Find a self-inspection report of the large screen display system project.
2. When preparing the pre-tender estimate or pre-tender estimate for infrastructure, the fees for safety protection, civilized construction measures and environmental protection shall be collected in strict accordance with the requirements of relevant documents, which shall be regarded as non-competitive fees. Any concessions and reductions in the bidding process do not involve the adjustment of security measures fees.
3. In terms of infrastructure construction contract, the Standard Form Contract for Civil Buildings issued by the Ministry of Construction or the template of infrastructure renovation contract issued by provincial companies is adopted, which contains safety responsibility clauses and defines safety production responsibility, control indicators, reward and punishment measures, etc.
4. In the project construction contract, the safety protection and civilized construction measures are listed in detail, and the supervision measures are earmarked. In the payment terms of advance payment, it is clearly stated that it includes part or all of the cost of safety protection and civilized construction measures, and it is not less than 30% of the total cost of safety protection and civilized construction measures.
(2) the construction site management system and system:
1, safety management system
The project department has set up a safety production management team on the construction site. The management team consists of the project manager, supervisor, construction safety officer of the construction unit and the accompanying management personnel of the company, and is responsible for handling and coordinating the safety production matters at the construction site. The name list and contact information of the team members on the construction site are posted on the publicity wall of the site, and the personnel identification is clear.
2. Responsibilities of safety production management personnel
1) Implement relevant policies of the Construction Committee, Construction Management Office and Shiyan Branch of China Mobile, review relevant policies and regulations on engineering safety and emergency work, determine safety production management objectives, and organize safety meetings, education and training; 2) Organize to draft and revise the emergency plan for engineering safety guarantee, prepare the safety production management plan, and review the safety of the construction organization plan; 3) Daily safety inspection. In case of major emergencies or safety accidents, start this plan and issue emergency security tasks; 4) According to the actual situation of major emergencies, determine the emergency plan for security, and report the implementation and progress to the Construction Committee, Construction Management Office and China Mobile Shiyan Branch; 5) In case of emergency, uniformly dispatch all kinds of security resources of each contractor and do a good job in organizing and coordinating security;
6) Other matters assigned by Project Construction Committee, Construction Management Office and Shiyan Branch of China Mobile.
3, on-site safety management system
Through inspection, the safety management system that the construction site should have according to the document requirements is 1, and the on-site safety production discipline. 2, construction electricity management system. 3, the construction of fire management system. 4, construction machinery management system. 5, production safety education system. 6, site safety and holiday duty system. 7, major hazard monitoring system. However, there are still four systems that have not been posted on the wall, namely 1 and safety inspection system. 2, inductrial injury accident management system (including accident emergency plan). 3, the risk of special engineering construction plan review system. 4, special type of work safety system. Through this safety self-inspection, the construction unit has been urged to strictly abide by the requirements, unconditionally implement, and increase penalties, and offenders will be prosecuted.
(3) Check the implementation of various safety systems and measures at the site:
1. Is it possible to start work before signing the contract?
In the process of construction, there is no situation of starting work without signing a contract, and the construction is carried out according to the process, and the construction operation is carried out after the contract is passed.
2. Before the project starts, have you completed the construction application and obtained the construction permit? After reviewing the construction unit's commencement report and checking that the construction preparation of the construction unit meets the safety construction requirements, is it allowed to start construction?
Before the project starts, all construction applications have been completed, the construction permit has been obtained, and the construction commencement report of the construction unit has been reviewed. Only after the construction preparation of the construction unit meets the requirements of safe construction can the construction be started. There is no phenomenon of entering the site without safety construction audit.
3. Do you organize a weekly safety inspection and keep files or video records?
Organize members of the construction site safety production management team to conduct safety inspection once or twice a week. After each inspection, record the inspection process, explain the existing problems, promptly urge the construction unit to put forward rectification opinions, carry out rectification, and strengthen the awareness of safety management.
4. Do you regularly organize construction, supervision and other on-site personnel to carry out safety knowledge education and publicize various safety systems and measures?
The construction site regularly organizes construction, supervision and other on-site personnel to carry out safety knowledge education, publicize various safety systems and measures, and organize regular study every month to become a habit, which promotes the gradual deepening and strengthening of on-site safety awareness.
5. Regarding potential safety hazards, has the supervisor issued a rectification notice in accordance with the principle of "personnel, timing and measures"? If the hidden danger is serious, shall the supervisor and Party A * * * issue a shutdown notice, and order them to stop work until the rectification is qualified, and then start work after issuing a resumption notice?
For potential safety hazards, the supervisor will make a detailed record of the existing problems in the daily safety inspection and issue a notice of rectification opinions. If the rectification is not carried out within the time specified in the rectification notice, a punishment system shall be implemented, and the construction unit shall be punished according to the size classification. If there are serious hidden dangers, the supervisor will inform us in time, and then * * * will issue a shutdown notice, ordering the shutdown until the rectification is qualified, and then restart the work after issuing a resumption notice.
6. During the construction, are the supervisors and the safety administrators of the construction unit always present to supervise?
During the construction process, both the supervision company and the construction unit arrange a part-time safety administrator to carry out construction and supervision at the site at any time.
7. Is there reliable enclosure and patrol measures on the construction site to prevent outsiders from entering the site?
There are fences and guards around the site to patrol the site to prevent outsiders from entering the site.
8. Does the behavior of the construction site personnel meet the safety requirements? For example, whether construction workers wear safety helmets or other personal protective equipment correctly when entering the site, whether they don't smoke, pay attention to various safety signs, and don't trespass in dangerous areas.
Workers on the construction site have personal protective equipment such as helmets and masks, and smoking still exists. Then there was no smoking after the rectification, and the punishment for illegal smokers was increased. Set and hang safety warning signs in mechanical areas and dangerous areas.
9. Are all safety protection facilities and equipment in place? The main safety protection facilities and equipment include foundation pit support and pit edge protection; Template engineering board, sweeping pole, bracing, etc. ; Electrical protective equipment and electrical test instruments; Scaffolding and protective nets; "Three treasures": safety helmet, safety net and safety belt; Safe passage; Protective railing; Commonly used drugs and first aid equipment, motor vehicles, etc. ;
Set protective railings, protective scaffolding or other effective protective measures around the work area, work platform, pedestrian passage, construction passage, transportation receiving platform and other construction activities on the construction site for protection; A large number of protective scaffolding are set up in the working area, working platform, pedestrian passage, construction passage and street transportation receiving platform, and the Mihm safety net is hung for closed treatment. In terms of electricity consumption, there are insulation protective appliances, first-aid equipment and medicines prepared by construction workers, and temporary adjustable motor vehicles for emergencies.
10. Are all safety and fire prevention measures in place?
The fire source should be strictly controlled at the construction site, and the following measures should be taken. 1) Set up a centralized smoking area on the construction site. 2) Strictly implement the examination and approval system for hot work. 3) It is forbidden to pull and connect the power supply and electrical appliances randomly to prevent the electrical circuit from causing fire. 4) According to the fire prevention layout, implement fire fighting equipment and post fire prevention signs. 5) Sawdust and shavings must be cleaned up next to the chainsaw and template in the woodworking workshop, and transported to the designated place on the ground for stacking. 6) Strengthen fire safety education and publicize the hazards after the fire on the billboard. 7) Establish regular fire inspection and replace fire extinguishers. 8) It is forbidden to use electric furnaces, kerosene stoves and light bulbs larger than 60W, and it is forbidden to use electric heating rods to boil water. 9) The construction site should be clearly divided into flammable and explosive material storage yard, warehouse, flammable waste collection station, living quarters and other areas. 10) The construction site is equipped with lighting equipment at night to keep the fire escape unblocked and arrange the obligatory fire brigade to be on duty. 1 1) When using electricity on the construction site, strictly implement the regulations on safety management of electricity consumption on the construction site, strengthen the management of electricity consumption, and prevent electrical fires. 12) It is forbidden to build temporary buildings or pile flammable items under overhead lines. Through a series of measures, the purpose of safety and fire prevention was achieved.
1 1. Are all measures for safe use of electricity and water in place?
The self-inspection on the construction site of this project is mainly divided into two aspects.
1, safety technical measures:
1) Seriously implement the idea of "safety first, prevention first, energy saving and consumption reduction, and pollution reduction" to engineers, so that engineers can consciously and voluntarily pay attention to safety and protect the environment. 2) It is strictly forbidden to command or operate in violation of regulations to prevent potential environmental accidents such as fire, explosion, poisoning and electric shock. 3) Non-electricians are not allowed to use electrical equipment without authorization, and the electrical facilities must meet the specification requirements. 4) Take the elevator to transport materials or go up and down. Don't grab them. Pay attention to safety and have obvious signs when entering and leaving the entrance. 5) Special projects must have a working license (electricity, gas welding, etc. ) .6) Safety helmet must be worn when entering the site, and safety belt must be worn when working high above the ground. 7) Chemicals in use (paint, thinner, etc.). ), pay attention to keep ventilation, with fire fighting equipment. When collecting chemicals, unused barrels should be sealed in time because the quantity is appropriate.
2, fire technical measures:
1) Seriously study fire laws and regulations to enhance fire prevention awareness; 2) The construction floor shall be equipped with fire fighting equipment as required, and designated persons shall be responsible for it; 3) Use fire certificate and assign special personnel to watch the fire; 4) Combustible materials and materials shall not be stacked indoors, and special warehouses shall be set up for special storage, and obvious signs shall be posted; 5) Smoking is strictly prohibited on the construction site, and naked fire is strictly prohibited to keep warm; 6) All decorative materials shall meet the requirements of national fire protection codes. Through standardized measures, the awareness of prevention is further refined to realize engineering safety.
12. Check whether the warning signs on the construction site are set as required.
Signs, including safety warning signs, warning language signs, mechanical signs, unloading platform signs, underground facilities signs, safety slogans, etc. Formulated according to the requirements of Safety Signs (GB2894) and set in obvious positions in the working area, processing area and living area of the construction site to meet the warning requirements;
13. Check whether climbers, electricians and other special types of work have been specially trained and hold relevant certificates;
When inspecting climbers, electricians and other special types of work on the spot, it was found that most of them could work with certificates, and a few failed to do so. Through self-inspection, all special jobs have been certified.
14. Whether the supervision unit has fulfilled the safety supervision duties according to the relevant requirements.
The supervision unit arranges personnel to supervise and certify the safety supervision duties on site every day, without omission.
Check the self-inspection process carefully, list the items clearly, and check according to the document steps. The engineering quality is qualified and the data are completely synchronized. At the same time, we also found many missing problems. When problems are found, they should be rectified in time to ensure that the ideological policy of "safety first, prevention first, energy saving and consumption reduction, and pollution reduction" is implemented during construction. Actively do a good job in safety precautions.
- Related articles
- Zhang Zetian facilitated the establishment of Nanjing's famous school in Suqian and will officially enroll students starting next year
- What do you mean by a mask that can be attached?
- Essay about visiting supply and marketing cooperatives
- The gas station is built in the water source protection area. Is it open for business?
- Japanese tourist attractions What are the tourist attractions in Japan?
- Five English slogans about Chinese characters
- Has Shenxian¡¯s vegetable output surpassed that of Shouguang? Why is Shouguang the hometown of vegetables?
- The activity plan of respecting and loving the elderly in kindergarten Double Ninth Festival
- Is it legal for schools to charge after-school service fees?
- The best place for agricultural leisure in Xiangyang