Joke Collection Website - News headlines - Development course of Zijinshan gold and copper mine

Development course of Zijinshan gold and copper mine

The annual output of gold in this mine increased from 8.5 kg when it was built in 1992 to 20 kg in100/6227 kg, an increase of 1908 times. The main economic indicators and technical indicators have reached the international advanced level, creating a record of the largest available gold resources, the largest gold output, the largest mining scale, the best economic benefits and the fastest development speed. In March 2008, it was awarded the honorary title of "the largest gold mine in China" by China Gold Association. Since Zijinshan Copper Mine was put into production in 2006, the production system has been gradually strengthened, and it is expected to form the second largest copper production base in China with an annual output of 80,000 tons in the near future.

At present, the accumulated proven gold and copper resources in Zijinshan Gold and Copper Mine have reached 305 tons, and the amount of copper metal is more than 3 million tons. The main products are mineral gold, mineral cathode copper, copper concentrate and sulfur concentrate.

Zijinshan gold and copper mine strengthens ecological restoration in the process of development, develops in protection and recovers in development. By 20 10, a total of 33,858,200 yuan had been invested in vegetation restoration, and it was successively rated as the first batch of national industrial tourism demonstration enterprises and the first batch of national mine parks.