Joke Collection Website - News headlines - How much does hand-painted walls cost in Kunming?

How much does hand-painted walls cost in Kunming?

The normal price of hand-painted paintings near Kunming generally ranges from 100 to 300 per square meter. Due to the relatively high painting requirements for hand-painted walls and the difficulty of painting some walls, the prices will vary. Because of the flexibility of wall painting, the price is also very flexible. Commonly used ones include: hand-painted wall advertising small patterns priced at 30 yuan to 50 yuan/square meter each

Advertising slogans 50 yuan to 80 yuan/square meter

Outdoor slogan substrate picture 80 Yuan-800 yuan/square meter

Vines and lines are relatively simple pictures, so the price will not be higher than 120-150 yuan/square meter;

Flowers and plants, mainly There are more details, and there are no lines as smooth as 120-150 yuan/square meter;

Cartoon characters and animals are relatively time-consuming, and people and animals need to express their expressions. Price: 150-300 yuan/square meter;

Freehand landscapes generally involve large areas of coloring, and the area to be painted is large. The time consumption and material price are: 250-500 yuan/square meter.

Gongbi Chinese painting and realistic oil painting are complicated in workmanship, so the price is 400-800/square meter

Oil painting landscape, oil painting realistic type needless to say the complexity of the painting, which requires a higher level of painters The horizontal price is generally more than 1,000 yuan/square meter

The complexity of the painting pattern, because hand-painted walls are generally painted by hand, the difficulty or ease of painting the pattern is directly related to the amount of labor spent.

p>

The size of the hand-painted wall painting area is related to the cost of the hand-painted wall. The greater the project volume, the average unit price will be relatively low. Wall paintings of 70 to 80 yuan/square meter are generally quoted for large project quantities. The price.

The distance of the construction site is also part of the cost. Because if the construction site is far away, it will involve travel expenses, accommodation fees, and the cost of time spent by personnel on the road.