Work Summary of Project Department in the Fourth Quarter 20 19
Summary of the work of the project department in the fourth quarter (20 19): from the fragrance of golden osmanthus to the snow, from autumn harvest to winter storage, the fourth quarter spans autumn and winter seasons, which can be described as both value and connotation. Works should also be of this style, with value and connotation. The long-awaited change drawings were issued, and a little busy construction followed. Although there is no big output value, but more details, apparent quality control is still the top priority. Below I will make the following summary of the work in this quarter of 20 19.
I. Summary of work
The main work of this quarter is:
1. Compilation of construction materials: mainly the compilation of safety technical disclosure and the improvement of office materials. This quarter, the safety technical disclosure of general compaction of civil foundation, leveling and rolling of civil foundation, excavation and compaction of foundation trench of fence, and safety technical disclosure of revetment project were mainly compiled. In the process of preparation, we will constantly scrutinize and study the specifications and consult the construction team leader. Through constant revision, the safety precautions are updated in time according to the process characteristics, so as to be comprehensive and highlight the key points, so that the disclosure can play its greatest role and better guide the construction. After being approved by the leader, it shall be countersigned in writing by the construction team. Internal information is mainly to replace and sort out the parts with unclear handwriting or changed format.
2. On-site station: The characteristics of on-site construction in this quarter are that there are more bid heights in the construction process, and there are more requirements for the bearing capacity, flatness and compactness of the site. For example, total tamping is the key process of foundation construction, and the quality of total tamping is directly related to the quality of the whole civil construction in the future. Therefore, we should not be careless in the construction process, and resolutely put an end to the situation of missing and less tamping. After ordinary tamping, the bearing capacity test proves that the quality of ordinary tamping is qualified; For example, the Urban Construction Bureau has a process of checking civil works and wall foundation trenches, and there is no experience to learn from this kind of construction. Therefore, the construction process is strictly in accordance with the requirements of the drawings, and the elevation is measured frequently, so as to fully control the flatness and compactness of the site, make it beautiful and conform to the requirements of the specification, and strive for a qualified acceptance.
3. Preparation and submission of statements: Daily, weekly and ten-day newspapers seem simple but actually difficult. If you are not careful, you will make mistakes, so it is very important to master the progress of machinery, personnel and projects on site. Therefore, we have strengthened our understanding of the real-time dynamics of construction, and learned about the key points and difficulties in construction, mechanical operation and weather changes. , and made a better plan, make the plan a guide to work, and better serve the construction.
4. Engineering budget accounting: The outdoor part is changed due to the change of drawings, so it needs to be re-evaluated. After the budget result is given by the budget company, it will make accounting, modify some contents, and put forward the actual budget price of the project as a reference for the actual quotation.
5. Complete other tasks assigned by the leaders of the project department.
Looking back on this quarter, all the work is progressing smoothly and the skills in the industry have been improved to a certain extent.
Second, the work plan
All the work is progressing smoothly this quarter, and the completion of civil engineering foundation has laid a good foundation for next year's work. I believe that next year's civil works will be carried out quickly and well. This is the report on the work plan for the first quarter of next year.
1. Do a good job in the technical work of ground hardening behind the wharf and installation of other ancillary facilities, focusing on controlling the apparent quality of the surface layer;
2, do a good job in civil construction technology;
3, do a good job in the industry, pay attention to details, improve the construction materials;
4. Prepare for the next project;
5. Further improve their professional level and actively learn professional knowledge;
6. Seriously complete other tasks assigned by the leaders.
Personal work report for this quarter is completed. Please give me more criticism. Thank you!
Finally, I wish all leaders smooth work, peace and health!
Summary of the work of the project department in the fourth quarter 20 19 2019 June 10 to February 65438, under the leadership of the company and the supervision department, the construction safety management department of our project department adhered to the principle of putting prevention first, combining prevention with control and strengthening education, and enhanced the safety awareness and self-protection ability of construction personnel through safety education; By grasping the * * * tube, we will create a situation that all combatants and cooperative employees in our construction work area care about and support the safety work in our construction work area, thus effectively ensuring the safety of construction funds and property from loss, and maintaining the normal construction, office and living order of the project department.
First, leaders attach great importance to it and take effective measures.
In order to further improve the construction safety education and strengthen the leadership of construction safety education, the project department puts the safety work on the important agenda, which is directly grasped by the first person in charge of the project department, and the leaders in charge of safety work specifically grasp it. Project Department, outsourcing team, operation team and other specific departments are responsible for organizing the implementation.
Second, institutional safeguards are in place.
1, establish the leadership responsibility system and accountability system for construction safety. The first person in charge of the project department and the full-time safety manager are responsible for bringing the construction safety work into the target assessment content of all relevant departments, conducting strict assessment and strictly implementing the accountability system. If a major safety accident is caused, the responsibility of the relevant leaders and the person directly responsible should be seriously investigated.
2. Sign a letter of responsibility. The project department signed letters of responsibility with various departments and ZuoYeDui layers to clarify their respective responsibilities. Some managers and operators of dangerous work have also signed safety responsibility letters, clarifying each other's work and responsibilities. Take safety construction as an important part of combatant assessment and implement a one-vote veto system. Carry out the principle of "who is in charge, who is responsible", so that the responsibility is clear and the responsibility goes to people.
3. Constantly improve the rules and regulations of safe and civilized construction. Establish various rules and regulations such as safety and civilized construction assessment score, and constantly improve and enrich according to the development of safety and civilized work situation. Establish and improve the safety management system that combines regular inspection with daily prevention, as well as rules and regulations such as construction personnel management, guards on duty, oil depot management, fire prevention and disaster prevention system, food hygiene management, fire safety management, construction hazard inspection system, and aerial work safety technical disclosure system. For all the work involved in the construction, there must be rules to follow, and violations must be investigated, leaving no blind spots and loopholes.
4, the establishment of fire prevention and flood control plan system. The project department set up an accident handling leading group and formulated an accident handling plan system.
Third, grasp the * * * tube group prevention and treatment.
The safety and civilized work in construction is a systematic project, which needs the close cooperation of project department, management and operation layer. The security department of the project department actively cooperates with the police station, various departments of the project department and the external cooperation team to do a good job in safety and civilization in construction. With the active cooperation of relevant departments of the project department, the construction area organized a series of lively educational activities and achieved good educational results.
Fourth, strengthen education and promote self-care.
In order to ensure safety, it is necessary to improve safety awareness, self-prevention and self-help ability, and do a good job in safety education, which is the basis of safety work of the project department. Focus on safety education every Wednesday night, and regularly give safety education to the combatants, especially in blasting, driving and aerial work.
1, do a good job in safety education on Wednesday. The education and training of construction safety and civilization closely focuses on safe production, which must be safe. In the education and training of safety civilization, the leaders in charge of safety in the project organize to learn all kinds of safety education working documents issued by the company, the supervision department and our superiors, and conduct in-depth and comprehensive inspections on the types of work, key parts protection, weak links in work, safety awareness and safety skills of all kinds of personnel in the construction area, eliminate hidden dangers, and carry out solid education and prevention work in a targeted manner.
2. Use flexible and diverse safety and civilization education activities. Through activities such as pre-shift meeting, daily safety inspection, regular and irregular inspection, special inspection, etc., the operators are educated on safety prevention through explanation, demonstration and training, so that the construction personnel can receive systematic safety knowledge and skills education on drowning prevention, falling accident prevention, electric shock prevention, food poisoning prevention, disease prevention, fire prevention, theft prevention, electric shock prevention and strike prevention. In addition, colorful safety education is carried out through radio, blackboard newspaper, hanging banners, posting slogans and holding theme class meetings, lectures, safety composition and knowledge contests. The project department also actively publicized the weekly safety reminder to the safety leaders of the construction ZuoYeDui, and used the short time before the meeting and going to work to summarize the safety work last week or the day before, emphasizing safety matters. Through various efforts, the safety awareness of the contractor has been enhanced, and the safety prevention ability and self-protection ability have been improved.
Five, strengthen inspection, timely rectification
Perform routine inspection. It is the routine inspection of full-time and part-time safety officers every day and the irregular safety inspection carried out temporarily by the project department, and the safe and civilized construction work is one of the key inspection contents. During the flood season in August, lead wire mesh was added to the cofferdam, which was heightened and compacted, and a special flood control team was sent to patrol and report the safety of the cofferdam for 24 hours. The project department organized various ZuoYeDui to conduct a comprehensive safety inspection of the construction area undertaken by our department. At the same time, actively cooperate with the municipal quality supervision departments, companies and supervision departments to inspect all canteens, drinking water sanitation, construction machinery and equipment, aerial work, electricity consumption and oil depots involved in safe and civilized construction in my construction work area. For more work summary, please enter the secretarial section.
Six, the main problems and the next step
We have done some work in safety and civilized work, and the safety and civilized construction work has been strengthened, but the difficulty of safety and civilized work in construction is getting bigger and bigger, and the situation of safety and civilized work in the project department is still grim.
1, there are too many requirements to create a civilized model, which is far from the actual requirements in construction. This year, the owner demanded that the shed with non-blue bricks and white walls be demolished with a high starting point and high standards, while the construction period of the creek bridge actually undertaken by our department was short. If the demolition and reconstruction are carried out according to high standards, the loss will outweigh the gain. Need the understanding and communication of the owners and other parties.
2, blasting safety hazards, safety management pressure. The address of our department is less than 50m away from the linear distance of blasting excavation of diversion open channel undertaken by our department. Every time before blasting, people should be evacuated, which is of great intensity and pressure.
This greatly increases the difficulty of safety work in our project department.
In the future, we will pay more attention to safe and civilized construction, solve new problems found in safe and civilized construction in time, and constantly improve the level of safe and civilized construction in our project department.
Summary of the work of the project department in the fourth quarter 20 19 3 20 19 With the strong support of the company leaders and the joint efforts of all employees, our project department has always put safety work in the first place, earnestly implemented the safety work policy of "safety first, prevention first and comprehensive management", and paid close attention to the implementation of safety production management, laying a solid foundation for the development of all work and the completion of indicators of the project department. Review.
First, implement the safety responsibility layer by layer and earnestly implement the safety responsibility system.
In order to effectively strengthen the organization and leadership of safety production and strengthen the management of safety production, at the beginning of the year, the manager signed a letter of responsibility for safety production with the heads of various sections and departments, and refined and quantified the safety objectives layer by layer and implemented them to everyone. In 2065438+2009, 8 sub-contracting teams signed safety production responsibility letters, and the signing rate was 100%. A safety production responsibility mode has been formed in which the leaders of the project department are in charge and the bosses of each construction team are mainly responsible.
Two, establish and improve the safety management system, earnestly implement the safety management system.
Without rules, there would be no Fiona Fang, and a sound system is the basis for ensuring security. So this year, my project spent a lot of energy to revise the comprehensive emergency rescue plan of the project department and the responsibility system for safety production of the project department, which laid a good foundation for the safety management of the project department. And according to the standards required by superiors, various emergency rescues have been established and improved.
Equipment files, data, do a good job in the operation and maintenance of all kinds of emergency rescue equipment and special equipment, so as to ensure the safety of the project department.
Third, strengthen safety training and education activities, and constantly improve the safety awareness of all employees.
In order to fully implement the safety work policy of "safety first, prevention first and comprehensive management", this year we focused on strengthening the safety education and training for employees.
1. From the moment the new employees enter the site, the project department will organize "three-level" safety education for them, from "publicizing relevant national laws and regulations and company safety management rules and regulations" education at the site level to "identifying the production situation and dangerous sources at the construction site" at the construction site level, and finally to "training the operation skills and safety operation procedures" for the team, so as to ensure that our new employees will be carried out systematically and step by step. Ensure that the "three-level" safety education rate of new employees is 100%, and ensure the training efficiency.
2. In the "Safe Production Month" in June, according to the requirements of the spirit of the superior documents, actively organize and carry out publicity and education activities on safe production. Organize all employees to actively learn safety and fire protection knowledge through exhibition boards, videos, meetings and other forms. The activity of "Safe Production Month" has improved employees' enthusiasm for safe production.
3. Emergency rescue drill and emergency rescue knowledge training: In June this year, the project department organized another emergency rescue drill for fire fighting and flood control. Through the participation and observation of construction personnel, a vivid practical lesson was given to employees, not only some basic emergency rescue drills were carried out, but also the personnel of various departments actively cooperated and United after the accident.
After practice and discussion, the rescue has achieved good results.
4. During the organization of "Safety Production Month" activities, safety warning signs shall be hung at all construction sites, and safety propaganda slogans shall be posted in conspicuous positions to improve people's preventive ability and reduce or avoid accidents.
5. This year, * * * organized a number of special safety trainings: two people took the safety qualification examination. The project organized 10 times of construction safety education and training, and 235 people participated in the training.
Through a series of training, education and practical training, the legal knowledge of all staff has been greatly improved, the consciousness of all construction personnel to do a good job in safety production has been enhanced, the overall quality of the team has been improved, the problems of safety production awareness, level and responsibility have been fundamentally solved, and the execution of management has been effectively strengthened.
Four, strengthen the "source" management, and resolutely stop the phenomenon of "three violations".
1, safety inspection is the main means to eliminate hidden dangers of accidents. In 20 19, * * * organized all kinds of spot checks for more than 20 times, and conducted daily inspections three times a week, basically rectifying the hidden dangers found on time.
2, continue to strictly implement the safety system, put an end to illegal command, illegal operation.
3. Strengthen the management of outsourcing units and strengthen construction safety measures to ensure construction safety. First, conduct safety qualification examination, and foreign construction teams without safety qualifications are not allowed to enter the construction site. The second is to require foreign construction teams to sign safety production agreements before entering the site for construction. After the corresponding safety qualification verification, foreign construction personnel are not allowed to start work until they receive the safety notice.
4, prepare for danger in times of peace, carry out "warning" safety education, so that the alarm bell of safety work will ring. In 20 19, there were 0 accidents in the project department, and the company's accidents were reported in the project department at the same time, which sounded the safety alarm for employees, deepened their understanding with real cases, educated them from lessons, and continuously improved their safety prevention ability and accident response ability.
Five, strengthen the management of the construction site, to ensure the elimination of accidents.
In order to ensure safe and efficient construction, we will focus on the following aspects:
1. Strengthen the study of relevant regulations on safety supervision and management of direct operation links such as temporary electricity consumption in construction, and strictly implement the company's safety management system.
2. Sign a safety production agreement with the construction unit, strengthen the safety education of the construction team before and after construction, and then go to work to prevent a safety vacuum from appearing in the construction process.
3. Strengthen the management of contractors, implement the contractor's responsibility system for production safety, strengthen the safety monitoring of direct operation links, and improve the management level of on-site construction by revising the commitment letter for production safety.
4. Make the construction plan and safety protection plan in advance before construction, and start the construction after the safety measures are implemented with the consent of both parties;
5. Summarize the problems and experiences existing in the construction process in time, and pay close attention to the project progress on the premise of ensuring the quality and quantity.
Six, improve the safety and environmental management system, and actively promote the standardization of safety and quality.
In order to ensure the effective operation of the management system, in the second half of 20 19, all departments of the project publicized and implemented the quality, environment and safety policies through internal training and publicity, which ensured the understanding and standardized implementation of the quality, environment and safety policies by all employees.
Seven, conscientiously implement the law on the prevention and control of occupational diseases, improve the working environment of construction personnel.
In order to improve the construction personnel's understanding of occupational diseases and hazards, the project organized the construction personnel to seriously study the Law on the Prevention and Control of Occupational Diseases, identify the hazards on the construction site, and hang warning signs. Timely provide suitable labor protection articles for construction personnel in each position, and ensure the physical and mental health of employees.
Eight, to carry out various forms of safety inspection, timely detection of all kinds of accidents.
In order to strengthen safety inspection, promote the real implementation of various safety work and give full play to the "supervision" role of safety functions, our project pays special attention to the implementation of various inspection systems in daily work: check whether the equipment has oil leakage, air leakage, component failure and damage; Check the electrical operation and whether all kinds of lightning protection and anti-static devices are in good condition; Check the fire fighting equipment and equipment to see if they are complete and effective; Check the training to see if the operation is skilled and fast. So as to ensure that our basic safety work is solid and effective.
- Related articles
- School Notice Template on Epidemic Prevention and Control (Collection of 7 articles)
- Promotion slogan for tail vegetable processing and utilization
- Cross inspirational slogan for senior high school entrance examination
- Planning scheme for holding the activities of World Earth Day
- The significance of Three-Self education
- Slogan of Law Girl Day
- Distance between coordinates in c language
- Beautiful sentences about glutinous rice balls during the 2021 Lantern Festival (good words and sentences about eating glutinous rice balls during the Lantern Festival)
- The Ministry of Agriculture and Rural Affairs said that it would focus on industry to promote rural development. How can we really promote rural development?
- Hotel decoration start banners and slogans