Information and pictures of the three-proof knowledge tabloid about electricity, theft and fire prevention? (Urgently needed!!!)

1. Safety production

1. The project manager responsibility system is implemented for safety production at the construction site (construction site). Establish and improve the safety organizational guarantee system, formulate and improve the safety production management system, and ensure that the personnel are in place and the responsibilities are assigned to each person.

2. The construction site (construction site) must have good construction environment and operating conditions, and all personnel entering the construction site must comply with the construction site safety management regulations (system).

3. Construction workers must undergo safety production education before taking up the job, and should be prepared with safety production manuals or instructions for each type of work, and each employee must have one copy. Special types of work must receive professional training and hold a certificate before starting work.

4. Necessary reminders, warnings and other safety signs should be set up at the entrance to the construction site and dangerous work areas to avoid possible accidental injuries.

5. At the construction site, fire protection, electricity protection, explosion protection and fall protection must be carried out.

(1) Relevant national fire protection regulations must be complied with. Various fire protection facilities are fully equipped and are in charge of dedicated personnel, with frequent inspections and regular replacements. Fire sources must be prohibited from entering key fire protection areas such as the storage of flammable materials in oil depots.

The layout of power supply circuits and the use of electricity for construction must comply with regulations and regulations on safe electricity use, and should avoid obstructing normal operations and traffic. )2(

Before blasting operations, you must report to the local public security department for approval. The use and management of pyrotechnics products must comply with relevant national regulations. The transportation and storage of pyrotechnics products must accept the supervision, guidance and supervision of the local public security department. Management. )3(

Relevant operating procedures must be followed when working at heights, necessary safety nets or protective railings must be set up, and safety belts and other protective equipment must be used depending on the specific situation.) 4(

6. The construction site must eliminate the "three violations" of illegal command, illegal operation, and violation of labor disciplines.

7. The construction site should establish a complete maintenance and repair system for machinery and equipment to ensure the normal safety of machinery and equipment.

8. The construction unit should strengthen construction safety management during the flood season, establish a flood prevention organization, formulate a complete and feasible emergency plan, organize a flood prevention and rescue team, and prepare necessary rescue materials for 20 days during the flood season. Four-hour duty and leadership shift system.

9. Units that carry out pile foundation construction in rivers and ditches must arrange the project progress reasonably and try to avoid construction during the flood season or on the river bed. Where there are campsites and construction materials are stored, practical safety and flood prevention measures must be taken.

10. The borrow pits and spoil pits of the construction unit shall be processed and maintained in a timely manner in strict accordance with the water and soil conservation design requirements. , to prevent soil erosion, landslides, and blocked rivers.

11. The management office will conduct regular and irregular inspections on the safety production of each construction contract section, and will suspend work if there are potential accidents. Rectification.

12. If a highway project under construction collapses or is scrapped due to negligence, causing casualties or significant economic losses, the construction unit must report it to the management office and relevant departments in a timely manner in accordance with regulations.

13. The classification of highway engineering accidents, the reporting time limit and the reporting content shall be implemented in accordance with the "Highway Engineering Quality Accident Grading and Reporting System" of the Ministry of Transport. For major quality and casualty accidents, the construction unit must be within 1 hour of the accident. Management Office and other administrative departments. And report the "Highway Project Major Accident Report" within 8 hours. 14. In the bidding process of this project, the safety production quality of the construction enterprise is the first choice. As an important part of the project, construction companies are required to comply with the requirements for production safety in the bidding documents. Each construction unit must specify production safety measures in the overall construction organization design before starting work.

15. Have the knowledge and ability to supervise safe production on construction sites, understand the rules and regulations of safe production, conscientiously perform corresponding duties and obligations, and promptly correct any safety hazards discovered.

2. Civilized construction

1. The construction enterprise shall design the construction organization well before starting the work, and draw the overall layout plan. The layout shall be reasonable, the civilized responsibility areas shall be clearly divided, and clear signs shall be set up to indicate the name of the project and the project. Overview, the names, construction start date and planned delivery date of the construction unit, design unit, supervision unit, project manager and technical person in charge.

2. The project management department must implement target management, and should put the construction organization network, annual target plan, process handover process, quality targets and management system on the wall, and refine the targets on a quarterly and monthly basis. This project will be subject to computer dynamic tracking and management, and each unit should be equipped with necessary equipment, software and personnel.

3. All managers and supervisors at the construction site must wear badges (employment badges) and dress uniformly in accordance with the relevant requirements of the management office.

4. The working roads at the construction site (construction site) should be kept smooth and marked with road signs. Machinery, tools and materials should be kept in good condition: machinery and equipment should be kept in good condition, clean and neatly parked; construction materials should be stacked in an orderly manner, stored in a regular and reasonable manner, and signs should be inserted.

5. The appearance of the construction site should be "three clean": the construction site is clean, the living environment is clean, and the construction products are beautiful and clean.

The trenches and ground within the site and construction area must be free of waste materials, garbage and oil pollution. The work must be completed, all materials used, and the ground cleared.

The interiors of office areas, work areas, warehouses and other places should be clean and orderly. Canteens, water supply and drainage, bathrooms and dormitories in living areas should meet fire protection, sanitation, ventilation, lighting and other requirements.

6. Signs should be set up in front of the main structures in the construction contract section to indicate the name, construction person in charge, technical person in charge, side station supervision, etc.

7. Areas within various mixing plants (stations) must be site hardened, materials should be stacked separately, isolation walls should be set up, and signs should indicate the names and specifications. For cement, steel, etc., rainproof and moisture-proof facilities must be installed.

8. The main mechanical equipment used on site (asphalt concrete mixing equipment, pavers, road rollers, etc.) should be equipped with "equipment signs" to indicate the name of the equipment, manufacturer, date of operation, usage status, name of the operator, etc.

For the main mixing equipment used on site, such as asphalt mixing plant, inorganic material mixing plant, cement concrete mixing station, etc., a mix ratio control board for mixture production and mixing should be set up in the control room .

9. At each construction point on the construction site, there should be a person in charge to direct the construction on site, and technical personnel should be on duty at the main parts. The on-site commanders and technicians should be familiar with the operating process requirements and quality standards.

10. The construction process should be reasonably arranged. Ancillary processes that may cause pollution to the road surface should be carried out in advance or corresponding protective measures should be taken. Construction or stacking of materials on the road surface is not allowed for processes that hinder the bonding between layers.

11. The sidewalks used by construction vehicles should be maintained on a daily basis to ensure that there is no dust when driving on sunny days, and there is no accumulation of water after rain, so as not to affect the normal life, production and traffic of local people.

12. Construction enterprises should be environmentally conscious and should not discard waste materials generated during construction. They should be transported to designated locations for processing and storage as required: For construction materials that are prone to environmental pollution, effective measures should be taken during transportation, storage and use. measures to prevent or minimize contamination.

13. All construction operations carried out on site must be carried out according to the pre-construction construction operation arrangements or the corresponding relevant regulations, so that they must be clearly organized, tense and orderly to prevent illegal operations and barbaric construction.

14. Supervisors should supervise and inspect the civilized construction of construction enterprises at any time, and promptly order rectifications if they cannot meet the requirements of civilized construction.

15. After the construction is completed, the restoration work of the land occupied by the supervision team shall be carried out, and the local roads, bridges, etc. occupied during the construction shall be restored.

3. Penalties

1. For project managers who violate these regulations, have accident risks at the construction site, or engage in brutal construction, the management office will order them to make rectifications within a time limit. If the rectifications still fail to meet the requirements, they will be cleared from the site within a time limit and reported to the Department of Transportation. The construction company shall be responsible for compensation for the resulting losses to the construction unit.

2. If the side station supervisor and his resident office turn a blind eye to the hidden dangers of the accident, the management office will give him a warning or dismissal, order the resident office to make rectifications within a time limit, and notify the criticism; any losses caused to the construction unit will be compensated or dismissed depending on the circumstances. Show up. How to establish a safety system during construction

The safety production responsibility system is the key to implementing safety production rules and regulations. Every construction site is a working place for an engineering project. The project leader (or project manager) is the first person responsible for safety production at this site. He is fully responsible for the safety production of this project.

In addition, a hierarchical safety production responsibility system headed by the project manager must be established. Identify the construction worker (foreman). Responsibilities of technicians, quality officers, safety officers, material clerks, secretaries, union presidents and team leaders for safe production. Each manager must implement the rules and regulations regarding production safety to the letter within their respective scope of work, and be responsible for production safety. Each construction site must have a full-time (part-time) safety officer responsible for supervising and inspecting the implementation of safety production rules and regulations, and correcting illegal commands and illegal operations