy fee.
6. Project sewage charges.
7. Other civilized construction costs are calculated according to actual conditions.
- Previous article:Corporate Culture Slogan of Changan Mazda
- Next article:Top ten brands of hot pot bottom materials
- Related articles
- Company couplet slogan
- Agricultural machinery policy and safe operation slogans
- What are the characteristics of homework design under the new curriculum standard of junior middle school Chinese?
- What is the word that is close to the form of hiss?
- Kindergarten small class "Matching" lesson plan
- Red competition slogan
- What does it mean to be born in traditional Chinese medicine?
- Slogan of preventing school bullying in primary schools
- How to say poster design in English? How to write "making posters" in English?
- There are bugs growing in the rice stored in the granary at home. What is the written name of this bug?