In order to do a good job of "Three Preventions" in the rainy season of 20 17 in Quanqi Coal Mine, conscientiously implement the Emergency Notice of the State Council Safety Committee on Further Strengthening the Work of Safety in Flood Season (No.of Safety Committee Office 1 1), and ensure the safety of Quanqi Coal Mine in flood season, this scheme is formulated in combination with the actual situation.
One is to strengthen organizational leadership.
Strengthen the organization and leadership of the "three defenses" work in the rainy season of coal mines, improve the working system, and set up a leading group for the "three defenses" work in the rainy season of flag coal mines. Members are as follows:
Team leader: folding navy
Deputy Team Leaders: Zhao Yaozhong and Jiang Feng
Members: Hu, Li Xiangbing, Zhang Xiaodong, Li Zhimin, Ren, Dabboura Gan, Gao Chuan, Luo Hucheng.
The leading group is specifically responsible for organizing, coordinating and supervising the three defenses in rainy season in coal mines.
Second, the overall requirements
According to the relevant regulations, combined with the characteristics of mine safety production in rainy season, various coal mining enterprises have studied and formulated a targeted and feasible implementation plan of "three defenses" in rainy season. All coal mines are required to report their rainy season three prevention plans to the Flag Coal Bureau for the record.
Third, pre-flood investigation.
Before the arrival of the flood season, Quanqi Coal Mine should conduct a comprehensive and detailed investigation of hidden dangers of water disasters, focusing on:
(a) the preparation of the rainy season "three prevention" work plan and implementation plan, establish and improve the post responsibility system and management system of mine water disaster prevention.
(two) to conduct a comprehensive inspection and maintenance of the mine drainage system, pumps, pipelines, electrical control equipment should be kept in good condition, adequate accessories, and joint debugging, to ensure that the mine drainage capacity meets the specified requirements.
(three) to conduct a comprehensive excavation of water storage, ditches and so on. , to ensure the effective volume.
(four) to conduct a comprehensive inspection of the flood control and drainage system of the industrial square around the mine.
(5) Inspect and test the lightning protection devices of ground buildings, power distribution stations, power supply lines, derricks, monitoring and other facilities, conduct preventive tests on power supply and transformation facilities such as main transformers and underground cables, and check the electromechanical protection of power supply system to ensure sensitivity and reliability.
(six) the completion of the pump room, substation, flood control materials warehouse and other important places on duty, the implementation of the personnel on duty, to maintain smooth communication.
(seven) the mined-out area is easy to accumulate water and the overlying strata have confined water.
Fourth, supervise implementation.
We must resolutely overcome sloppy thinking, carry out inspection activities continuously and regularly during the flood season, and strictly check the implementation of the "three defenses" work plan and various measures in the rainy season of coal mines. Coal mines should be rectified in strict accordance with the "Five Implementations" when checking and confirming all kinds of hidden dangers of water disasters. In rainy season, water disaster prevention measures are not strictly implemented, and all coal mines with major water disasters will be stopped (built) for rectification.
Verb (abbreviation of verb) emergency management
All coal mines should strengthen communication with meteorological, flood control and other departments, timely grasp the meteorological early warning and forecasting information, and must stop production and evacuate people in case of extreme weather such as heavy rain. Every time there is a rainstorm in a coal mine, professionals should be sent to observe hydrological changes and ground subsidence to ensure safety before resuming production. Establish and improve the rainy season "three defenses" special emergency rescue plan, and conduct drills before the flood season.
This year, the number of extreme weather such as rainstorm and lightning in flood season in our city has increased, which poses a serious threat to coal mine safety production. In order to effectively cope with the impact of extreme weather and ensure the safe production and construction of coal mines in the city, relevant matters are hereby notified as follows:
First, strengthen organizational leadership and arrange deployment in advance.
The provincial coal mines, county (district) coal management departments and coal mines directly under the municipal government should fully understand the extreme importance of the "three defenses" work in the rainy season of coal mines, adhere to the principle of "who is in charge and who is responsible", and strictly implement the supervision responsibility of the regulatory authorities and the responsibility for coal mine safety production. Strengthen the organization and leadership of the "three defenses" work in rainy season, dispatch duty and investigate underground water disasters, firmly establish the awareness of advanced prevention, resolutely overcome the paralysis and luck, and base on flood control and disaster relief, early planning, early preparation and early deployment. All departments and coal mines should set up a leading group for "three defenses" in the rainy season, set up a flood fighting and rescue team, and reserve a sufficient number of rescue materials, so as to ensure the safety of coal mines during the flood season.
Two, highlight the key points of prevention and control, comprehensive investigation and management.
(a) to strengthen the basic work of mine hydrogeology, find out the catchment and leakage of surface water system in the mining area and its vicinity, the water volume and water pressure in the old kiln, goaf and other areas prone to water accumulation in the mining area, and determine the water warning line, especially the integration of technical transformation mines. Integrating mine hydrogeology and roadway layout must be accurately drawn on underground control chart and mining engineering plan.
(two) improve the mine drainage system, the underground pumps, pipelines, transmission lines and other facilities to conduct a thorough investigation; Strengthen the maintenance of alleys, stone gates and main inclined lanes, and clean ditches and water silos to meet the needs of mine drainage. And conduct an emergency drill of underground drainage system before the flood season. If the drainage system is not perfect, stop production and construction immediately.
(3) Do a good job in lightning protection and improve lightning protection and grounding facilities, including lightning protection and grounding of cables, pipelines, tracks and belt racks entering the well, and insulating plywood of tracks entering the well; Strengthen the inspection of mine power supply lines, prune or cut down the trees that affect the safety of power supply lines, overhaul the pole-Tara line in place, strengthen the observation of landslide areas around towers, and take immediate measures to deal with the danger when it is found, so as to ensure the normal power supply of power transmission lines; Substation and all kinds of relay protection, lightning arrester, etc. It must be sensitive and reliable to prevent lightning from damaging various facilities, and the staff must standardize the operation of the substation and wear necessary protective tools.
(4) For coal mines located near surface rivers, mountain torrents and reservoirs, dams and ditches should be built at wellhead and industrial square to prevent surface water from flowing back into the mine. When there is water leakage in surface water body, coal mining subsidence area and outcrop of coal measures strata. Therefore, it is necessary to carry out anti-seepage reinforcement treatment for the basement of the leaking water body. Strengthen the prevention and control management of raw coal piles and gangue piles, dredge ditches, build flood control ditches, and prevent storms and floods from washing away coal piles and gangue piles.
Hidden dangers found in safety inspection should be rectified and eliminated in a timely and thorough manner in strict accordance with the requirements of "Five Implementations" (measures, responsibilities, funds, time limit and plan).
Third, strengthen emergency measures and increase monitoring.
(a) seriously study and formulate the rainy season "three prevention" emergency plan.
All localities must take the rainy season "three defenses" as the top priority of water prevention and control work, and revise the targeted rainy season "three defenses" emergency plan in strict accordance with the requirements of the "Regulations on Water Prevention and Control in Coal Mines" and the characteristics of safe production in coal mines in our city during the rainy season. The emergency plan should include the leading organization of "Three Preventions" in rainy season, project management plan, inspection and test plan, establishment of emergency rescue team, emergency rescue plan, emergency rescue material reserve, leadership on duty plan, communication methods and safety guarantee measures. At the same time, it is necessary to do a good job in education, training and drills of emergency plans and give full play to the role of the plans.
(two) to strengthen the rainy season "three defenses" emergency management.
All coal mines should further strengthen contact and communication with meteorological, flood control and other departments, timely grasp the flood warning and forecasting information, establish and improve the disaster weather warning and disposal mechanism, do a good job in emergency material reserves, and achieve special inventory and special personnel management. In case of the following dangers, the production must be stopped immediately, and the personnel should be evacuated first, and then the reasons should be analyzed: First, it is located by the river, reservoir or low-lying place during the rainstorm; Second, there is obvious leakage in ditches, rivers, potholes, shafts and subsidence areas. , resulting in abnormal recharge of surface water underground; Third, the underground water inflow suddenly increased and there was an abnormal situation; Fourth, there are other dangers that endanger the safety of underground workers.
(3) Strengthen coal mine safety supervision and inspection.
All units should resolutely overcome paralysis, earnestly do a good job in the supervision and inspection of the "three defenses" work in the rainy season, focusing on the implementation of the "three defenses" work plan in the rainy season, the analysis of water conditions and water disasters, the implementation of various measures, the progress of the project, and the dispatch of duty. During the flood season, we should adhere to the uninterrupted inspection route and carry out regular inspection activities. The Municipal Coal Bureau will supervise the work of "three defenses" in the rainy season of coal mines. Informed criticism will be conducted for coal management departments and coal mining enterprises with poor work, slow action and many problems. At the same time, surface water is a serious threat; The hydrogeological conditions are unclear, and no water exploration and drainage measures have been taken. The design of underground waterproof gates, retaining walls and other water prevention projects is unreasonable, the construction quality is problematic, and other major water disasters have not been effectively prevented. Ordered all mines to stop production and rectify.
The fourth is to do emergency duty to ensure flood control safety.
(a) all departments and units to establish and improve the "rainy season three prevention" scheduling duty and leadership duty system, must ensure smooth communication for 24 hours, to ensure that in case of danger, in accordance with the emergency plan timely response, decisive decision-making, effective response.
(2) The provincial coal mines, county-level coal management departments, Chemei Group and Guantun Coal Mine will report the rainy season "Three Preventions" duty list and contact telephone number to the Municipal Bureau before June 12.
- Previous article:What is the word on the black belt of Taekwondo?
- Next article:The most famous sketch.
- Related articles
- Summary report on carrying out labor competition activities
- Customs and Etiquette in Ancient Cultural Common Sense
- Self-disciplined people are smarter?
? Self-discipline is something that makes people want to cry and laugh. Many people say it's easy, while others say it's difficult. But you know what? Self-d
- What are attributives, slogans, adverbials, predicates, and objects? As in the title
- How can I lose weight? Great gods, help!
- How to organize promotional activities?
- What is the Five Clean-up Action in Xinhua District of Pingdingshan City?
- What is the tabloid content of Beijing Winter Olympics?
- What is the fun of your tour guide Rucheng?
- How to release the remote control of Hongyan Jieshi in the national five-year plan