How to write the column of acceptance opinions?

The contents to be filled in the acceptance comments column are as follows:

Fill in whether the project meets the design requirements, specifications, engineering quality and safety requirements. Completion acceptance refers to the acceptance conducted by the development and construction unit in conjunction with the design, construction, equipment supply unit and engineering quality supervision department after the completion of the construction project.

Conduct a comprehensive inspection on whether the project meets the planning and design requirements and the quality of building construction and equipment installation, and obtain qualified completion materials, data and vouchers. It should be pointed out that the completion acceptance is based on the phased acceptance, and the project that has completed the acceptance will not be re-accepted at the time of completion acceptance.

Project completion acceptance is the last working procedure of the whole construction process and the last work of project management. It is a sign that construction investment results are transferred to production or use, and it is also an important link to comprehensively evaluate investment benefits and test design and construction quality.

With the official seal of the construction unit and the signature of the director of the municipal construction engineering quality supervision station, it is required to fill in the list of all parties involved in the construction in detail, including the personnel of the construction (supervision) unit, the construction unit and the survey and design unit.

Inspection before acceptance

Acceptance is to check according to certain standards, and then accept or approve the item-by-item acceptance. On the basis of the quality inspection and evaluation of the construction unit, the relevant units participating in the construction activities will sample and recheck the quality of the inspection lot, disciplines, divisions and units, and confirm in writing whether the project quality is qualified according to relevant standards.