Joke Collection Website - News headlines - How to install integrated wall
How to install integrated wall
1. Top first and then wall: ceiling-wall.
If there is a ceiling, install the ceiling before installing the wall. It is very important to install the first board. If the rear wallboard is improperly installed, it will be obviously inclined.
2. Line front board: board line
Integrated wall installation should follow the principle of "big first, then small". Install the main material first, and then install the circuit. Use large-area installation first, and then deal with small details such as corners and edges.
3. Bottom-up: bottom of wall-top of wall
When installing the wall, you should start from the bottom of the wall and then gradually increase the installation of the whole wall. At this time, the wallboard will become compact and stable due to gravity.
4, from outside to inside: door-indoor
The first board should be placed on the entrance wall, and then installed from the entrance wall, because the last part needs to be cut, and it is more beautiful to install from the outside to the inside. Attention to details determines success or failure, and special attention should be paid to small details in the decoration process, otherwise it will affect the later use of integrated walls.
Matters needing attention in integrated wall installation
1, when placing the plate, the things below should be well padded, and the plate should be lifted up for carrying, so as not to break it. When cutting the plate, the aluminium scrap generated by cutting should be wiped off. When installing the plate, attention should be paid to the flush installation of the plate incision, and the water cutting should be installed under the window to avoid the dirt caused by frequent washing.
2. Pay attention to the problem of integrated wall protection film: In order to protect the clean and beautiful integrated wall, the integrated wall manufacturer will cover the surface of the integrated wall with a film to prevent it from being scratched. This kind of membrane needs to be torn off before installation, and the slogan "Please tear it off before installation" is also marked on this kind of membrane, but many people still tear it off after installation considering the dust problem when installing the integrated wall.
- Previous article:What do you mean by the outbreak date?
- Next article:Talking about the construction and management of urban sewage pipe network?
- Related articles
- What folk activities are there on the Dragon Boat Festival?
- How to write the propaganda slogan to protect Tibetan opera?
- Know what it means to have a shallow peach blossom pool, warm buildings and warm sunshine?
- Why is Xpeng Motors called Page?
- Create your own advertising language
- Are there any new regulations for planting trees on farmland?
- Because all banks in Hong Kong were closed due to Typhoon No.8, what emergency measures did the local authorities take?
- Which city does Huaiyang county belong to
- Whose nickname is hot dog?
- What are the specific requirements for air separation and liquid oxygen pipeline piping?