Discussion on management measures of safe and civilized construction of residential group projects?
1 CI identification system in construction site
The construction site shall be marked according to the requirements of CI image design of the company. If the company has no regulations, it shall be implemented according to the relevant safety and civilization requirements of Tianjin.
The requirements of CI identification system on the construction site should be indicated in the general contract, and the engineering department should make disclosure before the overlay construction on the general contract site.
1。 1 Construction of main entrance gate
Temporary gates for main entrances and exits shall be designed according to the provisions of Tianjin general contracting or civilized construction.
1.2 image requirements for the main entrance of the building
At the entrance, a project overview card, a project target card, a project organization structure card, a civilized construction management card and a safety fire prevention card are set.
The gate is hard, and the vehicle entrance and exit are equipped with vehicle washing devices and drainage ditches to ensure that vehicles with dirt can enter the city streets after washing.
1.3 temporary fence design
The height of the fence is not less than 2m (not less than 2.5m on one side of the main road).
In the general contract, it is stated that the right to publicize the packaging of the temporary fence on site belongs to the company, and the requirements or design shall be uniformly formulated by the marketing department.
1.4 nameplate design of project department
The company logo and project name are written on the nameplate of the project department and hung in a conspicuous place at the mouth of the project department.
1.5 wall hanging information requirements of engineering department
The main information on the wall includes: project overview, project organization chart, post responsibilities, construction progress control plan, image progress chart, image progress, barometer, project general plan, etc. As shown in the figure.
1.6 personnel requirements of engineering department
Safety helmet: Stick or spray the company logo on the center of the front of the safety helmet, and stick or spray the company logo on the center of the back of the safety helmet.
Safety shoes: equipped with waterproof and nail-proof high-top safety shoes.
Walkie-talkie: Management personnel carry walkie-talkies at the scene.
Badge: made according to the company's requirements and must be worn when entering the site.
1.7 company CI logo
The company logo is hung on the counterweight arm of the tower crane; * * Real estate; The combination of Chinese characters and signs, the building hangs the company's unified propaganda slogan.
1.8 site road
On-site temporary construction road adopts hard subgrade, with good roadside drainage facilities, smooth traffic and smooth and clean pavement.
1.9 bathroom
The general contractor shall arrange special personnel to clean the toilets on the project site in time and keep them clean.
2 Construction process management
Before the project starts, the engineering department shall assist the supervision company to review the safety and civilization requirements in the construction organization design of the general contractor, and check whether it meets the CI image recognition system of the company and the safety and civilization requirements of Tianjin.
The supervision company is responsible for the daily inspection of the construction site, checking whether the contractor's site materials are classified and neatly stacked according to the regulations, whether the temporary roads are clear and clean, whether the labels of all kinds of equipment are well prepared, whether the site garbage is classified and stored in the fixed garbage station, whether the edge of the foundation pit is safely protected according to the regulations, whether the scaffolding safety protection measures are effective, whether the site lighting is sufficient at night, and whether the inflammable and explosive products are stored in the special warehouse. For the problems found, the contractor is required to carry out rectification within the prescribed time limit, and the rectification shall be reported to the supervision unit for review.
Supervision company's inspection of site safety and civilized construction is reported to the engineering department in the form of weekly report; At the end of each month, organize an inspection and appraisal of the construction units entering the site.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:How to improve teaching quality?
- Next article:Safety Education Week Activity Plan
- Related articles
- What is the salary of Anyang Lv Wen Group?
- Famous sayings, stories and slogans about honesty
- What entrepreneurial support programs are there in rural areas?
- Eight-character slogan of technical team
- The Origin and Development of Social Fire
- Knowledge about bees is a short sentence in Grade Three.
- What is the meaning of bank financing net worth type?
- Programme of activities on the theme of persons with disabilities
- Slogan for World Environment Day
- Low-quality social interaction is not as good as high-quality alone time