Talk about construction safety and civilization planning?
When it comes to the construction site, people always think of cold steel bars, concrete, bricks, and a dirty, messy and unsafe environment. Through my experience in the third phase of Vanke Golden Blue Bay Project As a front-line director, he has fundamentally changed the simple, mechanical and single concept of safety and civilization management at construction sites. Let the building praise life! Let humanistic care make safe and civilized work - warmth is revealed in the details! Let the construction site have social culture , a strong sense of corporate culture!
Through active innovation, through the application of high-end modern science and technology, modern equipment in the safety and civilization management of construction sites, through the integration of safety and civilization, environmental protection, and occupational health ideas Integrating into one, by implanting artistic concepts, pursuing beauty, and paying attention to details, the safety and civilization work at the construction site is given vitality and vitality, making the safety and civilization work a unique landscape!
Planning First of all, safety and civilization are the top priority of project management. It is an important and serious scientific management activity that is systematic, complex, multi-dimensional, involving all employees, and carried out throughout the entire process.
Determination of safety management objectives:
Safety first, prevention first, preventing fatal accidents, minor injury rate <1‰, serious injury rate 0; ensuring a safe and civilized construction site in the province ; Ensure a civilized construction observation site in the district and strive to create a civilized construction observation site in the city.
Safe and civilized layout at the construction site entrance, construction office area, construction site area, and construction living area:
On-site safe and civilized layout positioning: atmosphere, ecological environmental protection, color harmony, and humanistic care , Corporate culture
3.1 Gate area of ??the construction site:
The construction site entrance gate is set up, an access control system is set up, and the doormen are uniformly dressed to register passing vehicles and people; a corporate image wall can be set up if conditions permit. : Enhance the company’s visibility and increase employees’ sense of belonging and pride; set up safety warning mirrors; set up eight signs and one picture; set up safety production signs and dangerous operation notice boards (fill in daily to highlight safety work); set up a pre-shift commentary desk : Where the safety morning meeting is held, you can use the publicity wall (environmental protection, green) on the commentator's desk - the theme "Let safety escort life" to make the construction site "bright"! If conditions permit, an automated car wash station will be installed; a firefighting combination at the facility construction site station; a broadcasting system is installed at the gate of the construction site: music and safety broadcasts can be used during commuting time to relax the tired body and mind of workers who have worked hard for a day, so that safety awareness can be subtle and deeply rooted in people's hearts. Through the broadcasting system, the construction site can be "moving"!< /p>
3.2 Construction office area:
There are stainless steel flagpoles and flag holders in front of the two-story temporary office building, and large vases on both sides; it is recommended that the office area be surrounded by a curved classical fence to form a courtyard; The company's cultural concept propaganda boards can be hung in the courtyard walls; a large electronic warmth display board is installed at the entrance of the office area; the project manager's office is equipped with a construction site monitoring intelligent system; as an important place for frequent meetings and coordination between participating units and external system units of the project, their meetings The image layout of the room can reflect the importance of the project, the culture of the company, and the strength of the company: the floor is paved with floor tiles and the walls are pasted with pictures of the company's award-winning project performance to stimulate the enthusiasm of project department employees; a curtain is hung on the front wall of the conference room and a projector is installed , laptop computers and other modern equipment; the conference room tables and chairs are suitable for 20 people, which are simple, elegant and generous; small national flags and corporate flags (especially large projects) are set up on the conference table to look solemn and grand, and increase the sense of responsibility and A sense of mission; curtains should be installed on the windows of the conference room; the company's cultural core value sign can be placed on the back wall of the conference room; it is recommended that the conference room should be equipped with a project quality management column to reflect the quality and progress management in the process through pictures and information.
3.3 Construction site area:
The construction site fence should be detachable and can be recycled. The building number signs and on-site guide signs should be made on the walls; the steel bar storage yard and processing shed should be For standardization, it is necessary to consider that the color is consistent with the overall safety and civilization color; the edge protective railings are painted with black and yellow mixed paint, with even spacing (a dedicated person will spread the separation tape before painting) and hang safety and civilization slogans and warning signs; on-site garbage dump Covered garbage storage pools are divided into recyclable and non-recyclable ones. Smoking pavilions should be set up on the construction site (it is recommended that the smoking pavilions be made of solid wood to increase the ecological appeal of the construction site); a rainwater collection system should be set up if possible: vehicle washing and road sprinkling will use collected rainwater; A model display area; a general fire protection plan is hung on the fence; a safety sign plan is hung on the fence; green lawns and green belts are set up around the perimeter considering the actual situation.
3.4 Construction living area:
Large-scale projects are equipped with doormen and access control systems; leisure and entertainment facilities are provided: table tennis rooms, small basketball courts, so that employees can combine work and rest, and have a healthy and rich life. Cultural and sports activities; set up a spare time school for farmers; project department managers can even invite owners and supervisory engineers to give lectures to improve the technical and cultural qualities of migrant workers; set up small supermarkets; set up summer clothes sheds and bicycle parking sheds; set up employee bathrooms , fully equipped; a clean and sanitary cafeteria; a list of dormitory residents hung at the door of each room, an accommodation management system posted on the wall, uniform beds, and trash cans; small publicity signs on environmental protection, hygiene, safety, and love for life are made in the living area , change concepts in details and enhance humanized management.
Safety management standard actions:
Project management is systematic, and all participating units are bound to take responsibility for safety management, and we will promote it together! Safety management of each participating unit has formed standards Actions, form a standard system, and form habits!
4.1 Owner’s standard actions for safety management:
4.1.1 Establish a production safety management committee, personally led by the person in charge at the company leadership level, At the same time, a production safety action team led by the project manager was established to inspect the site, discover safety hazards, and issue safety notices to Party A in a timely manner, requiring the general contractor to make rectifications and replies; if rectifications were not made within the specified time, , will shut down (stop work).
The expenses incurred during the shutdown period shall be borne by the responsible unit; 4.1.2 At the beginning of the construction, organize a special ceremony to sign the safety production responsibility certificate of the construction unit and the general contractor. The ceremony should be grand and brief, and the owner's company-level leaders and relevant counterparts in the project construction Units (auditing, finance, etc.
etc.) need to participate;
4.1.3 The owner organizes a special safety inspection at the end of each month, conducts scoring, and links it with the monthly project payment , formulate specific operating rules, especially those with multiple bid sections can be scored and ranked to evaluate regional benchmarks;
4.1.4 Requirements for the general contractor: company-level leadership of the construction unit, safety functional department Personnel inspect the site once a month, put forward opinions and suggestions on safety and civility work, and leave video data at the same time;
4.1.5 requires the general contractor: the safety officer shall report a safety daily report at 10:00 am every day (with a safety report attached) Work pictures);
4.1.6 requires the general contractor to submit a weekly safety production supervision report (with images attached) before 2:00 pm every Friday;
4.1.7 requires the general contractor to: The contracting unit will hold a safety morning meeting at 6:30 in the morning in front of the pre-shift briefing desk; (Video information will be retained)
4.1.8 All managers will take part in the safe and civilized construction management examination, and only those who pass the exam can take up the job ;
4.2 Safety management standard actions of the supervision unit:
4.2.1 The supervision department is equipped with full-time safety officers and formulates a full-time safety and civility engineer job responsibility system;
< p> 4.2.2 Every Friday at 9:00 a.m., the Supervision Department organizes the general contractor safety officer to conduct a weekly safety inspection system;4.2.3 Every Friday at 10:00 a.m., the Supervision Department organizes a weekly safety inspection Conduct meetings, use pictures to visually explain, summarize, organize and analyze weekly safety issues, and form safety and civility meeting minutes to report to owners every week;
4.2.4 Develop a safety and civility form, score every day, and at the same time Report to the owner at 9:00 a.m. the next day;
4.2.5 The safety officer conducts random inspections and safety morning meetings twice a week; (leave image data)
4.2.6 Supervision Department Full-time safety officers wear red armbands and work on-site;
4.2.7 Full-time safety officers from the Supervision Department inspect the internal safety management materials of the construction unit at the end of each month;
4.2. 8 Strengthen the on-job management of special types of work and require the general contractor to make uniform badges for personnel entering special types of work and carry the IDs with them for future reference;
4.3 Standard actions for safety management of construction units:
4.3.1 The project manager of the construction unit must conduct safety and civilized inspections of the on-site work area and living area every day, discover potential safety hazards, deal with them in a timely manner, and leave image data;
4.3.2 Project manager, Safety officers organize construction team leaders to conduct safety and civility briefings and safety and civility
education to workers every day, with video materials.
4.3.3 The project department shall promptly conduct three-level safety and civilization education for new teams and new personnel, and have written information;
4.3.4 The construction unit shall be required to do so before 9:30 every day The safety officer reports the safety daily report of the previous day to the supervisory data clerk, and at 10:00 the supervisory data clerk reports the safety daily report to the owner in a centralized manner.
4.3.5 Safety officers report to the supervisory safety engineer every Friday afternoon for weekly safety production supervision;
4.3.6 Every morning at 6:30 in the morning, the safety officer will report to the supervisory safety engineer in front of the pre-shift commentary stage. Organize workers to hold morning safety meetings;
4.3.7 Safety technical briefings by safety officers go deep into each building;
4.3.8 Safety management personnel wear red embroidered badges and carry loudspeakers Correct violations at any time.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:How to speak and write industry slogans in English?
- Next article:Slogans to eliminate overnight food
- Related articles
- What are the benefits of drinking red dates, medlar and brown sugar water?
- Six Essays on Creating a Civilized City
- Will malaria be serious in South Africa in 2022?
- The school philosophy emphasized in the professional standards for kindergarten directors
- What is the specific content of "three highs and four innovations" in Hunan Province?
- How to draw the poster of flea book fair beautifully and concisely? Make handwritten newspapers for keeping mobile phones and flea markets.
- The company signed a safety responsibility letter with employees.
- What is the important magic weapon for the great rejuvenation of the Chinese nation?
- 3 bank publicity plan
- Do you have a creative and attractive name for your fruit shop?