Provisions on safety management of prefabricated buildings
Provisions on safety management of prefabricated houses Article 1 In order to strengthen the construction of prefabricated houses on construction sites in our city (hereinafter referred to as? Mobile home? ) safety management, to prevent accidents, according to the "People's Republic of China (PRC) Construction Law", "People's Republic of China (PRC) Safety Production Law", "People's Republic of China (PRC) Product Quality Law" and "People's Republic of China (PRC) Standardization Law" and other laws and regulations, these provisions are formulated.
Article 2 The use or construction of mobile homes on construction sites within the administrative area of this Municipality must abide by these provisions.
Article 3 The mobile houses used in the construction site must meet the requirements of strength and stability, ensure structural safety, and have the ability to defend against strong typhoons, rainstorms, snowstorms and lightning strikes. At the same time, it should meet the requirements of civilization, hygiene, fire protection, environmental protection and use function.
Article 4 Before the mobile home is built, the user unit shall, together with the construction unit, go to the site for investigation, and determine the building location, scale, quantity and type of the mobile home according to the site conditions, project scale and the number of construction personnel during the peak period, and make planning and design.
Fifth units to buy mobile homes, should choose a legitimate manufacturer with high product quality and good corporate reputation.
Sixth mobile home production enterprises must organize production in accordance with relevant national laws, regulations and standards, and the standards implemented shall be reported to the local quality and technical supervision department for registration.
Seventh mobile home production enterprises in the provision of mobile homes, but also must provide product warranty, certificate, installation instructions, main raw materials and parts list and quality certificate.
Article 8 Roof truss, wall column, steel beam, etc. The bracket of trailer should be safe and reliable, and other materials should be firm and durable to meet the requirements of bearing capacity. Materials prohibited by relevant departments shall not be used to build mobile homes. The overall structural bearing capacity and stability of the trailer should meet the requirements of not being affected by the storm.
Ninth mobile home installation units should be installed in strict accordance with the requirements of the installation instructions, each program should be self-checked, and make records, the program acceptance is not qualified, are not allowed to enter the next installation program. It is strictly prohibited to illegally install and use units to install without authorization. After the installation is completed, the installation unit shall conduct self-inspection, and the technical director of the installation unit shall sign the opinions and affix the official seal of the legal person before providing them to the users? Mobile home certificate? . The user shall conduct overall acceptance, and it can only be used after it is qualified and signed by both parties.
Tenth mobile homes used for work and life, in principle, only allowed to build a single floor, the length shall not exceed 30 meters (8 rooms), and the number of people in each dormitory shall not exceed 8. The trailer should be equipped with fire-fighting equipment that meets the fire-fighting requirements.
Eleventh due to special reasons, the need to build a double trailer, must comply with the "code for load of building structures" GB50009? 200 1, with a length not exceeding 22 meters (6 rooms). At the same time, according to the actual situation, it is necessary to embed anchor bolts (steel) and other connecting wall columns, and fix the trailer as a whole with steel pipes to reinforce the trailer. An installation plan must be made for the installation of the double-decker trailer. The scheme should be signed and approved by the user and the technical director of the installation unit, and reported to the local construction safety supervision station for the record. It is forbidden to set up double-deck mobile homes along rivers (lakes) and in wilderness areas.
Twelfth users should strengthen the inspection of mobile houses after learning the forecast of strong typhoon, rainstorm, snowstorm and lightning strike, and take preventive measures to actively defend and reduce the losses caused by bad weather.
Thirteenth after the completion of the project, the user should repair the trailer, check and test the safety performance of the roof truss, wall column and steel beam, derust and paint the metal structure, and make records to ensure the safety and integrity of the next use.
- Related articles
- Spring outing sentences of kindergarten children
- What festivals are there throughout the year?
- Model employee safety responsibility book?
- What will happen if the plastic surgery hospital is investigated by the health and health commission?
- Protect water resources, save resources and protect the environment.
- English translation of Confucius' thoughts ~! ! ! !
- Urgent! ! ! ! ! ! ! There is a campus talent show event, which is similar to American Idol. It is aimed at people on campus. I am asking for your creative ideas.
- I want to find a funny script about dormitory life. I hope it is original.
- Unforgettable military training excellent composition
- What do you mean by learning state and adjusting state? Thank you, everyone.