Summary of supervision monthly report
Inadvertently, the work has come to an end. Looking back on this period, our work ability and experience have all grown, so we need to write a work summary seriously. How to write a work summary to attract more attention? The following is a summary of the monthly supervision report that I have compiled for you. Welcome to read and collect it. Summary of supervision monthly report 1
1. General situation of the project
1. Acceptance scenario (including: household quality inspection scenario and external wall water spraying test scenario);
2, subcontractors approach scenario;
3. Progress scenarios of important nodes.
II. Image progress of this month
1. Image progress of civil engineering;
2. Image progress of installation project;
3. Image progress of landscape engineering;
4. Image progress of fine decoration project.
III. Schedule control
1. Compare and analyze the actual completion scenario and the planned schedule this month, explain the reasons for the schedule differences, and list the measures to be taken; 2. Analysis of the schedule completion scenario and the effect of the measures taken.
IV. Quality control
1. Scenario analysis of project quality this month;
2. Engineering quality control measures adopted this month and their effects.
V. Safety and courtesy construction management
1. General situation of safety and courtesy construction this month;
2. Measures taken against existing problems and their effects.
VI. Project image progress and project payment scenarios
VII. Summary of supervision work this month
1. Comprehensive evaluation of progress, quality, safe and polite construction and other scenarios this month;
2. supervision work situation this month;
3. Opinions, proposals, possible risks and problems that need to be solved by Party A urgently;
4, the focus of supervision work next month.
VIII. Summary of other monthly supervision reports 2
I. Overview of project implementation this month
(1) Basic construction scenarios of this month
1. The former site of the environmental protection building has been demolished and broken.
2. The earthwork excavation of the outpatient building is completed;
3. The house construction waste removal between the outpatient building and the medical technology building is completed.
4. The earthwork excavation between the outpatient building and the medical technology building is about 3%;
5. The hardening of the site is about 8 square meters.
6. There are 49 manual digging piles in the outpatient building, and the * * * is about 1 meters long.
7. The site of the workers' living area is about 1,7 square meters.
Basic scene photos of this month's construction
(picture)
The former site of Yinjiang Environmental Protection Building is ready to be demolished
The former site of Yinjiang Environmental Protection Building has been demolished
The earthwork excavation and face dressing of the outpatient building
The positioning and setting out of the hole pile position of the outpatient building
The manual digging pile excavation of the outpatient building
(2
2. The earthwork excavation of the outpatient building is completed;
3. Demolition of the former site of Yinjiang Environmental Protection Building is completed;
(3) Comparison between the actual progress of the project and the plan this month
1. Due to insufficient preparation for the early commencement, the actual construction progress deviates greatly from the total schedule, and the construction unit has been required to change the construction plan.
(4) Scenarios of the use and re-inspection of engineering materials in this month
1. The sand, stone, cement and steel bar of the hole pile retaining wall of the outpatient building have been witnessed and sampled for inspection;
(5) Comments on the safety production management of the construction unit this month
1. This month, the construction unit carried out safety management and deployment work such as on-site material stacking, investigation of temporary electricity consumption, sanitary cleaning of roads, follow-up of border protection, and safety technical disclosure of shift workers.
2. In the production process, the construction unit still has some safety problems, such as lack of border protection, too few site signs and signs, inadequate hole pile protection, confusion of temporary power lines, etc. In view of the hidden safety problems raised by the supervisor, the construction unit is required to make rectification in the form of oral or written notices and inspection records, and the basic rectification is put in place, and the safety is under control, and no safety accidents have occurred.
(6) Acceptance scenarios of sub-projects and sub-projects this month
Sub-projects acceptance:
None
Sub-projects acceptance:
None
(7) Project quality scenarios this month
The comprehensive review of the construction quality in this period is average, and the main construction acceptance data include hole-hole pile excavation, hole-hole pile retaining wall construction acceptance, pile location review and restoration of the original landform of the building. During the construction process, the supervision department strictly required the construction unit to implement the inspection application system, and the construction unit was basically able to perform it in place, and the problems raised by the supervision department were rectified in time. Typical safety and quality hazards during construction are as follows:
1. The excavation thickness of the first section of pile 51# is inconsistent with the design documents, and the retaining wall reinforcement is not set;
the excavation thickness of the retaining wall in the fourth section of hole piles 2, 58# and 95# is inconsistent with the design documents, and the retaining wall reinforcement is not set;
3. In the field operation of some hole piles, cement, sand and stone were not mixed according to the requirements of the mixture ratio, and pouring was started without uniform mixing. The operation was extremely irregular, which led to the extremely low strength of the completed retaining wall and failed to reach the c35 strength specified in the design.
4. According to the data shown in the geological survey report, after the excavation of silty clay and miscellaneous fill, the lower head is a pebble layer with a depth of more than 7m, and there is water in the corresponding part, and the pebble is in a plastic state. If the thickness of the retaining wall and the reinforcement in the hole are not constructed according to the design requirements, the hole is prone to collapse.
The above problems are timely notified to the construction unit for rectification during the construction process, which reflects the supervision's control in advance and in the process; Issue the supervision notice or acceptance record in time for the questions raised, requiring the construction unit to rectify, and the construction unit has basically completed the rectification, and the construction quality of the next working procedure will be under control only after the re-inspection.
II. Work scenarios of supervision this month
(1) Work scenarios of progress control
1. Hold regular supervision meetings to coordinate the problems that affect the construction progress in the construction, and coordinate relevant units to solve them in time to ensure the smooth progress of the construction period.
2. patrol the site every day, check the progress situation of each part of the construction unit, the input situation of people, machines and materials, compare whether it can meet the requirements of construction progress, and remind the construction unit to increase the supply of construction personnel or materials in time.
3. Coordinate and solve related problems that affect the construction progress in the construction process, sign supervision opinions on technical negotiation and work contact list in time, and solve them as soon as possible, so as not to delay the construction period.
(2) Work scenarios in quality control
1. Conduct patrol inspection on the construction site, and conduct on-site supervision on key working procedures, key parts and key control points. Timely correct illegal operations and eliminate quality hazards. Follow up the quality problems, and send them to the construction unit in the form of supervision notice and inspection record to ask them to make rectification and verify the correction effect.
2. The construction unit shall be strictly required to implement the system of submitting for approval and inspection, and the materials shall be submitted for approval in time when they enter the site. Only after passing the examination by the supervision engineer can they be used in this project to ensure that the quality of construction materials meets the design and specification requirements.
3. According to the inspection records of concealed works submitted by the contractor, the supervision engineer will conduct on-site inspection and verification, and the qualified works will be signed and recognized, and the next working procedure will be allowed. The unqualified works will be rectified within a time limit, and the inspection will be re-submitted after passing the inspection.
scene of reinforcing bar binding for hole pile retaining wall of outpatient building
The hole pile retaining wall of outpatient building has been poured
4. Hold regular supervision meetings, and report the quality hidden dangers and typical problems existing on site at the regular meetings to remind the construction unit to rectify, and pay attention to avoid similar scenes in construction, do a good job in technical disclosure in security team, improve the awareness of quality control, and ensure the construction quality meets the design and specification requirements.
5. Conduct on-site patrol every day, and connect with the construction site management personnel in time if any hidden danger is found, so as to ensure that the quality hidden danger is eliminated in time once it is found, and record the supervision log truthfully.
6. The supervision department shall organize a joint inspection on site safety and quality every week, truthfully fill in the safety and quality problems existing in the site, and send them to the construction unit for rectification in the form of inspection records. If the rectification is qualified, it shall be reported to the supervision department for review in writing, so that the problems existing in the site can be eliminated in time and the quality and safety hidden dangers can be eliminated.
(3) Work scenarios of safe production and polite construction management
1. Supervise the construction unit to establish and improve the safety management system and safe operation procedures, strengthen the on-the-job education and training of construction personnel according to the characteristics of the project, and improve the safety production awareness of construction personnel.
2. Check and urge the construction unit to implement the safety protection measures for the division, subdivisional work or each working procedure and key parts in accordance with the technical standards and specifications for building construction safety.
3. The personnel of the supervision team patrol and inspect the construction site every day. In view of the potential safety hazards found in the construction, they will promptly send them to the construction unit in the form of notices and inspection records, requiring rectification and implementation. On-site inspection of safety problems will be sent to the construction unit in written form, and the supervision unit will supervise the construction unit to carry out rectification, and eliminate hidden dangers by more than 95%.
4. Supervise and inspect the construction unit to do a good job of safety identification, and the signs should be hung in an eye-catching position.
5. Hold regular supervision meetings, raise safety hidden trouble issues at the regular meetings, supervise and urge the construction unit to carry out rectification, and remind the construction unit of the safety technical disclosure of hidden trouble matters and unsafe behaviors in the process, so as to ensure safety in production.
Hold a regular meeting of supervision
Hold a regular meeting of supervision
6. Review the construction scheme of the dangerous partial projects and the qualified personnel of subcontractors and other relevant information reported by the construction unit, put forward the problems existing in the scheme, and ask the construction unit to supplement and improve it to ensure the guidance, operability and pertinence of the scheme.
Supervision review opinions of subcontractors
Supervision review opinions of special construction scheme of manual digging piles
7. Supervise the construction unit to educate and train new workers, and do a good job in pre-shift disclosure, safety technical disclosure and three-level education, so as to improve the awareness of production safety and avoid safety accidents.
supervise the construction unit to carry out pre-shift education
supervise the construction unit to carry out safety technical disclosure
(4) work scenarios in engineering measurement and payment of project funds
1. Make corresponding original records and keep original visa information to avoid the phenomenon of no measurement or visa in the future, such as buck passing.
(5) Management of other matters in the contract
1. The construction pricing part on page 3 of the contract states that our price includes RMB 4,526,869.82 after the preliminary temporary construction audit. After the contractor enters the site, both the contractor and the contracting party * * * will determine it according to the actual amount and the market price. For this part, we have not seen any written transfer information, and we are not clear about the audit of the post-audit pricing quota.
2. The demolition of the former site of Yinjiang Environmental Protection Building is not within the scope of our company, and it is an additional information in the contract. Now that Yinjiang Environmental Protection Building has been demolished, please ask the project management company to coordinate the construction unit to provide the basic information and work instructions for the demolition part, so as to make the follow-up work progress smoothly.
III. Analysis and treatment scenarios of major problems in project implementation this month
(1) Analysis and treatment scenarios of major problems in project progress control
1. The outpatient building, the medical technology building and the inpatient building are undergoing earthwork excavation. According to the existing blueprints and temporary drawings,
it is still impossible to accurately determine the scope of the basement and the excavation elevation of the foundation pit, among which the elevation of the inpatient building in the temporary drawings is
wrong, and it is hoped to be issued as soon as possible.
2. At present, due to the limit of the spoil ground, it is difficult to spoil the soil, which can't meet the schedule requirements of this project,
resulting in extremely low efficiency. Due to the huge amount of earthwork backfilling in the later period, it is necessary to ask the headquarters to negotiate a temporary dump. First, it will alleviate the difficulty of slow excavation and excavation. The second is to use
soil as preparation for backfilling.
3. The number of staff in the hole pile team in the outpatient building is relatively small, so the construction unit has been asked to send more staff and allocate them to weekly and daily according to the monthly progress plan
;
The above problems are the main factors that affect the progress, and are being dealt with at present. (2) Analysis and treatment scenarios of major problems in engineering quality control
During the construction this month, the following quality hidden dangers were found through daily inspection, parallel inspection and process acceptance by the supervisor, and at the same time, the following problems were communicated with the quality management personnel and technical leaders of the construction unit orally or in writing in time, demanding to strengthen quality control, strengthen team disclosure and rectify relevant hidden dangers in time. After supervision and tracking in the process, the following problems have basically been rectified.
1. The thickness of retaining wall of some hole piles and the number of steel bars are not constructed according to the design requirements;
2. The information in the early stage of construction is not in step with the construction progress;
3. recheck the positioning of the hole pile in the outpatient building, and the deviation is within the specification and meets the requirements;
4. According to the requirements of design documents and specifications, in order to ensure the verticality of the pile, the center position and verticality of the hole pile in the outpatient building, which is more than 3m, should be checked once after the third section of retaining wall is poured, and the deviation is within the specifications.
the above problems are all related quality problems in the current construction, and the supervision department requires the construction unit to make rectification orally or in writing, and the rectification has been completed, and the quality is under control.
(3) Analysis and treatment scenarios of major problems in safety production and polite construction management
Safety production and polite construction management mainly have the following hidden dangers in safety production and polite construction this month. When they are discovered, they should be connected with the safety management personnel of the construction unit in time, and the hidden dangers should be eliminated in time to ensure safety production. The following typical problems are put forward in view of safety problems:
1. Establish a guard system to prevent passers-by from entering by mistake and achieve fully enclosed management. The hole formed by enclosure construction shall be closely protected in time; The limb protection that has been erected around the foundation pit on the construction site is not perfect in some places, and the federated eye network is not hung;
2. TN-S system with three-phase and five-wire system should be adopted for temporary electricity utilization on the construction site;
3. Safety warning signs and slogans around the foundation pit on the construction site, as well as fire-fighting equipment in the office area and living area are not arranged.
4. according to the clear requirements of the six provisions of the enterprise safety production risk announcement issued by the state administration of work safety, production and operation.
- Previous article:Ultra-high face value+hard core strength
- Next article: Beauty's vitality integration system is lightly loaded, overweight and young.
- Related articles
- Archives Day Promotional Activity Briefing
- What are the ways for owners to protect their rights, and which forms are not desirable?
- What is the new growth point of the deep integration of artificial intelligence and real economy?
- What are the world-famous gangs?
- What conditions does Jining rencheng district deed tax subsidy need?
- What are the good cases of rural revitalization?
- What is the origin of Tomb-Sweeping Day's eating cold food?
- Inspirational poems for high school entrance examination are domineering and powerful
- How can we lose weight effectively?
- Community safety hazard investigation report