How to analyze the budget of site enclosure

Quota can't cover all the construction contents on site, and there is no suitable quota for "site enclosure" like this.

A, site Dang Wei standard:

The construction site must be closed and managed according to the Hygienic Standard for Capacity of Construction Sites in Beijing, and the enclosure height should not be less than1.8m. The shell color should be light blue, gray or white to avoid pollution and paint loss. The enclosure can be painted with light blue, gray or white paint to spray the construction enterprise logo and project name. The setting standard of construction enterprise logo and project name is: "XXX Company undertakes XXX project", the font is imitation of Song Dynasty, the font size is 0.6m×0.8m (width× height), and the lower edge of the font is 0.6-0.8m from the ground. Fonts must be correct, standard, neat and beautiful. The enclosure shall not be used for retaining soil and bearing load, and shall not rely on the enclosure to pile up articles and materials, and shall not be used as a fence to set up temporary sheds, canteens and toilets. The general construction contractor is responsible for the setting and management of the enclosure on the construction site. The construction unit shall be responsible for the enclosure that has not yet been built, and the enclosure management unit shall do a good job in the maintenance and cleaning of the enclosure, keep the enclosure clean and tidy, and shall not arbitrarily post, scribble or depict it. Where slogans and publicity materials are set above the enclosure, they shall be set in accordance with the scope, location, quantity, specifications, content and time limit approved by the municipal administrative department. It is forbidden to use the enclosure on the construction site to set up outdoor advertisements. If the enclosure is not set as required on the construction site, it shall be punished by the municipal and district urban management law enforcement departments according to law; The municipal and district construction committees will order them to make corrections within a time limit or stop work for rectification. If no correction is made within the time limit, it shall be handed over to the municipal and district urban management law enforcement departments for handling.

Second, how much is the site enclosure per square meter?

Fencing price range: extruded board 50- 120 per square meter, also brick, calculated at 200-280 per cubic meter. Fencing refers to the measures taken to isolate the construction site from the external environment and make the construction site a relatively closed space, including the area of masonry materials.