How to be a good representative of Party A in water conservancy projects?

From the preliminary design, construction management and completion acceptance of water conservancy projects, the role of construction links can not be underestimated. Therefore, the selection of Party A's representative is particularly important, and whether the personnel selection is appropriate is of great significance to the smooth completion of the project and the best construction effect. In my opinion, to be a qualified representative of Party A of water conservancy projects, one must have the following basic qualities.

1 Professional level and comprehensive quality

1. 1 professional technical knowledge

Party A's representative of water conservancy project must have the following two basic skills: First, he must be familiar with the design specifications of general water conservancy projects and be able to read construction drawings. Respond to all kinds of problems raised by the construction party in time, and give corresponding countermeasures and suggestions. Only when the representative of Party A takes control of the overall situation can he win everyone's respect, which invisibly improves the cooperation of construction and is very beneficial to the development of the project. Second, be familiar with the construction process and method, stop the process omission and process inversion in the construction, give correct guidance, ensure that each project can be completed with good quality and quantity according to the design scheme, and give full play to its due engineering benefits. It can be seen that solid professional and technical learning experience, persistent study, hard work and rich construction experience are the necessary conditions for a qualified representative of Party A. ..

1.2 comprehensive quality

Comprehensive quality, in other words, comprehensive coordination ability. It mainly includes the coordination among the construction unit, construction unit, design unit and supervision unit.

1.2. 1 Coordinate the relationship with the construction unit. As the concrete project implementer of the construction unit, the representative of Party A is in the front line, and the relationship with the construction unit is mainly supervision, followed by cooperation and cooperation. It is necessary to supervise whether the construction unit carries out the construction in accordance with the project contract, drawings and specifications, and help solve some technical problems encountered in the construction site, as well as disputes such as water, electricity, roads and land acquisition compensation. Fiona Fang cannot be built without rules, and so can engineering construction. Construction units must be strictly required to carry out construction in accordance with construction specifications. First of all, we should make good preparations before construction. After all the preparatory work is completed, it is necessary to immediately apply to the supervision unit to issue a notice of commencement; Every time a process is completed, Party A's representative shall check with the supervision unit, and the next process can be carried out only after it is qualified; otherwise, it will be considered as violation; During each acceptance, if the supervision company really has something to do and can't go to the site for inspection and acceptance, the representative of Party A can call the supervision company and take photos at the site for the supervision company's reference.

1.2.2 coordinate the relationship with the supervision unit. According to the requirements of the contract, the supervision department is responsible for the construction unit, and together with Party A's representative, it supervises the construction unit to strictly implement the contract, strictly control the project quality, and solve the problems existing in the project construction at any time. General problems, find a place to solve a place; After consultation with Party A's representative, urge the construction unit to properly solve important quality problems and ensure the progress and quality of the project; If Party A's representative can't solve the big problems on site, it is necessary to consult the project legal person of the construction unit and the general manager of engineering technology to solve them through negotiation.

1.2.3 coordinate the relationship with the design unit. Design units generally do not participate in the construction of the project, but only explain the relevant design details at the request of the construction unit. In engineering construction, once there is a contradiction between design and actual construction, Party A's representative needs to listen to suggestions with an open mind, fully respect the rectification opinions of the site supervision unit on the premise of ensuring the overall design, reflect the actual situation to the design unit in time, and put forward amendments and supplementary opinions in writing. Before getting a reply, all construction activities should be stopped, and the construction unit can start work only after the design unit issues a written notice of design change.

1.3 carry forward the spirit of water conservancy industry, be a down-to-earth person and be a conscientious officer.

The water conservancy industry has a large volume and a wide range, and most of the projects are in deep valleys in mountainous areas, with inconvenient transportation and few people. This requires every water conservancy worker to always carry forward the professional spirit of "dedication, responsibility and truth-seeking", be down-to-earth, be conscientious and love their work. All kinds of problems will be encountered in the project construction, so we should take pains to take them seriously, organize the supervision and technical personnel of the construction unit to conduct on-site consultation in time, find the correct solution, and achieve daily completion.

2. Reasonable construction organization

2. 1 Preparation before construction

The smooth implementation of a project will inevitably encounter earthwork excavation, tree felling, young crops compensation, land occupation, traffic interruption and so on, and it is inevitable to deal with local township (town) people's governments, village committees and villagers. This requires Party A's representative to quickly start and play a role after receiving the task, help the construction unit to handle the relationship with local departments, find and solve problems as soon as possible, and ensure the smooth development of the project without delaying the construction period.

2.2 Preparation before commencement

The representative of Party A shall actively plan and assist the construction management unit to hold a technical disclosure meeting in time. At the meeting, first of all, the project legal person announced the appointment of the project technical director, the representative of Party A in each bid section, and each construction team was responsible for the bid section operation. Secondly, the general manager of engineering technology will make technical disclosure to the supervision unit and the construction unit on construction technology, construction process, construction drawings and other related technical details. Before construction, Party A's representative must also organize the supervision unit and the construction unit to jointly review the drawings, check for leaks and fill gaps, and fully ensure the accuracy and rationality of the design drawings.

2.3 Strictly control the engineering quality.

Project quality is a century-long plan, and it is related to the success or failure of the whole project construction. Only by careful construction according to the specification requirements can we achieve the engineering design goal, pass the acceptance smoothly, and finally give full play to the maximum engineering and social benefits for the benefit of one party. Party A's representative must, jointly with the supervision unit, regularly and irregularly check the certificate, origin and quality of building materials such as cement, steel, sand, stone and wood used by the construction unit, investigate and deal with problems in time when they are found, and resolutely put an end to shoddy. Generally speaking, reinforcement depends on the certificate and size; Concrete strength test should be done; Sand cannot be mixed with mud; Cement should be strong enough not to be out of date because of moisture. It is required that the construction unit must carefully construct in accordance with the design specifications and construction procedures, and strengthen the inspection of every key part and materials used to ensure the quality of the project. Party A's representative should go to the construction site more often, go down to the front line, find problems, deal with them in time, and leave no future trouble. All hidden parts in the construction shall be recorded in writing in time and photographed for the supervision unit and the construction unit to check afterwards. If the parts that do not meet the design requirements are found, they should immediately stop work and rework, and report and communicate to the construction unit in time.

2.4 construction in strict accordance with the schedule.

Before the commencement of construction, Party A's representative shall, according to the actual situation of the project, require the construction unit to formulate a detailed and reasonable construction progress plan, and reasonably arrange the allocation of labor, materials and machinery. Every construction worker must be familiar with norms and systems and work hard. The supervision unit is specifically responsible for supervising the implementation. Party A's representative must control the overall situation, make overall consideration, and make appropriate dynamic adjustments according to the actual situation of site construction to ensure that the project can be completed on schedule.

2.5 Establish a sense of safety responsibility.

The engineering site is the place where personnel, materials and machinery are deployed. If you don't pay attention to safety and operating procedures, it is easy to have safety accidents. Therefore, we must keep the awareness of safety precautions in mind, talk about it in our mouths, write it on the walls, and practice it on our bodies, so as to keep the alarm bells ringing and prevent problems before they happen. Before construction, the supervision unit is required to call the person in charge of the construction unit to hold a safety production meeting and sign the responsibility book for safety production; Subsequently, the construction unit will also sign a safety accident responsibility letter with the construction personnel, or handle the personal insurance business of the relevant construction personnel, and educate the construction personnel about safety in production, so that they will have a sense of safety precautions ideologically. During the construction period, we should regularly and irregularly check the safety in production. Those practices that do not meet the safety requirements, such as not wearing safety helmets, not setting warning signs, connecting wires without permission, poor drainage, ineffective flood control and fire prevention measures, littering vehicles, and not following the specifications and working procedures, should be dealt with seriously, and one should be dealt with if it is found, so as to ensure safe production.

2.6 Take responsibility, listen to opinions and construct flexibly.

Engineering construction involves all aspects, and is limited and influenced by terrain, climate, man-made and other factors, and more or less there will be some places different from the design. Therefore, Party A's representative must have a clear understanding, never copy from the book, but handle it flexibly according to the on-site situation. In addition, if the construction unit puts forward several requirements for design changes, it is necessary to adhere to principles on key issues, not to give in, to flexibly grasp secondary issues, to deal with them decisively, and not to delay the construction period. This requires Party A's representative to be proficient in business, be brave in taking responsibility and make independent decisions at critical moments. However, in case of serious problems, it is necessary to report to the construction unit and technical director in time, and then carry out construction after receiving the reply.

3 Acceptance preparation

The construction of each water conservancy project should be carried out in strict accordance with the order of unit project-sub-project-unit project, and the acceptance preparation of the whole project can only be started after the completion of all unit projects. In fact, the acceptance of the project has already started after the start of construction, so it is necessary to intervene in the acceptance of the whole supervision in advance, and every link should be done well. Some major problems found in the acceptance should be solved with the supervision unit and the construction unit in time and reported to the construction unit for the record. Check all the completion data and drawings of the supervision unit item by item, and carefully check them at the construction site to ensure that the completion data and drawings are true, accurate and standardized for the convenience of the construction unit.

Practicing the spiritual requirements of "dedication, responsibility and truth-seeking" in water conservancy industry and exercising the responsibilities and obligations of Party A's representative in water conservancy projects require continuous study and practice, and constantly improve their professional quality. Only in this way can we be competent for the work of Party A's representative of water conservancy projects and make better contributions to water conservancy construction.