What are the safety and civilized construction measures?
The full name of safe and civilized construction measures is the cost of safe production and civilized construction measures, which refers to the cost of purchasing and updating construction protective appliances and facilities and improving safe production conditions and working environment in accordance with the current national construction safety and environmental hygiene standards and relevant regulations.
1, environmental protection fees, such as the dust-proof nets we often see in Beijing, and the daily garbage disposal of migrant workers on the construction site.
2, civilized construction measures, I'm afraid the "five certificates and one map" at the entrance of the construction site is familiar, except for first-aid drugs, heatstroke prevention and cooling measures, such as boiling mung bean water, hehe, and the cost of shower and electric fan equipment.
3. Safety construction costs, such as "three treasures": safety helmet, safety belt and safety net, and "four openings": stairs, elevator openings, access openings and reserved holes. The state explicitly prohibits the cost of safe and civilized construction measures as a competitive project.
4. Temporary facilities, such as prefabricated houses, offices, dormitories for migrant workers, canteens, toilets and temporary roads.
- Previous article:What does Xiaohongshu think of the ban?
- Next article:Corporate culture of Xiamen Yashunda International Logistics Co., Ltd.
- Related articles
- What are the possible safety hazards in cleaning snow?
- Repair shop corporate culture slogan
- Eleventh zhangzhou CPPCC time.
- What about a general election in a residential area in Xi 'an, such as a confrontation between the two armies?
- Fast girl slogan
- Home-school cooperation slogan eight characters
- Economic development of Youshan Town
- Raise your eyes and see what it means.
- Summary of five language work plans for 2022
- How to manage the archives?