Ground-breaking operation safety management system?

What are the details of the safety management system for ground-breaking operations? Zhong Da Consulting will explain it for you.

Chapter I Definition and Scope

Article 1 Ground-breaking operations refer to excavation, piling and anchor-penetrating operations with a depth exceeding 0.5m; The ground load is above 50Kg/cm2; Use bulldozers, road rollers and other construction machinery to fill or level the site.

Article 2 Scope of ground-breaking operations: ground-breaking operations organized and implemented by enterprises in production areas and living areas.

Third qualified foreign units in the area of the enterprise to carry out ground-breaking operations, if its operations affect the enterprise and endanger safety, it should be stopped in time.

Chapter II Safety Requirements for Ground-breaking Operations

Article 4 Reliable safety measures should be taken before ground-breaking operation, and the ground-breaking safety operation certificate must be obtained, and the operation can only be carried out after approval. No ground-breaking operation is allowed without a ground-breaking safety operation certificate.

Article 5 Before the ground-breaking operation, the project leader shall conduct safety education for the construction personnel. The person in charge of construction shall make on-site disclosure of safety measures and supervise their implementation.

Article 6 Guardrails, cover plates and warning signs shall be set up at the construction site for ground-breaking operations, and red lights shall be hung at night to warn them. After the construction, backfill soil and restore ground facilities in time.

Seventh ground-breaking operations must be carried out in accordance with the contents of the ground-breaking safety operation certificate. If the examination and approval procedures are incomplete and the safety measures are not implemented, the construction personnel have the right to refuse the operation.

Article 8 It is strictly forbidden to alter or lend the work permit for ground-breaking safety, and it is not allowed to change the content of ground-breaking work, expand the scope of work or transfer the work site without authorization.

Article 9 When cables, pipelines and unrecognizable articles are exposed during ground-breaking operations, the operations should be stopped immediately, properly protected and reported to the ground-breaking examination and approval department for handling. Only after taking measures can the ground-breaking operations be continued.

Article 10 The ground near underground concealed facilities should be dug lightly, and mechanical tools such as iron bars, pickaxes or grab buckets are strictly prohibited.

Eleventh digging pits, ditches, wells, ditches and other operations, should comply with the following provisions:

1. Earthwork excavation shall be carried out from top to bottom, and footing excavation is not allowed. Excavated earth and stone shall not block sewers and manholes.

2. When digging deep pits, grooves, wells and ditches, it is forbidden to dig holes in the earth wall to climb, and a springboard must be laid. You must wear a safety helmet at work. You are not allowed to stand or walk on the upper edge of a pit, trough, well or ditch.

3, according to the soil, humidity and excavation depth set up safety slope or solid wall bracket. The excavated soil stacking place and stacked materials shall be at least 0.8m away from the edges of pits, grooves, wells and ditches, and the height shall not exceed1.5m.

4, pit, groove, well, ditch slope or solid wall support should be checked at any time. Especially during the period of rain, snow and thawing, if the slope is found to be cracked, loose or the support is broken or displaced, the work should be stopped immediately and measures should be taken.