catalogue

1 safety production management system

2, safety inspection system

3, safety duty system

4, safety accident reporting system

5, civilized construction management system

6, the construction site fire safety management system

7, special operations personnel management system

8, safety technical disclosure system at all levels

9. Security team activity system

10, civilized construction measures without disturbing people

1 1, special rectification measures to prevent falling accidents.

12, special treatment measures for electrical engineering

13 company's emergency rescue plan

14, project manager safety work responsibility system

15, project foreman safety work responsibility system

16, safety personnel work responsibility system

17, team leader safety work responsibility system

18, production worker safety work responsibility system

19 company safety management punishment regulations

20, the project department safety data content

2 1 45 safety education for workers' admission

22, construction safety inspection score summary table

Safety production management system

1. Implement the national and local laws and regulations on safety production and the company's safety management rules and regulations.

2, establish and improve the responsibility system for production safety of production management personnel at all levels and front-line workers.

3, the project safety measures must be complete and in place. Safety technical data must be complete, no construction is allowed without safety measures, and safety facilities without acceptance are not allowed to be used.

4, adhere to the special type of work related certificates, the special type of work in accordance with the provisions, physical examination, training, assessment, issued a certificate; Untrained operators are not allowed to work at their posts.

5. Conduct safety education for employees on a regular basis, and conduct "three-level" safety education for new workers after admission. New workers and changing workers are not allowed to enter the site without safety education examination.

6, inductrial injury accident report in time, the attempted accident responsible for serious processing.

7. Safety nets, safety belts and safety helmets must have material certificates. Safety nets and safety belts that have been used for more than half a year must be inspected before use.

8, mechanical equipment safety device is complete and effective, hand-held power tools must be all installed leakage protector.

9, construction electricity conforms to the safety operation procedures.

10, no mechanical equipment is allowed to work in spite of illness.

1 1. For projects with new technologies and special structures, operation methods and safety education must be conducted before they can be employed.

12. On the basis of safety education, organize a safety knowledge examination for all employees every six months.

13, adhere to the safety duty system of leaders at all levels and production technology leaders, and each shift must have a safety attendant.

14, earnestly implement the inspection system, and implement the hidden danger treatment results and punishment regulations.

Safety inspection system

This system is formulated according to Article 38 and Article 59 of the Law of People's Republic of China (PRC) on Safety in Production and JGJ59-99 Standard for Safety Inspection of Building Construction by the Ministry of Construction.

In order to strengthen the company's safety production supervision and management, conscientiously implement the policy of safety first, prevention first, comprehensive management and prevention by groups, promote the standardization and institutionalization of safety supervision and inspection, seriously investigate and deal with illegal acts in the process of safety production and eliminate unsafe hidden dangers, clarify key points and implement rectification to ensure safety production.

I. Contents of safety inspection

1. Check ideas and systems. First of all, check whether the project manager has correct thoughts and understanding on strengthening safety production and whether he often organizes teams and groups to learn safety production knowledge; Secondly, check whether the post responsibility system for safety production is implemented, whether full-time safety personnel are equipped according to regulations, and whether employees' industrial accidents are reported and handled according to regulations.

2. Check the site and find hidden dangers. Mainly go deep into the construction site to check whether the production equipment, facilities, safe electricity consumption, civilized construction and fire control facilities meet the requirements of safe production, especially the working environment of major dangerous point sources and the implementation of safety precautions.

Second, the safety inspection requirements

1. The Quality and Safety Department of the company is responsible for the monthly safety inspection and special inspection of each construction project department. Complete the monthly inspection of safety production at the end of each month, and implement the scoring system to evaluate the safety production on the construction site.

2. Special safety inspection (temporary electricity utilization, construction machines and tools, fire prevention, etc.). ) The leaders in charge of the company lead the team to organize the safety technicians of the Quality and Safety Department and the Project Department to carry out special safety inspections at least three times a year. Check the score into the project department safety year-end assessment.

3. The project department is led by the project manager to organize relevant personnel (full-time security officer, technical director, construction foreman and team leader) to conduct a major inspection of facilities, equipment, fire control and environmental sanitation within the construction scope, find problems in time and eliminate unsafe hidden dangers in time.

4. The project full-time safety officer shall carry out daily safety inspection and be responsible for the self-inspection within the construction scope. Its main tasks are: ① to find and correct illegal command, illegal operation and violation of labor discipline in time; (2) Timely discover the omissions of safety protection facilities and rectify them; (3) Supervise the workers at the production site to abide by the rules and regulations and safeguard the property interests of the company; (4) Supervise and manage temporary electricity facilities to prevent disorderly connection; (five) safety education for illegal workers; ⑥ Handle the safety work affairs at the production site.

Third, the rectification measures of safety inspection

1. Inspection is the means and rectification is the purpose. The problems found in the inspection should be fixed by personnel, measures and time limit. It is necessary to check and change, implement everything, and implement the responsibility for rectification to people.

2. The monthly, weekly, daily and quarterly safety inspection of the company and the project department shall be recorded in written form and incorporated into the safety management account. Hidden dangers found should be reported orally or in writing, and major hidden dangers must be reported in writing.

3. If the project department fails to rectify the hidden dangers of accidents according to regulations, it will give informed criticism and economic punishment and make corrections within a time limit; In case of an accident, the person in charge of the project department and relevant management personnel will be held accountable.

Safety duty system

1, the project department implements the leadership safety duty rotation system to ensure safety in production. Every day, people are in charge, hidden dangers are rectified and measures are implemented.

2. In the construction site approved to work overtime at night, the builder, technician and electrician must be arranged to be on duty at the scene to supervise and direct safety production. Electricians must manage temporary electricity consumption and do a good job in on-site lighting. Non-electricians are forbidden to install, dismantle and move distribution facilities.

3. When working overtime on holidays or going to work early, the project foreman, on-site safety engineer and electrician must arrive at their posts and do a good job in safety management, safety protection and safety supervision.

4, the security officer on duty is responsible for collecting safety information and carefully record, truthfully report, special circumstances timely report to the project leader.

5. The security personnel on duty should hand over the work, problems solved, problems that should be paid attention to and problems that need to be solved in the next shift to the next shift, and the successor should handle the unresolved problems handed over by the previous shift in time and record the handling situation in detail.

6, the project manager should regularly or irregularly check the safety officer on duty, to perform their duties, found that the safety officer on duty is off duty or irresponsible, severely criticized, timely replacement of incompetent safety officer on duty.

7, the project manager should often go deep into the site, timely deal with the problems reflected by the security officers on duty at all levels, and coordinate the site to eliminate hidden dangers of accidents.

The security personnel on duty have the following responsibilities:

1. The personnel on duty shall be responsible for the safety production of the unit during the safety duty.

2. Supervise and inspect the implementation of various safety systems and measures.

3, solve and deal with the problems of production safety in construction.

4. Correct the illegal command and operation in the construction.

5. Report the hidden dangers of accidents on the construction site to the competent leader in time, and urge to eliminate the hidden dangers of accidents on the construction site in time.

6, completes the duty record, truthfully record the construction site safety situation, accident hidden trouble rectification, accident or attempted accident treatment, etc.

Safety accident reporting system

1. Purpose: In order to ensure timely and accurate reporting, investigation, treatment, formulation and adoption of preventive measures for employees' work-related injuries and deaths, and ensure safe production, this system is formulated in accordance with the Law on Work Safety, Order No.493 of the State Council, Order No.3 of the Ministry of Construction and Regulations on Reporting, Investigation and Handling of Work Safety Accidents.

The second is to standardize the accident report in the company's safety process; It is suitable for handling casualty accidents in the production process of the company.

Third, responsibilities:

1. The Quality and Safety Department is responsible for general minor accidents, and puts forward relevant handling opinions and reports them to the General Manager for approval.

2. Each project department: report the accidents in the project department to the Quality and Safety Department and cooperate with them.

Four. Terminology:

1. Work-related accidents: refers to the casualty accidents of employees engaged in work-related activities.

2. Fatal accident: refers to the accident that caused 1 ~ 2 deaths.

3. Major fatal accident: refers to an accident in which more than 3 people died.

4. Serious injury accident: refers to an accident that causes employees' physical disability or slight organic or organic damage such as vision and hearing, and causes long-term dysfunction of human body and loss or partial loss of labor force. Accidents are usually accompanied by minor injuries, but no one dies.

5. Minor injury accident: refers to an accident in which only minor injuries occur, such as some organic or minor injuries, which show slight or temporary loss of working ability. Injured employees usually stop working for more than one working day, but the situation is not serious enough.

6. Equipment accident: an accident occurred during the transportation, installation and use of equipment.

7. Traffic accident: refers to the accident that occurred in the process of road traffic.

8. Falling accident from a height: an accident in which an operator falls while working or walking from a height.

9. Liability accident: refers to the accident caused by human negligence.

10. No-responsibility accident: refers to an accident caused by unforeseen or irresistible changes in natural conditions.

1 1. Destructive accident: refers to an accident deliberately fabricated by some people to achieve the intended purpose.

Verb (short for verb) workflow:

1, accident reporting scope (which accidents need to be reported to the quality and safety department):

2. Equipment accident: an accident with economic loss exceeding 1000 yuan or casualties.

3. Fire accident: fire alarm and fire accident.

4. Traffic accidents: accidents in which the loss of traffic accidents exceeds 654.38+10,000 yuan or there are casualties.

5. Falling accident from height: falling accident from height, or falling accident from height with casualties.

6. Object strike accident: an accident in which an object strike causes casualties.

7. Other accidents: accidents related to the company's production, resulting in economic losses exceeding 654.38 million yuan, or causing social impact or casualties (serious injuries).

8. Accidents that each project department thinks need to be reported.

Six, the time limit and method of accident report:

1. If one person is seriously injured or the economic loss is less than 3,000 yuan, please call the Quality and Safety Department of the company within 1 hour after the accident.

2. Accidents that seriously injured more than 2 people, fatal accidents, accidents with economic losses exceeding 3,000 yuan, and accidents with increasing losses shall be reported to the Quality and Safety Department of the company by telephone within 30 minutes after the accident.

3. For the accident reported by telephone, a written accident report shall be submitted within 3 days after the accident.

4. Written contents include: time, place, personnel, cause, process, result, losses that have been caused, measures that have been taken and losses that are still continuing; The contents of the telephone report include: time, place, consequences that have happened, and the loss is still going on.

5. The accident can be reported to the direct leader, company leader, other management personnel on site, safety engineer (team) or the quality and safety department of the company in any way.

Seven. Accident emergency response

1. The emergency response to accidents shall be reported to the higher authorities and the local, municipal and county-level construction administrative departments as soon as possible in accordance with the No.3 Order of the Ministry of Construction "Regulations on Reporting and Investigation Procedures for Major Accidents in Engineering Construction".

2 accident emergency should adhere to the principle of "people-oriented", and the unit that has an accident should first rescue the wounded and other people who may endanger health in time.

3. If the accident losses continue to expand, the top management and professional responsible personnel at the scene of the accident should immediately organize rescue. If there are different opinions, the opinions of the on-site professional responsible personnel shall prevail.

4. After the accident persistence is controlled, take measures to prevent and protect the site.

5. The company that fails to report the accident will impose heavy penalties on the project department and project leader according to the company's reward and punishment system.

Civilized construction management system

This system is based on 19991February 15 No.2001formulated by the Ministry of Construction 15 and the construction safety inspection standard JGJ59-99.

A, construction personnel dressed neatly, civilized behavior, enter the construction site must wear safety helmet.

Second, the basic practice of civilized health management on the construction site:

1. Safety operation instructions, list of operators and warning signs must be hung on mechanical equipment;

2. Site materials shall be stacked according to the general construction plan;

3. The safety protection facilities are neat and beautiful, and the site is clean and tidy;

4. Keep the office space bright and clean, with good environmental sanitation.

5, production workers follow the rules;

Third, finished product stacking:

1, the materials on the construction site shall be classified and stored neatly according to the specified location, so as to be flush, straight and generally high.

2, pipe specifications, models, neatly stored, tools, shall not occupy the road, to prevent traffic jams affect the construction.

3. All kinds of gas cylinders are dangerous goods, so they should be kept away from naked flames 10M when stored and used.

4, acetylene bottle upside down is prohibited, to prevent the danger of acetone overflow.

Four. Management of construction vehicles: Before driving out of the construction site, the construction vehicles must be cleaned according to the actual situation, so as to remove dirt and dust from tires and car shells and prevent roads and streets from being polluted.

Verb (abbreviation for verb) construction noise, dust prevention and pollution prevention:

1, the construction site should abide by the national environmental protection laws and regulations, and control the hazards of dust, waste water, noise and vibration to the surrounding environment.

2. When constructing in urban areas, effective measures should be taken to reduce the noise of construction machinery that produces noise and vibration. After night 10, no overtime is allowed at the construction site without the approval of the government urban construction management and supervision department and the relevant procedures.

3, the noise generated by the construction site should take corresponding measures, must be controlled within 85 decibels.

4. Construction sewage and mud shall not overflow to the frontage pavement and outside the construction site. Sewage and mud must be precipitated and discharged into urban drainage facilities and rivers.

5. It is forbidden to melt asphalt, paint and other toxic and harmful substances, smoke and toxic gases at will at the construction site.

6. It is strictly prohibited to throw down the construction waste of high-rise and multi-storey buildings from high altitude.

7, it is forbidden to use toxic and harmful waste as earthwork backfill.

8. The project manager of each construction site is responsible for the dust prevention, pollution prevention and noise prevention of the production line, and is fully responsible for the environmental protection work in the production activities of this project.

Six, civilized life:

1, dormitory must have a health management system, health watches, keep the windows bright and clean, well ventilated, no smell.

2. All kinds of articles in the dormitory are neatly arranged, clean and beautiful.

3. The garbage cleared in the dormitory must be transported to the designated garbage dump for stacking.

4. In summer, effective measures should be taken to ensure cooling and mosquito bites.

5 to ensure the establishment of water supply facilities that meet the national drinking water standards.

6. Without the permission of the company, it is forbidden to use electric furnaces and other heating equipment.

Fire safety management system in construction site

According to Article 10 and Article 11 of the Fire Protection Law, this system is formulated.

1, the general layout, construction method and construction technology of the construction site should meet the needs of fire safety.

2, before construction, according to the measures and requirements of fire prevention work in the construction organization design, configuration and construction scale to adapt to the fire fighting equipment and equipment.

3. The minimum safe distance between the welding and cutting operation point and dangerous goods such as oxygen cylinders and acetylene generators shall not be less than10m; The minimum safe distance from inflammable and explosive articles shall not be less than 30m.

4. The welding and cutting operations on the construction site must meet the fire prevention requirements, and the "ten no-burning" regulations shall be strictly implemented.

5, the construction site with fire must strictly fulfill the examination and approval procedures, and arrange personnel management supervision, isolation measures should be taken when necessary.

6. Temporary electricity consumption on the construction site must be set in strict accordance with the requirements of Technical Specification for Temporary Electricity Safety, and the management of electricity consumption should be strengthened to prevent electrical fire.

7, the project under construction shall not be used as accommodation, and personnel shall not stay in the construction site. It is forbidden to make a fire, cook and keep warm at the construction site.

8, construction personnel, security personnel on duty shall not use firewood, electric stove, kerosene stove and other open flames to keep warm in the construction site and warehouse and duty room.

9. The company and various project departments are responsible for regularly organizing fire safety publicity and education, popularizing fire protection knowledge and enhancing employees' fire prevention awareness.

10, each project department is responsible for organizing the fire prevention inspection of the department on a regular basis to eliminate fire hazards in time.

1 1. Once a fire accident is found, all employees should actively participate in the disaster relief work and call the police (1 19) in time.

12. All departments of the company will be severely punished for violating the fire control system, and those who cause fire accidents will be severely punished according to the circumstances until they are sent to judicial organs for criminal responsibility.

Management system for special operators

According to Article 23 of the Law of People's Republic of China (PRC) on Work Safety, this system is formulated.

1. According to the actual situation of our company, special operators include: electricians, welders, scaffolders, machine operators, etc.

2, special operations personnel must be at least 18 years old, serious and responsible work, good health, no diseases and defects that hinder the safe operation of this type of work.

3, special operations personnel must be approved by the provincial administrative department of construction safety technical training, and passed the examination, obtain the operation certificate before they can work independently.

4, special operations personnel must hold relevant certificates, it is forbidden to operate without a license.

5, the company must strengthen the management of special operations personnel, do a good job of declaration, training, assessment and review, the project department to strengthen the daily management of special operations personnel, to ensure safety in production.

6, special operations personnel by the project department to establish a unified file, submitted to the company's quality and safety department for the record, organize no less than once a year safety operation retraining.

7, special operations personnel to leave the post of special operations for more than a year, must be re safety technical assessment, qualified rear can engage in the original special operations.

8. The operation certificate of special operations personnel shall not be forged, altered or lent.

9, special operations personnel illegal operation, depending on the circumstances to give criticism and education, causing serious consequences to the state judicial organs.

10, special operations personnel must accept safety technical disclosure before operation.

Safety technical disclosure system at all levels

This system is formulated according to Article 38 of the Building Law of People's Republic of China (PRC) and JGJ59-99 "Safety Inspection Standard for Building Construction" implemented by the Ministry of Construction.

Purpose of disclosure: to clarify the responsibilities of safety technical disclosure at all levels, ensure that construction personnel are familiar with the safety technical operation requirements of this type of work, and eliminate the hidden dangers of accidents caused by violation of operating procedures.

Scope of application: safety technical disclosure and management of construction workers by the project department of the company.

A, disclosure responsibility:

Quality and Safety Department: provide the project department with safety technical operating rules and industrial technical specifications and standards.

Project Department: responsible for safety technical disclosure to the foreman, management personnel, team leader and production workers of this department.

Operation team: responsible for pre-shift safety activities and safety technical disclosure before team operation.

Second, the workflow:

1, the quality and safety department collects the safety technical operation procedures of each type of work and provides them in time according to the requirements of the project department.

2. When the project department arranges work tasks for the operation team and production workers, it must carry out safety disclosure by division (sub-item); When the project enters the continuous construction stage, the project department shall make safety technical disclosure to the operation team and workers at least once a week, and make safety technical disclosure irregularly according to the needs of the project construction.

3, the project department to the foreman, team leader and homework personnel pre-service safety technical disclosure, fill in the division (disciplines) safety technical disclosure in writing, signed by the disclosure personnel, included in the project department safety production management account.

4. Before going to work every day, the operation team must organize pre-shift safety activities and make safety technical disclosure to the personnel participating in post operations. The disclosure is recorded in the Activity Record of Security Team and signed by the disclosed person. The activity records of the safety team shall be submitted to the project department for inclusion in the safety production management account.

5. If the project department fails to perform the duties of safety technical disclosure, it shall be ordered to stop work and return to work after safety technical disclosure.

6, the project department did not carry out special construction safety technical disclosure, causing casualties, the project department and the person in charge of the accident site should bear the corresponding responsibility.

Security team activity system

This system is formulated according to JGJ 59-99 "Standard for Building Safety Inspection" and Jian Jian [1997] No.83.

1, the team leader is responsible for the work of the safety team, conscientiously implements the safety production rules and regulations and safety operation procedures, reasonably arranges the work tasks of the team members, and is responsible for the safety and health of the team members.

2, regularly organize team members to learn safety operation procedures, supervise team members to use labor insurance supplies correctly, and improve the self-protection ability of team members.

3. Implement pre-shift safety activities, explain the safety matters that should be paid attention to in production activities to the operators, and check whether the operators use labor protection articles correctly.

4, must carry on the shift safety disclosure, adhere to the team leader don't violate the rules and regulations command, operators don't risk foolhardy.

5. Regularly check the safety production status of the shift operation site, and timely discover and correct violations.

6. Without safety education, operators are not allowed to work at their posts.

7, the team without safety disclosure shall not arrange workers to work at his post.

8. Workers working at heights shall not work at heights without labor protection articles.

9. To organize safety team activities, the "Record of Safety Team Activities" must be carefully made and submitted to the person in charge of on-site safety technology for inclusion in the "Safety Management Industry Data".

Civilized construction measures without disturbing people

This measure is formulated according to the Environmental Hygiene Standard for Construction Sites (JGJ 146-2004).

A, the noise of the construction site must take corresponding control measures, the noise generated in the construction activities shall not exceed 85 decibels;

2. Do not work overtime after 10 at night, except in special circumstances;

Three, allowed to work overtime at night:

1, construction in remote areas far away from residential areas;

2. If the engineering design requires continuous construction and concrete pouring to ensure the engineering quality, and it is approved by the engineering headquarters and the municipal supervision and management unit of the government, you can work overtime at night and report the overtime approval form to the security department for the record.

In principle, students from all over the country are not allowed to work overtime at night during the college entrance examination. Under special circumstances, overtime work shall be strictly examined by the engineering headquarters and the quality and safety department of the company, and then reported to the municipal supervision department for approval. Without the written approval of the municipal supervision department, no overtime is allowed.

5. In the construction site where overtime is allowed at night, the site must be managed according to the company's "noise prevention, dust prevention and pollution prevention measures", and the foreman, builder, engineer and electrician should be on duty at the site to ensure lighting and safe production.

Special rectification measures to prevent falling accidents from high places

These measures are formulated in accordance with the Notice of the Ministry of Construction on Printing and Distributing Several Provisions on the Prevention of Falling Accidents in Construction Projects and Several Provisions on the Prevention of Collapse Accidents in Construction Projects [2003] No.82.

In order to conscientiously implement the spirit of the Notice of the Ministry of Construction and the Sichuan Provincial Department of Construction on Special Remediation of Building Construction against Falling Accidents, effectively curb and prevent falling accidents within the construction scope of our company, and achieve the annual management objectives of safe production and civilized construction of our company, the following measures are formulated in combination with the actual situation of our company to guide the company's building construction against falling accidents.

First, set up a leading group for the special rectification of the company's buildings against falling accidents:

1. Team leader: Peng Jun (team leader in charge of production)

2. Team members: Yang Jian, Xu Longyao, Wang Bing (member of the Quality and Safety Department of the Company) and the project manager.

Second, the division of responsibilities:

1. Leading group for special rectification work: responsible for overall leadership and monitoring, planning, giving instructions, information collection and processing, work guidance and coordination, inspection and implementation of special rectification work for preventing falling accidents from heights.

2. Team leader: responsible for planning and organizing the specific work of special rectification, arranging, inspecting, guiding, coordinating and releasing information, and organizing the summary meeting of special rectification work.

3. Team members: organize and implement the special rectification work and safety management responsibilities of this post to prevent falling accidents; Responsible for collecting information on special rectification work and reporting to the team leader; Responsible for the implementation of the special rectification plan; Responsible for the special rectification and publicity work of this unit; Actively participate in regular and irregular meetings of the leading group for special rectification work.

Three, the content of special rectification work:

Publicity and education:

1, the remediation leading group will hold a special remediation symposium at least once a month to inform the implementation of remediation work and put forward improvement measures in view of existing problems.

2, team members according to their respective regulatory scope and responsibility area of the construction site, for all migrant workers at least once a month for special rectification education.

3, the use of blackboard newspapers, slogans and other forms to expand the anti-fall special rectification publicity.

(2) the construction site reconstruction:

4. Safety protection of edges and holes: the wellhead of the pipeline, all kinds of reserved holes and the edges of various heights must be well protected.

◆ Practice and requirements:

1. The elevation of the pipeline wellhead shall be fixed and closed with reinforced doors, the height of which shall not be lower than 1.5m or fixed and closed with laminated plates, and warning signs shall be hung. A horizontal safety net shall be hung in the elevator shaft every 10m.

2. The reserved hole on each floor should be closed and fixed on the plane less than 1.5m. Besides the plane, protective railings with the height of1.5m should be added around the hole larger than1.5m..

3. All limb operators and operators outside the frame must hang up their safety belts for operation.

5, other measures to prevent falling:

All kinds of workers who climb high, climb high, work outside the frame and work on the outer wall of more than 2m must fasten their seat belts, and those who do not use or use seat belts are not allowed to work.

(3) Inspection and rectification:

1, each construction project department shall conduct self-inspection once a week and conduct a special inspection on the implementation of fall prevention measures once a month.

2. For the general problems that cannot meet the requirements of this measure, the members of the on-site falling prevention team will verbally inform the on-site foreman and urge the rectification. For outstanding or serious problems, a "written rectification notice" will be issued to the site foreman, who will organize personnel to carry out rectification according to the "notice" and track and review the rectification effect. Serious problems should be reported to the "Leading Group for Remediation of Falling Accidents from a Height", and the group leader should issue a shutdown rectification instruction, which should be recorded in the "Safety Production Performance Assessment" of the production department in that year. At the same time, the person in charge of the "Leading Group for Preventing Falling Accidents from High Places" led a team to the site to urge rectification.

3, in a construction year, where a fall accident occurs, causing casualties, according to the cause of the accident, the responsibility is divided, and the relevant project department head and the person directly responsible (foreman or project manager) are punished for the company's administrative and economic responsibilities. Those who violate the laws of the state shall be handed over to the relevant judicial organs of the state for handling.

Special treatment measures for electrical engineering

This method is formulated in accordance with Technical Specification for Temporary Electricity Safety in Construction Site (JGJ46-2005).

First, the temporary electricity consumption on the construction site must be connected in strict accordance with the specifications. All equipment must be connected to zero or ground protection, and leakage protection devices must be installed.

Two, installation, maintenance or removal of temporary electricity projects, must be completed by an electrician, electrician level should be adapted to the difficulty of the project and technical complexity. When inspecting and maintaining the distribution box and switch box, the corresponding power switch at the next higher level must be turned off, and power-off signs should be hung. Live working is prohibited.

3. All distribution boxes and switch boxes must be used in the following operation sequence: power transmission operation sequence: main distribution box-distribution box-switch box; Power outage operation sequence: switch box-distribution box-main distribution box. Sundries shall not be piled up in the distribution box and switch box, and rainproof measures shall be taken.

Four, distribution box, switch box should be installed correctly, firmly, switch electrical appliances in the box should be fixed on the electrical installation board according to its designated position, shall not be skewed or loose, and shall not appear bare thread. All distribution boxes and switch boxes shall be marked with numbers, names and purposes, and closed and locked at ordinary times.

B