1. Key points of construction site safety inspection

1. Construction site wall: closed with hard materials or brick masonry (the wall height is 2.5m in main urban sections and 2.5m in general sections) 1.8m.) The wall should be plastered and whitewashed to make it solid, stable, clean and beautiful. Brick enclosures must have wall caps and promotional slogans on the walls. No materials or soil are allowed to be piled against the wall. Colored profiled steel plates can be used if conditions permit.

2. Construction site gate: Set up gate stacks and gates. There should be a light box on the top of the door with the name of the company and the name of the project. The guard room should have a guard system. Signs saying "This is a construction site, no idlers are allowed to enter" and "At the construction site, you must wear a safety helmet." are placed at the gate. There are seven pictures and three plaques hanging inside the door.

3. Construction site floor: Hard floor with good drainage (the main road inside the hardened site should not be less than 20 meters, and the main road outside the site should not be less than 5 meters) and equipped with a flushing station.

4. Personal protection: Wear a safety helmet and fasten your seat belt. The seat belt should be hung high and used low. The "three treasures" must have a production license, product certificate, and quality inspection certificate.

5. On-site access: A protective shed is erected at the access entrance, the shed is wider than the crossing, and the roof of the shed is covered with scaffolding boards. The length of the shed must be greater than 3m; the building height above 24m shall be equipped with double-layer protection, the interval shall not be less than 60cm, and the length of the shed shall be more than 10m.

6. Elevator wellhead: Set up a fixed gate or double guardrail with a height of not less than 1.2m (one each for 60cm and 120cm), and a flat net every 10m in the elevator room.

7. Edge protection: Edge facilities such as balconies, roofs, floors, stairs, unloading platforms, etc. should be equipped with two protective fences with a height of 60cm and one with a height of 120cm. Columns should be set up if the spacing is greater than 2m.

8. Scaffolding: It is strictly forbidden to mix steel and wood when selecting materials. The materials must meet the standards. The scaffolding has not been dismantled and digging foundations on the side is not allowed.

9. Reserved openings: Openings larger than 25cm should be protected with fixed covers, and openings larger than 50cm should be surrounded by two horizontal railings with a height of not less than 1m. In addition to two horizontal railings for openings larger than 1m, a safety flat net must also be installed below the opening.

10. Dangerous areas: Danger signs such as "Prohibition" and "Warning" should be hung in dangerous areas at on-site operations.

11. Stacking of materials: neatly classified and stored, with labels and site planning drawings.

12. Gas cylinder storage: Oxygen bottles and acetylene bottles should be kept more than 5m apart and 10m away from open flames. They should not be exposed to the sun and acetylene bottles should not be placed flat.

13. Construction pits: When the depth of the excavation pit (trough) exceeds 1.5m, it must be sloped or reliable support must be added. When it exceeds 2m, two guardrails must be installed around it, with a height of 1.2m. The distance between poles should not be greater than 2m, and the upper and lower passages must be stable and non-slip. It is not allowed to pile soil, stack materials or park machinery within 1m of the edge of the pit (trough).

14. Project licenses: business license (original and duplicate), enterprise qualification (original and duplicate), safety license (original and duplicate), safety qualification certificate of the enterprise legal person, the responsible safety leader, and the enterprise safety person in charge, Safety management network diagram, safety production guarantee system, safety production responsibility system at all levels, safety production responsibility certificate (signed step by step until the worker), project department full-time safety officer qualification certificate and employment situation, team safety officer employment situation, relevant safety production information Documents, plans, etc.

15. On-site fire prevention: Fire-fighting equipment must be installed on the floors of the carpentry room, canteen, dormitory area, and work area, and no smoke and fire signs must be hung in dangerous places.

16. Living logistics: No one is allowed to live in the project under construction. Urinals are provided in high-rise buildings. Open defecation is strictly prohibited. Clothes are not allowed to dry on scaffolding or wires. The on-site canteen must comply with regulations. Operators must have physical examination and health certificates. Raw and cooked food must be separated. The canteen must have screen windows, screen doors, screen covers, health permits, and a health responsibility system.

Key points for enterprise safety information inspection

1. Enterprise safety production license (original and duplicate);

2. Enterprise safety production management responsibility system;

p>

3. Enterprise safety production rules and regulations;

4. Enterprise safety production operating procedures;

5. Enterprise safety production management leading group, organizational structure and staffing situation ;

6.. Information related to safety assessment of "three categories of personnel";

7.. List and management of special operations personnel;

8.. Enterprise safety Proof of payment of production risk deposit;

9. Information related to the payment of work-related injury insurance and accidental injury insurance;

10. Production safety investment list and related bills;

11. Special construction plan approval and expert demonstration materials;

12. Enterprise safety production education, training files and related materials;

13. Enterprise safety production inspection data;

14. Enterprise production safety accident emergency rescue plan and drill-related records;

15. Enterprise production accident ledger and accident-related information;

16. Mechanical equipment management information ;

17. Relevant information on the enterprise’s management of subcontracting units and supply units;

18. Relevant information on the management of labor protection supplies and the prevention and control of occupational diseases;

19. Relevant information on the identification, evaluation and control of hazardous sources;

20. Relevant information on the implementation of documents and notices issued by competent authorities and formulated by enterprises themselves;

21 .Other relevant information.

Key points for on-site safety information inspection

22. Copy of enterprise safety production license, enterprise legal person, enterprise manager, production manager, safety department (section) chief, project manager, project full-time Copy of safety officer's assessment certificate;

23. Enterprise safety management rules and regulations;

24. Operating procedures for various types of work;

25. Employee casualties Monthly report form, work injury accident registration form, some relevant records of work injury accidents, accident and incident statistical ledgers, work injury accident reports, work injury accident files, work injury accident handling records;

26. Handle documents related to accidental injuries ;

27. On-site safety input ledger and copy of shopping receipt;

28. Safety production education and training, employee annual training plan, list of trained personnel, training ledger and training records ;

29. Third-level safety education record card for new workers, records of education content, examination papers for division of labor;

30. List of special operations personnel, copy of special operation operation certificate

31. Construction organization design, special construction plan;

32. Expert demonstration and review plan and demonstration review report

3. Safety sign plan, Drainage plan;

34. List of major hazards at the construction site;

35. Safety inspection records;

36. Accident hazard notice;

37. Temporary power organization design, safety technical briefing, and acceptance records;

38. Ground resistance test records, leakage protector test records, and electrician inspection records;

39 ."Three treasures" and "four mouths" protection, safety helmets, seat belts, safety net certificates, and test reports;

40. Safety technical disclosure and acceptance records;

41. Basic Pit support plan, safety technical briefing, acceptance record, monitoring or observation record;

42. Scaffolding construction plan, erection safety technical briefing, acceptance record (layered acceptance), demolition safety technical briefing;

42. p>

43. Formwork project construction plan, support erection safety technical explanation, formwork acceptance record (layered acceptance), concrete strength report, formwork removal safety technical explanation;

44. Tower crane Special construction plans, installation safety technical disclosures, acceptance records, and dismantling safety technical disclosures;

45. Safety technical disclosures, acceptance records, and maintenance records of construction machinery and tools;

46. Hoisting construction plan, safety technical briefing, and acceptance record;

47. Material hoist construction plan, safety technical briefing, and acceptance record;

48. External elevator installation plan, Safety technical disclosure, acceptance records, inspection records, and demolition safety technical disclosure;

49. On-site emergency plans, emergency drill records, emergency situation (accident) handling records;

50. Labor insurance Procurement plan, issuance ledger, certificate, test report (or record) of supplies;

51. Violation handling records (copy of bill attached);

52. Fire Approval procedures;

53. Relevant documents and implementation information issued by the competent authorities and enterprises;

54. Other safety management information (safety management agreement, subcontracting team safety management agreement (including documents, notices, meeting minutes, safety supervision procedures, etc.) related to production safety.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd