Joke Collection Website - News headlines - Ask for the electrician safety communication report of coal preparation plant ~ ~
Ask for the electrician safety communication report of coal preparation plant ~ ~
-Han, monitor of electrical maintenance.
Yingkou Hao Tong mining co., ltd
Comrade Han, the monitor of electrical maintenance in coal preparation plant of Yingkou Mining Co., Ltd., loves his post and is a "post pioneer" of the unit. Master Han is 49 years old and used to be a signalman in the army. After leaving the army, he was assigned to the National 475 Arsenal to work as a maintenance electrician. Later, due to the bankruptcy of the enterprise, I worked in enterprises in Beijing and other places for a long time, which improved my technical level continuously; Since joining Yingkou Hao Tong, he has been involved in the electrical installation and debugging of the factory. He works hard and is good at specialized research, regardless of time and remuneration. It is precisely because of the advantages of Master Han's dedication and excellent technology that he was appointed as the shift supervisor of the electrical maintenance post by the company. During his duty, he used the scientific management method of electrical maintenance work to realize the "failure does not solve the failure", which played an escort role for the smooth production of the factory.
In a system failure, he accurately determined that it was caused by "poor contact in the PLC cabinet" according to the failure display analysis. After careful inspection, it is found that "there are too many terminal insulation skins (copper wire ends are left too long) in two terminals, which leads to the failure of virtual connection of the exposed parts of two wires after long-term vibration."
201110 night shift, this is the first day of production after we stopped production in Yingkou Hao Tong, and the whole production line began to run normally; Only when the 205 coarse crusher is started, the failure of "motor can't be reversed" directly affects production; From the general manager and other leaders to the post personnel, they are all waiting anxiously. Ni Yongbo, the monitor on duty, checks the failure cause of the motor protection system in the power distribution room; In case of emergency, Master Ni decisively took temporary emergency measures to dismantle the mediator system. At the same time, he asked an electrician to inspect the motor junction box of the crusher and the motor control box of the oil pump and clean up the dust, and then resumed normal operation through the power transmission equipment. Ensure normal production on duty.
1 1 On the same day, Master Han, the shift supervisor, received instructions from the leader to take over the follow-up treatment of this fault. This kind of electrical fault is a new problem that has not been encountered since the factory was established; Although I didn't have much contact with Master Han, I was fortunate enough to witness the whole process of troubleshooting. With rich experience, Master Han first turned on the laptop to retrieve the stored information for analysis, and quickly found out the reasons that may lead to the action of the PICC system: due to the harsh natural environment (big dust, humidity and strong air corrosiveness), 1. Poor contact of related electrical contacts; 2. The cable leakage current is overestimated.
Then it is determined by troubleshooting: the first reason: the motor control box of the oil pump is not dust-proof and explosion-proof (see figure), and too much dust in the box leads to leakage current, which leads to the automatic protection action of the insurance system (the night electrician has immediately removed dust to eliminate hidden dangers), which is the main reason for the accident. The second reason is that the leakage protection action control of the relay system is too sensitive (the protection action current control value is set low) or the performance of electronic components is reduced, which is also one of the reasons for the failure.
Finally, fault handling: after the system is restored and reset, the 205 coarse crusher system is tested and resumed normal operation; As of press time, this batch of more than 60,000 tons of coal has been completed after 1 1 day of intense production; The crusher still keeps normal operation.
Although Master Han's educational background is not high, he can assiduously study professional skills in his post, especially combining computer technology knowledge with practical work. What is particularly commendable is that he saved the actual wiring situation in the PLC cabinet in the computer, so that when dealing with faults, he can quickly find out the faults. In addition, he successfully used the computer system to control the "operation data of electrical equipment in the factory", made timely inspection, monitoring, comparison and analysis, and accumulated a lot of valuable experience; It has played an important role in preventing electrical accidents and equipment maintenance. Master Han's dedication and hard work are worth learning from all Yonghui people. I hope everyone in Yonghui can exchange experiences, learn from each other, learn from each other's strong points, make suggestions and make due contributions to the operation, production and construction of coal preparation enterprises of Yonghui Group.
Attachment: 6 related pictures.
- Related articles
- Provisions of Ningbo Municipality on conscription work
- A message from a clean and honest Dragon Boat Festival
- Urgent! ! ! About airport ground handling
- How to design advertising slogans
- China's classical energy-saving poems
- Summary of epidemic prevention work in May
- Come on! Good man¡¯s information
- Slogans of sympathy for teachers and students
- What is the difference between a company name and a trademark?
- A girl was killed in Huashan. How should tourist attractions strengthen safety management?