Joke Collection Website - News headlines - Implementation plan of anti-three violations activities
Implementation plan of anti-three violations activities
In order to do a good job in all aspects of safety production, lay a solid foundation for safety, standardize employees' safety behaviors, and effectively prevent and eliminate all kinds of accidents, it is decided to carry out special rectification activities of "three violations" (illegal command, illegal operation and violation of labor discipline) in the whole team. All functional groups, professional workstations and oil production stations implement effective measures to ensure that the special rectification work is solid and effective. The specific matters of the "anti-three violations" activities are arranged as follows:
I. Guiding ideology
On the basis of safety production laws, regulations and industry standards, and in accordance with the basic requirements of "propaganda and mobilization, comprehensive investigation, formulation of measures, comprehensive management, and focusing on long-term", the violations and habitual violations of various functional groups, professional workstations and oil production stations of our team will be comprehensively rectified.
Second, the goal of remediation
Through special rectification, the safety production management level of each well group and station will be comprehensively improved, the on-site supervision of production operation will be strengthened, and the enforcement will be continuously strengthened, so as to eliminate the hidden dangers of accidents from the root causes, which will greatly change the thinking and behavior of employees, effectively control and reduce general casualties, put an end to major accidents and ensure the stability of safety production.
Third, organize and lead.
In order to promote the "anti-three violations" special rectification activities to be carried out in a solid manner, an organization and leading body was established.
Team leader: * *
Deputy Head: * *
Members: heads of functional groups, stationmasters of professional workstations and oil production stations.
The office of the leading group is located in * *, with Comrade * * as the director of the office, responsible for making statistics on the phenomenon of "three violations" found out, and implementing it in accordance with the Implementation Measures for Assessment and Punishment of "Three Violations".
Fourth, the scope and principles of remediation
Renovation scope: functional groups, professional workstations and oil production stations. Including production oil wells, water injection wells, lying wells, intermittent pumping wells, water injection equipment, sewage or clean water equipment, etc.
Remediation principle: Self-inspection of functional groups, professional workstations and oil production stations shall be the main task, and implementation shall be organized according to the principle of "whoever is in charge shall be responsible", and the safety and environmental protection group shall supervise each operation site irregularly.
Verb (abbreviation for verb) remedies the content
(a) establish and improve the "three violations" rules and regulations:
Safety inspection records of functional groups and professional workstations, safety education and training records, hidden dangers investigation and management records, operating procedures of each type of work, and various safety production rules and regulations.
(two) the implementation of the "three violations" rules and regulations:
1, whether there is illegal command phenomenon, mainly including:
(1) Failing to provide safety education and training for new workers, those who have returned to work, those who have changed their posts and those who are engaged in special operations.
(2) arranging the use of facilities for which the safety inspector has issued a notice of stopping use, and the hidden dangers have not been eliminated.
(3) Multi-type work and multi-level operation at the same time, with no command and supervision on site and no safety measures.
(4) Assign personnel whose physical conditions are not suitable for this type of work.
(5) Failing to make timely rectification for the discovered hidden dangers of accidents, and still forcibly arranging production tasks.
(6) Instructing employees to operate illegally.
(7) At the same time of mechanical and electrical equipment maintenance, safety protection and safety devices are not included in the maintenance plan.
(8) In the absence of safety production guarantee measures, arrange workers to spell equipment, physical strength, time and speed.
(9) The oil production team will continue to organize operations after issuing the notice of production suspension.
2, whether there is illegal operation phenomenon, mainly including:
(1) Operation error, ignoring safety and warning.
Such as: start and shut down the machine without authorization, without causing unexpected rotation and power supply signal, forgetting to turn off the equipment, ignoring warning signs and warning signals, and improper operation (refers to the operation of buttons, valves, handles, etc. ), operation, machine overspeed operation, drunk operation, live operation.
(2) Adventure into a dangerous place.
Such as: unauthorized access to dangerous trampling areas without safety facilities, unauthorized access to tanks for operation or fishing.
(3) Climbing or sitting in an unsafe position (such as platform guardrail, equipment and operating equipment).
(4) Maintenance, repair, inspection, adjustment, welding and cleaning of mechanical equipment in operation.
(5) Personal protective equipment and appliances must be used, but not in operation or occasions.
Such as: no protective gloves, no safety helmet, no dust mask, no insulated water shoes, no lighting tools, no work clothes and no safety belt.
(6) Unsafe clothing.
For example, when working near equipment with rotating parts, wear thick clothes without buttons, and wear gloves when operating equipment with rotating parts.
3, whether there is a violation of labor discipline, labor discipline mainly includes:
(1) Arrive at work at the specified time and place, and it is forbidden to leave without leave, leave without leave, or ask for leave according to regulations (attendance discipline).
(2) Complete the tasks (production and work discipline) with good quality and quantity according to the responsibilities and regulations of production and work posts.
(3) Strictly abide by the technical operation procedures (safety discipline).
(4) Save raw materials and take good care of the property and articles of the employer (daily work and life discipline).
(5) Discipline and other regulations closely related to labor work, such as leaving the post, sleeping at the post, leaving the post, and prohibiting drunken posts (other disciplines).
Time and form of remedy of intransitive verbs
The "anti-three violations" special rectification activities are long-term and are carried out in three stages.
(1) Mobilization and deployment stage (April1-April 10).
The oil production team has formulated a special rectification plan and issued a document to mobilize and deploy the special rectification work, requiring all functional groups, professional workstations and oil production stations to clarify the division of responsibilities, widely publicize and launch, and create a good atmosphere.
(2) Comprehensive investigation and handling stage (April10—February 20th 18).
All functional groups, professional workstations and oil production stations closely combine the investigation and treatment of hidden dangers in safety inspection, find out the phenomenon of "three violations" in their own groups and stations, carefully analyze the causes of "three violations", carry out rectification work, strengthen team-level training and safety education, and enable employees to develop good work habits. The Safety and Environmental Protection Group specially organizes leak detection and vacancy filling, focusing on problems such as inadequate publicity and education, inadequate measures, inadequate rectification of "three violations" and inadequate implementation of "three violations"; Well groups and stations with slow progress in rectification and implementation will be dealt with seriously.
(3) Summary stage (from February 20th 12 to February 30th 12).
The safety and environmental protection group is responsible for summarizing the special rectification activities of "three violations" and forming summary materials.
- Related articles
- Slogans are written quickly.
- Pinyin of shifted characters
- The development history of fast reading
- 625 National Land Day Work Summary
- Blessing message to the graduating seniors and sisters.
- How to get from Jinping, Yunnan to Liping County, Guizhou
- Beekeeping 10 taboo formula
- New employee slogan
- How many points does the national rural revitalization key help county senior economist exam score line have?
- Are Tibetan public toilet slogans in Chinese characters?