Joke Collection Website - Bulletin headlines - Commitment letter for engineering construction safety
Commitment letter for engineering construction safety
In the rapidly developing society, we are all directly or indirectly related to the commitment letter, which is a product of standardizing oral commitment in writing. There are many points for attention in the letter of commitment. Are you sure you will write it? The following are five engineering construction safety commitments I have collected for reference only, hoping to help you. Commitment letter for engineering construction safety 1
In order to conscientiously implement the Fire Protection Law of the People's Republic of China, the Regulations on Fire Protection in Guizhou Province and the Technical Specification for Fire Safety at Construction Sites, and implement the fire safety responsibility system of our unit to ensure fire safety, our unit solemnly promises to the construction unit as follows:
1. Strictly implement the fire safety system at construction sites, clarify the responsibilities of fire protection organizations at all levels, and implement the fire safety responsibilities step by step.
2. To ensure that the personnel, measures and funds are "in place" for the fire hazards found by fire control institutions of public security organs at all levels in fire control supervision and inspection and self-inspection by units, and make timely rectification in strict accordance with the prescribed time limit;
3. Configure fire-fighting equipment in strict accordance with regulations, set up temporary fire-fighting facilities, specify the maintenance and management of special personnel, ensure that the fire-fighting facilities, equipment and fire safety signs are in good condition and effective, ensure that the fire-fighting distance between temporary houses and temporary facilities, temporary fire rescue sites and fire water sources meet the requirements, and ensure that temporary fire lanes, temporary evacuation passages and safety exits are unobstructed, and ensure that the combustion performance of building components of temporary houses with high fire risk is Grade A;
fourth, strengthen the fire inspection on the construction site of the construction project, determine the fire inspection personnel, inspection content, location and frequency, and fill in the inspection records. Implement 24-hour key monitoring on the parts prone to fire accidents;
5. Organize employees to carry out fire fighting common sense training and fire fighting skills training on a regular basis, so as to improve employees' awareness of fire fighting safety and self-prevention and self-rescue ability, and ensure that every employee is familiar with the "three understandings and six skills" (i.e., knowing the dangers of fire, fire fighting methods and fire prevention measures; Can call the police, can use fire extinguishers, can escape from fire) and the common sense of fire safety in this position, and the fire training and education rate of employees reaches 1%. Organize relevant personnel to conduct fire inspection on temporary buildings and
temporary facilities on the construction site on a regular basis, and rectify the found fire hazards in time;
VI. Ensure that all personnel engaged in electric welding, gas welding and other operations with fire hazards hold relevant certificates, strictly implement on-site guardians and safety measures before hot work construction, and go through hot work approval procedures in accordance with relevant regulations;
VII. Strictly formulate fire fighting and emergency evacuation plans according to the actual situation of the construction site, and carry out targeted fire drills at least once a month;
VIII. Our unit voluntarily accepts the supervision of the public, and does a good job in fire control in strict accordance with relevant fire control laws and regulations and Technical Specification for Fire Safety in Construction Sites. If there is any violation, our unit will bear relevant legal responsibilities according to the relevant provisions of the Fire Protection Law of the People's Republic of China and the Fire Protection Regulations of Hebei Province;
IX. Our unit solemnly promises to strictly abide by fire laws and regulations during the project construction process, especially during the summer vacation and the 18th National Congress, and earnestly carry out safety self-inspection, self-elimination of hidden dangers, self-responsibility, acceptance of supervision, and resolutely prevent influential fire accidents.
Commitment unit and person in charge of fire control:
Letter of Commitment on Project Construction Safety on
Contractor: IDNo.:
In order to implement the policy of "safety first, prevention first", clarify the safety responsibilities of both parties and ensure the safety of people, power grid and equipment during construction, Party A and Party B signed this agreement through consultation in accordance with relevant national laws and regulations.
Article 1 Party A's safety responsibilities
1. Before the commencement of construction, Party A shall make technical disclosure on construction safety to the contractor, and shall have written records or materials.
2. Party A shall require the contractor to formulate construction safety measures and report them to Party A for the record before starting construction.
3. Party A has the obligation to assist the contractor in safety production, fire prevention management, supervision and inspection. Party A has the right to inspect and urge the contractor to implement the relevant work regulations on safety production, stop and correct the contractor's behavior that does not conform to the safe and civilized construction, and make a phone call or oral safety rectification until it is retired.
4. Party A appoints Comrade Zhou Jidong to be responsible for contacting the contractor for work safety.
5. Party A has the right to conduct a sampling test on the safety technical knowledge and safety work procedures of the contractor's personnel involved in the construction.
6. Party A has the responsibility to investigate and report the accidents of Party A's power grid and equipment during the construction. In case of any serious accident specified in the Interim Provisions on Investigation Procedures for Extraordinary Serious Accidents of the State Council during the construction, Party A has the right to urge the contractor to immediately notify the local government and public security department and request to send someone to protect the site; And have the right to require the contractor to provide written conclusions and handling opinions on accident investigation.
7. The contractor shall bear the liability for breach of contract due to the following circumstances:
(1) personal injury or death;
(2) construction machinery and main production equipment are seriously damaged;
(3) fire accident;
(4) Violating regulations or taking risks and not listening to advice;
(5) The construction site is dirty, disorderly and poor, which cannot meet the requirements of safe and civilized construction.
article 2 contractor's safety responsibility
as the contractor of the project, he shall be responsible for the safety of personal injury and equipment damage accidents that occur during the construction. The contractor shall earnestly perform the following safety responsibilities:
1. Relevant qualification certificates required for contracted projects provided by the contractor: construction capability certificates and historical performance materials shall be true, legal and effective.
2. The contractor must implement the national laws and regulations on safety in production, and must formulate the corresponding safety management system; Strictly implement the Electric Power Safety Work Regulations, Electric Power Construction Safety Work Regulations, Typical Fire Protection Regulations for Electric Power Equipment and other relevant electric power production regulations.
3. On-site construction shall comply with national and local laws, regulations and rules on labor safety and labor employment to ensure the legality of employment. The contractor must, according to the relevant provisions of the state, carry out personal insurance for the construction personnel and equip them with qualified labor protection articles and safety appliances.
4. During the construction period, the contractor shall have full-time safety supervision personnel (those with less than 3 employees shall have part-time jobs). The contractor appointed as the contact person for safety work.
5. In all construction activities, the contractor must prepare safety construction measures, and conduct comprehensive safety technical disclosure to all construction personnel before construction, and implement it correctly and completely in the whole construction process. Construction is strictly prohibited without measures or disclosure.
6. The quantity and quality of the construction machinery, instruments and safety protection appliances used by the contractor for this project must meet the construction needs, and they are inspected by qualified inspection units to meet the safety regulations. The contractor shall be responsible for personal injury and equipment damage caused by improper use of instruments and instruments.
7. Before starting work, the contractor shall organize all the construction personnel to carry out safety education, and report the list of personnel participating in safety education (including temporary additions or replacements) to Party A for the record. Special operations personnel must have qualified and effective qualification certificates issued by relevant departments.
8. Before starting work, the contractor shall provide Party A with a list of construction personnel, a copy of ID card and a one-inch photo, and handle the construction personnel pass at the same time.
9. Before starting work, the contractor shall organize personnel to inspect the construction area, working environment and the facilities, equipment and tools provided by Party A to confirm that they meet the safety requirements. Once starting work, it means that the contractor has confirmed that the construction site, working environment, facilities, equipment and tools meet the safety requirements and are in a safe state.
1. The contractor shall install temporary fences or warning signs within the construction scope, and shall not go beyond the designated construction scope for construction, and irrelevant personnel are prohibited from entering the construction site. Without Party A's consent, the contractor shall not enter the place unrelated to the construction without authorization and use Party A's facilities and equipment unrelated to the construction; Party A's protective facilities and signs shall not be dismantled or changed without authorization.
11. If the contractor needs to use electricity and water in the construction process, he shall contact Party A in advance, and shall not connect the temporary power cord, bare wire or directly on the power socket or use the electric stove. Interrupt the operation or cut off the relevant switch immediately in case of failure.
12. During the construction, the contractor shall finish the work, use all materials and clear the site to ensure safe and civilized construction.
13. The contractor must accept the supervision and inspection of Party A, and promptly rectify the safety rectification opinions put forward by Party A.
14. In case of personal injury, power grid and equipment accidents or unsafe conditions endangering production and operation during the construction, the contractor shall immediately report to Party A and actively cooperate with the investigation. The contractor shall submit the accident investigation report of the accident investigation team and the contractor's accident handling opinions to Party A for the record.
15. The contractor shall not employ the mentally ill, the stupid, the reform through labor, the reeducation through labor, the juvenile delinquent, the probation, parole, execution outside prison, bail pending trial, medical parole, criminal detention and other personnel to enter the campus construction.
16. The contractor shall put an end to uncivilized phenomena such as being shirtless and barefoot in the construction, and the construction personnel shall do a good job in personal hygiene, and shall not be unkempt or urinate anywhere.
17. The contractor is forbidden to smoke in the construction site. Once found, Party A has the right to punish the construction personnel and the construction director.
article 3 contact information and response time of party a and party b: party a and party b shall deliver it to each other in written or oral form such as work contact sheet and telephone. Upon receiving the written contact from the other party, both parties shall respond within 4 hours.
article 4 construction safety deposit
party a reserves 1% of the project payment as the contractor's safety deposit. The contractor shall return the deposit in full after the completion and acceptance of the project without serious personal injury, power grid and equipment accidents or above; In case of any of the following safety accidents for which the contractor is responsible during the construction, the corresponding amount of safety deposit shall be deducted:
(1) In case of personal death accident, major accident of power grid and equipment, all safety deposit shall be deducted;
(2) 5% safety deposit will be deducted in case of personal injury accident, power grid and equipment accident;
(3) the economic penalty for the illegal behavior of the contractor's personnel shall be deducted from the security deposit according to the penalty regulations.
article 5 liability for breach of contract
1. if the other party or a third party suffers personal injury, equipment damage and other property losses due to the contractor's responsibility, the contractor shall bear the corresponding responsibilities and compensate the other party or the third party for all the losses caused thereby.
2. in the performance of the contract, if it is found that the relevant qualification materials provided by the contractor are invalid, party a has the right to terminate the contract, and the contractor shall bear all losses caused thereby.
3. if the contractor's on-site operators are found to have violated the rules, the amount of money that should be deducted from Party A's employees for similar violations shall be taken according to Party A's relevant regulations on rewards and punishments for production safety, and the corresponding liquidated damages shall be borne.
4. if the contractor fails to set up safety supervision personnel, correctly and comprehensively implement safety technical measures, construction organization design, and construction personnel fail to master the characteristics of this project and construction safety measures, and the construction machinery, instruments and safety protection articles used in this project do not meet the construction needs, Party A has the right to require the contractor to stop work immediately for rectification, and the consequences and losses arising therefrom shall be borne by the contractor.
5. If the safety work procedures of the contractor's personnel are unqualified, the contractor shall bear the liability for breach of contract of 5 yuan/person-time; The contractor who works without a license for special personnel shall bear the liability for breach of contract of 1 yuan/person-time.
6. if the contractor uses the facilities, equipment and tools provided by party a to cause damage, it shall compensate according to the price.
7. If the contractor's personnel go to places outside the construction area without reason or use Party A's facilities and equipment without authorization, the contractor shall be liable for breach of contract according to the number of people from 1 yuan to 5 yuan.
8. If the contractor fails to rectify the safety rectification opinions put forward by Party A in time, the contractor shall be liable for breach of contract according to 2 yuan to 1 yuan/day for each overdue day.
9. In case of personal injury or death, power grid and equipment accidents and concealment during construction, in addition to being handled by relevant government departments, the party at fault shall bear the liability for breach of contract of 3, yuan to 1, yuan/time.
article 6 in case of any dispute during the execution of this agreement, both parties shall settle it through negotiation and mediation; If no settlement can be reached through negotiation or mediation, either party may bring a lawsuit to the Tianhe District People's Court in Guangzhou.
article 7 both parties must strictly implement this agreement, and the legal effect of this agreement is independent of the main contract.
article 8 validity period of this agreement: from (year) to (year)
article 9 this agreement shall come into effect after being signed and sealed by the legal representatives or entrusted agents of both parties.
article 1 this agreement is made in quadruplicate, with each party holding two copies.
The following seven items in Article 11 are annexes to this agreement:
1. Relevant qualification certification materials of contractors required for contracted projects;
2, the contractor construction safety technical organization measures;
3, the contractor's special operations personnel qualification certificate;
4. Project construction organization design prepared by the contractor;
5. Records of construction safety technical disclosure of Party A and Contractor. Project construction safety commitment letter 3
Name of the project:
Team where the project is located:
Construction site:
Project planned duration: year month day to year month day
Construction unit:
In order to strictly manage the safety, quality, progress and cost of the project, supervise the whole construction process and strictly control the quality of the project to ensure it.
1. Before the project starts, the construction report and safety technical measures for the project construction must be handled, and the project can only be started with the consent of the leaders in charge of the production department, the safety supervision department and the center and the approval of the manager.
2. During the construction of the project, do a good job in site safety in strict accordance with the requirements of safety technical measures. If the construction is not carried out according to the measures, the site leader of the construction unit has the right to immediately stop the construction and make rectification within a time limit, and can only resume work after on-site inspection by relevant personnel until it is qualified.
Third, the operators of special types of work must hold valid certificates issued by relevant units.
4. You must have a letter of introduction issued by the center to enter the key parts of the five pipes, such as the pool and the pump room. (The letter of introduction should indicate the reason for entry, the name of the person entering, the provincial certificate number, the name and contact information of the person in charge of the site)
5. When there is waste material recycling in the project construction, the construction unit shall be responsible for recycling it and return it to the construction unit in full, and the central material supply department shall be responsible for unified recycling. The construction unit shall not dispose of it at will.
VI. The person in charge of site safety of the construction party has the responsibility to check the safety of the construction site, and immediately rectify any hidden danger.
seven, team site representatives have the right to the safety and quality problems existing in the construction process, should be timely.
- Related articles
- Do you use phonetic symbols in first grade English?
- Characteristics of the armed workers team
- Jiangsu and Zhejiang tourism arrangements
- Aesthetic sentences about forest fire prevention
- What avatar does Xueba usually use?
- The sunset dyes half the sky red.
- Are red ants poisonous? I was bitten.
- The atmosphere in the company team is very boring. How can it be improved?
- How to teach children to understand useful slogans on the roadside in a fun way?
- An activity plan with the theme of Young Pioneers