Joke Collection Website - News headlines - Introduction to Rizhao Construction Bidding Network?

Introduction to Rizhao Construction Bidding Network?

The Rizhao Construction Tendering Network is affiliated to the Rizhao Construction Project Tendering and Tendering Management Association (hereinafter referred to as the Rizhao Tendering Network). It is responsible for the unified opening of the city's construction market, the release of project information, construction legal specification information and other services. Rizhao Bidding Network actively performs the corresponding duties of the Provincial Bidding Network (Shandong Bidding Network) and maintains the order of various engineering procurement project activities.

The Shandong Provincial Urban Construction Management Regulations on the Rizhao Bidding Information Network include: (1) General principles (2) Planning and implementation (3) Management and maintenance (4) Supervision and inspection (5) Maintenance of construction funds ( 6) Legal liability (7) Part 7 of the appendix. The contents of management and maintenance are as follows:

Article 19 The urban construction administrative department shall strengthen the supervision and management of municipal engineering, public utilities, landscaping, city appearance and sanitation facilities maintenance and management units, and formulate maintenance and management regulations. Annual maintenance plans, approving maintenance and repair costs, and supervising and inspecting the quality of maintenance and repairs.

Units responsible for the maintenance and repair of municipal engineering, public utilities, landscaping, and city appearance and sanitation facilities must regularly maintain and repair the facilities they are responsible for in accordance with relevant maintenance and repair technical specifications to ensure that they are in good condition and Operate normally and accept the supervision and inspection of the urban construction administrative department.

Article 20 It is strictly prohibited to occupy major urban roads as markets, parking lots and stalls. If it has been occupied, the urban people's government will organize relevant departments to clear it out within a time limit and restore urban road functions.

Main urban roads include motor vehicle lanes, non-motor vehicle lanes and sidewalks.

The main urban roads are determined and announced by the urban people's government.

Article 21 It is strictly prohibited to dig urban roads without authorization.

If urban roads need to be excavated due to project construction, they must be reported to the urban construction administrative department and the public security and traffic management department for approval, and the site must be cleaned up within the prescribed time limit to restore the original condition of the urban roads; without approval, any unit and individuals are not allowed to dig.

However, if there is a sudden underground pipeline failure that requires road damage and emergency repairs, it shall be handled in accordance with relevant national regulations.

Article 22: The installation or maintenance units shall be responsible for the maintenance of inspection wells, box covers and ancillary facilities of urban roads for various pipelines installed on urban roads. If inspection wells, box covers and urban road ancillary facilities are damaged, displaced or lost, the installation or maintenance unit shall promptly repair, straighten or fill the gaps.

Urban road facility management units should establish and improve inspection systems and promptly repair and replace damaged lighting facilities.

Article 23 The urban construction administrative department shall take measures to ensure the normal operation of the facilities of the completed urban sewage treatment plants, and the quality of the treated sewage must meet the standards specified by the state.

Relevant procedures for discharging sewage into urban discharge pipe networks and other facilities must be completed in accordance with national regulations, and the quality of sewage discharged must comply with sewage discharge standards stipulated by the state.

It is strictly prohibited to discharge toxic, harmful, flammable, explosive or easily clogged pipes into drainage facilities.

Article 24 The urban construction administrative department shall strengthen the maintenance of urban flood control facilities, clear water blocking obstacles in flood discharge rivers in a planned manner, ensure the normal operation of pumping stations, and ensure the safety of urban flood seasons.

Article 25 Production and operation units engaged in municipal public utilities such as urban water supply, gas supply, heat supply, public transport and passenger transportation, sewage treatment, garbage disposal, etc. must obtain a business license in accordance with the law. before engaging in business activities.

Article 26 Urban water supply, gas supply, heat supply and other production and business units shall provide their products to users on time in accordance with the standards prescribed by the state. Except in cases of force majeure, urban water supply, gas supply, heating and other production and operation units shall not stop production and supply without the approval of the urban people's government. If partial pressure reduction or supply suspension is required due to special circumstances, users must be notified 24 hours in advance.

Urban public water supply units and self-built water supply units shall regularly inspect and maintain the water supply facilities under their management to ensure safe operation.

Urban gas production, storage, transmission and distribution, and operating units must strictly abide by relevant safety regulations and technical operating procedures, establish and improve corresponding safety management systems, and ensure the safety of urban gas production, supply, and use.

Decentralized heating facilities are not allowed to be built in centralized heating areas.

Article 27 If a public passenger transport vehicle that operates on a fixed schedule, on a fixed route or at a fixed point needs to change the specified operating time, route or parking site, it must be approved by the urban construction administrative department in conjunction with the public security department. Approved by the traffic management department.

Article 28 It is strictly prohibited for any unit or individual to build buildings, structures and pile objects within a safe distance of urban water supply, drainage, gas supply, heating pipes and facilities without authorization. It is prohibited to install pumps directly on urban public water supply pipelines to pump water.

When building buildings, structures and stacking items within a safe distance of urban water supply, gas supply, heating pipes and facilities due to project construction, it is necessary to obtain the consent of the urban construction administrative department and take protective measures. , before construction can begin.

Article 29 Urban public green spaces, road greening, etc. shall be managed by the urban construction administrative department.

The units and residents in the urban planning area are responsible for maintaining the courtyard greening of units and residents, and accept the guidance of the urban construction administrative department.

Article 30 The provincial people's government and the city people's government shall delineate the scope of protection for gardens, ancient and famous trees, cultural relics and historic sites with important historical, scientific and ornamental value in urban planning areas, according to relevant regulations Be strictly protected.

Article 31 When constructing sculptures in urban planning areas, experts must be organized to conduct demonstrations and submitted for approval.

The construction of sculptures with commemorative and important historical significance must be reviewed and approved by the urban construction administrative department and then reported to the urban people's government for approval; the construction of other sculptures must be reviewed and approved by the urban construction administrative department.

Article 32 Urban public facilities, landscaping, environmental sanitation, public places, etc. shall comply with the urban appearance standards stipulated by the state.

The buildings on both sides of the city's main roads should be kept clean, intact, and beautiful in appearance. The property owners and users of the buildings or individuals are responsible for the broken walls and dangerous houses and structures that affect the city's appearance. Repair, renovate or demolish.

Article 33 The installation of outdoor advertisements, placards, galleries, windows, etc. must comply with urban appearance standards.

Article 34 Units within the urban planning area must be responsible for the city appearance and environmental sanitation within the area of ??responsibility in accordance with the regulations of the urban people's government, and accept the supervision and management of the urban construction administrative department.

Article 35 The urban construction administrative department shall, in accordance with relevant national regulations, implement unified supervision and management of various environmental sanitation facilities in urban streets and the collection, transportation and treatment of urban domestic waste.

Article 36 Construction units and individuals within urban planning areas must clear and transport construction waste to prescribed waste disposal sites in accordance with the regulations of the urban construction administrative department. It is prohibited to pile or dump construction waste randomly.

Vehicles transporting liquids and bulk goods operating within urban planning areas must be sealed, bandaged, and covered in accordance with regulations to avoid leakage and scattering.

Rizhao Bidding Information Network Website: /Default.aspx

Rizhao Construction Bidding Network Address: No. 269, Jinan Road, Rizhao City, Shandong Province

Rizhao Construction Bidding Network Contact Method: 0633-8899317

Rizhao Construction Bidding Network Fax: 0633-8899301

For more information about the writing and production of bid documents and improving the bid winning rate, click on the bottom of the customer service for free consultation.