Joke Collection Website - Bulletin headlines - The latest popular company spring outing activity planning plan
The latest popular company spring outing activity planning plan
The arrival of spring is the season for traveling and outings to feel the beauty of nature. So how to write a related activity plan? The following is the latest popular company spring outing activity planning plan that I share with you for your reference.
The latest popular company spring outing activity planning plan
?The sun is shining and the spring flowers are blooming. In order to enrich employees' spare time life and make them happy physically and mentally, as well as to enhance communication and exchanges between various departments and strengthen team cohesion, the company specially organized this spring outing. The relevant matters are now notified as follows:
? 1. Activity theme: Entering spring, embracing green; getting close to nature and feeling life!
? 2. Activity location: Natural scenery of XX Mountain District (the junction of xx district and xx district)
? 3. Event time: x, month x, 20xx (Saturday)
? 4. Participants: all employees
?5. Activity format
?1. This activity is divided into mountaineering group and photography group. After arriving at the activity scenic spot, the mountaineering group climbed to the top from the east side of the scenic spot, and the photography group took a bus to the top from the west side of the scenic spot. The two groups met at the top of the mountain and then took the bus down the mountain.
?2. During the event, everyone can pick up the shooting equipment in their hands, record the beautiful scenery and capture memorable moments at any time, and send it to *** email within one week after the event. We will select outstanding works and display them.
?6. Registration method
?Participants are requested to register at the ** office before get off work on Wednesday (April 8, 20xx) and select an activity group.
?7. Activity arrangements
?08:00-09:00 Gather at the main entrance and take the bus to the scenic spot
?09:00-12:00 The mountaineering group got off the bus and climbed to the summit from the east side of the scenic spot. The photography group continued to take the bus to the west side of the scenic spot to climb to the summit.
?12:30-13:00 All the people gathered at the stone monument in the Alpine Rose Garden of Miaofeng Mountain on the top of the mountain. Take a bus down the mountain on the west side of the scenic spot
?13:00-15:00 Lunch
?15:00-16:00 Return after the activity
?8. Cost Budget
?9. Warm Tips
?1. The main peak of xx Mountain is 1276 meters above sea level. The entire climbing process takes about 2-3 hours. Please choose a climbing group according to your personal physical condition. Or photography group.
?2. Participants are requested to gather at the company’s main entrance at 08:00 am on April 11 (Saturday).
?3. To ensure the safety of the activity, please wear sports shoes and casual clothes. Please add additional clothing as appropriate as the temperature at the top of the mountain is low.
?4. During the activity, be sure to pay attention to fire prevention in the forest area, strictly prohibit smoking and littering, and pay attention to protecting the ecological environment of the scenic spot.
? The latest popular company spring outing activity planning plan
? April is a good time for travel and outing, in order to enrich employees’ spare time life, relieve work pressure, and enhance communication between departments Communicate and enhance cohesion. The general manager office and administrative logistics department of the company jointly organized the spring outing with the labor union. The specific notice is as follows:
? 1. Time: x, month x, 20xx (tentative)
? 2 , Location: xxxx Scenic Area (Level 4a)
? 3. Sponsoring Department: General Manager’s Office
? Organizing Department: Trade Union, Administrative Logistics Department, Marketing Department
?4. Registration method
?1. Target audience: all employees of xx
?2. Registration method: Please register on a department-by-department basis before getting off work on xx day of x month. Summarize the participant information and send it to the General Manager Office xx.
?5. Activity Arrangement
?(1) Activity Process
?8:00 Gather in the company
?8: 30 Count the number of people, prepare supplies, and set off on time
?9:00-12:00 Arrange activities according to the scheduled route and time
?12:00-13:00 Lunch
?13:00-17:30 Carry out activities according to scheduled routes and time arrangements
?17:30 The activity ends and the counting personnel return.
?(2) Organizational Arrangements
?1. General Coordinator: xx, responsible for overall coordination and liaison with various groups.
?2. Logistics service group: xx, responsible for on-site service and logistics work.
?3. Publicity: xx, responsible for event poster production, photography, company flag production, etc.
?4. On-site coordination: xx, responsible for assisting in coordinating on-site work and maintaining order.
5. Activity organization: xx, responsible for assisting in organizing collective activities.
?6. Preliminary inspection: xx, responsible for determining the tour route and catering arrangements.
?(3) Preparation before the event
?1. Promotional supplies: posters, company flags, cameras, etc.
?2. Prepare some bottled water, snacks, and fruits.
?3. Prepare simple medical first-aid supplies: band-aids, gauze, hydrogen peroxide, cotton swabs, etc.
?4. Conduct on-site inspection of tour routes, determine catering arrangements and event venues.
?(4) Route arrangement: to be determined
?(5) Group activities (to be determined)
?6. Cost budget (omitted)
?7. Precautions
?1. Pay attention to protecting the environment and do not litter.
?2. The group is holding a photography competition, and interested colleagues can bring their cameras.
?3. Please remind everyone to wear clothing and shoes suitable for outdoor activities.
?4. Please obey the command, pay attention to safety, follow the designated route to watch and play, and do not leave the group without authorization.
?5. In case of rainy weather or other emergencies, the event will be postponed to the next weekend.
?General Manager’s Office
?The latest popular company spring outing activity planning plan on xx, month xx, xx
?1. Activity time: March 20xx 27th and 28th (time will be adjusted depending on weather conditions).
? 2. Activity location: xx Ecological Farm and xx (choose one of the two places).
? 3. Personnel Arrangement: For the two batches of personnel, they will first register and select the location by themselves, and then make personnel adjustments.
? 4. Persons in charge of the spring outing: xx, xx, xx and each store manager and field manager.
?xx leads the team and is mainly responsible for the spring outing routes, rest and meal times, and bus and boat arrangements to ensure that the spring outing is safe, orderly, and interesting;
?xx and xx preside over the coordination, Mainly responsible for personnel's item ordering, vehicle reservations, meal arrangements, photography games, etc.
?5. Preparation for the event: 1. One minibus; 2. Banner: Spring Outing for Outstanding Employees of People with Baskets (there are also banners held by people with baskets); 3. Drinking water; 4. Loudspeaker ; 5. Camera.
Gather together at the Xidu Ginza Store and get ready to take the bus——
Set off to xx Yuantangxi on time at 8:40 am.
?Go to xx Yuantangxi Scenic Area around 10:00 am and take a boat tour to one of the Yuantangxi scenic spots.
?Visit xx surrender workshop at 11:30 am.
?Dine at the special xx duck restaurant on the roadside at 12:00 noon (you can also arrange to eat at Fengyu Qiaotou).
?14:00 p.m. Take pictures of Fengyu Bridge, Drum Tower and Tianhou Temple on the xx River.
?Gather at 16:00 in the afternoon and take the bus back to the company.
?(Two) Arrangements for the xx Minzhuang Spring Outing on March 28:
?At 9:00 am, all those who signed up for the xx Ping Spring Outing gathered at the Xinmin Restaurant and prepared to take the bus—— At 9:10 am, we set off for the spring outing to the farm on time.
Arrive at the farm around 10:00 am and organize a visit to the breeding factory and farm.
After 12:30 in the morning, organize barbecue and development training (treasure hunt game in groups).
?Tour Jingping Ancient Village at 14:00 in the afternoon.
?Gather at 16:00 in the afternoon and take the bus back to the company.
?7. Notes for spring outing personnel:
?1. The list of participants will be coordinated and arranged by the person in charge of each store (headquarters office staff, farms and new vegetable research and development bases can register on their own) , and submit it in writing to the Marketing Planning Department of the Headquarters Office before March 20.
?2. Those who participate in the spring outing can bring friends. The fee is aa. The number of friends brought must be reported to the planning department before March 25.
?3. All spring outing personnel should try to wear work clothes and travel shoes or shoes that are easy for hiking, and wear sun protection hats according to weather conditions to participate in activities.
?4. Persons with hot weather, physical discomfort or motion sickness should inform the person in charge in advance.
?5. When carrying out tour activities, spring outing personnel should be divided into groups (breeding group, Baoshan group, mixed group) to carry out activities. The group leader shall be the store manager or foreman. Pay attention to the safety of people during the tour. If there is an emergency, please call the relevant staff.
- Previous article:7 copies of eye-love day propaganda slogans
- Next article:Why aren't there five Chongqing slogans on the street now?
- Related articles
- Summary of water conservation publicity week activities in primary and secondary schools
- Reading "University" 0 15: Know your virtue and stare at yourself all the time.
- How do mothers tell if their babies are full?
- Is there parking stickers during the epidemic?
- Billiard Room Promotional Slogan
- Will Tian Dao Box be banned?
- Slogan of 2020 Constitution Publicity Week
- Property commitment letter
- How to deal with motor vehicles jumping in line?
- Lock slogan